Name:EN IEC 61784-5-12:2018   Standard name:Industrial communication networks - Profiles - Part 5-12: Installation of fieldbuses - Installation profiles for CPF 12
Standard number:EN IEC 61784-5-12:2018   language:English language
Release Date:20-Dec-2018   technical committee:CLC/TC 65X - Industrial-process measurement, control and automation
Drafting committee:IEC/SC 65C - IEC_SC_65C   ICS number:25.040.40 - Industrial process measurement and control

SLOVENSKI STANDARD
01-april-2019
1DGRPHãþD
SIST EN 61784-5-12:2012
SIST EN 61784-5-12:2012/A1:2016
Industrijska komunikacijska omrežja - Profili - 5-12. del: Inštalacija procesnih vodil
- Inštalacijski profili za CPF 12 (IEC 61784-5-12:2018)
Industrial communication networks - Profiles - Part 5-12: Installation of fieldbuses -
Installation profiles for CPF 12 (IEC 61784-5-12:2018)
Industrielle Kommunikationsnetze - Profile - Teil 5-12: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 12 (IEC 61784-5-12:2018)
Réseaux de communication industriels - Profils - Partie 5-12: Installation des bus de
terrain - Profils d'installation pour CPF 12 (IEC 61784-5-12:2018)
Ta slovenski standard je istoveten z: EN IEC 61784-5-12:2018
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.05 9HþVORMQHXSRUDEQLãNH Multilayer applications
UHãLWYH
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD EN IEC 61784-5-12

NORME EUROPÉENNE
EUROPÄISCHE NORM
December 2018
ICS 35.100.40; 25.040.40 Supersedes EN 61784-5-12:2012
Supersedes EN 61784-5-12:2012/A1:2015
English Version
Industrial communication networks - Profiles - Part 5-12:
Installation of fieldbuses - Installation profiles for CPF 12
(IEC 61784-5-12:2018)
Réseaux de communication industriels - Profils - Partie 5- Industrielle Kommunikationsnetze - Profile - Teil 5-12:
12: Installation des bus de terrain - Profils d'installation pour Feldbusinstallation - Installationsprofile für die
CPF 12 Kommunikationsprofilfamilie 12
(IEC 61784-5-12:2018) (IEC 61784-5-12:2018)
This European Standard was approved by CENELEC on 2018-10-04. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden,
Switzerland, Turkey and the United Kingdom.

European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2018 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN IEC 61784-5-12:2018 E

European foreword
The text of document 65C/924/FDIS, future edition 2 of IEC 61784-5-12, prepared by SC 65C
"Industrial networks" of IEC/TC 65 "Industrial-process measurement, control and automation" was
submitted to the IEC-CENELEC parallel vote and approved by CENELEC as
EN IEC 61784‑5‑12:2018.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2019-07-04
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2021-10-04
document have to be withdrawn
This document supersedes EN 61784-5-12:2012 and EN 61784-5-12:2012/A1:2015.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.

Endorsement notice
The text of the International Standard IEC 61784-5-12:2018 was approved by CENELEC as a
European Standard without any modification.

Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1  Where an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
NOTE 2  Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 61918 2018 Industrial communication networks - Installation of EN IEC 61918 2018
communication networks in industrial premises
The normative references of EN IEC 61918:2018, Clause 2, apply.
NOTE For profile specific normative references, see Clauses A.2 and B.2.

IEC 61784-5-12
Edition 2.0 2018-08
INTERNATIONAL
STANDARD
colour
inside
Industrial communication networks – Profiles –

Part 5-12: Installation of fieldbuses – Installation profiles for CPF 12

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
ICS 25.040.40; 35.100.40 ISBN 978-2-8322-5942-9

– 2 – IEC 61784-5-12:2018  IEC 2018
CONTENTS
FOREWORD . 4
INTRODUCTION . 6
1 Scope . 7
2 Normative references . 7
3 Terms, definitions and abbreviated terms . 7
4 CPF 12: Overview of installation profiles . 7
5 Installation profile conventions . 8
6 Conformance to installation profiles . 8
Annex A (normative) CP 12/1 + CP 12/2 (EtherCAT™) specific installation profile . 10
A.1 Installation profile scope . 10
A.2 Normative references . 10
A.3 Installation profile terms, definitions, and abbreviated terms . 10
A.3.1 Terms and definitions . 10
A.3.2 Abbreviated terms . 10
A.3.3 Conventions for installation profiles . 10
A.4 Installation planning . 10
A.4.1 General . 10
A.4.2 Planning requirements . 11
A.4.3 Network capabilities. 11
A.4.4 Selection and use of cabling components . 14
A.4.5 Cabling planning documentation . 19
A.4.6 Verification of cabling planning specification . 19
A.5 Installation implementation . 19
A.5.1 General requirements . 19
A.5.2 Cable installation . 19
A.5.3 Connector installation . 19
A.5.4 Terminator installation . 19
A.5.5 Device installation . 20
A.5.6 Coding and labelling . 20
A.5.7 Earthing and bonding of equipment and devices and shield cabling . 20
A.5.8 As-implemented cabling documentation . 20
A.6 Installation verification and installation acceptance test . 20
A.6.1 General . 20
A.6.2 Installation verification . 20
A.6.3 Installation acceptance test . 21
A.7 Installation administration . 21
A.8 Installation maintenance and installation troubleshooting . 22

Figure 1 – Standards relationships . 6

Table A.1 – Network characteristics for balanced cabling based on Ethernet . 12
Table A.2 – Network characteristics for optical fibre cabling . 13
Table A.3 – Information relevant to copper cable: CP12/1, CP12/2 fixed cables . 14
Table A.4 – Information relevant to copper cable: CP12/1, CP12/2 flexible cables . 15
Table A.5 –Information relevant to copper cable: CP12/1, CP12/2 special cables . 15

IEC 61784-5-12:2018  IEC 2018 – 3 –
Table A.6 – Information relevant to optical fibre cables . 16
Table A.7 – Connectors for balanced cabling CPs based on Ethernet . 17
Table A.8 – Optical fibre connecting hardware . 17
Table A.9 – Relationship between FOC and fibre types (CP 12/1 and CP 12/2) . 17

– 4 – IEC 61784-5-12:2018  IEC 2018
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –
Part 5-12: Installation of fieldbuses –
Installation profiles for CPF 12

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC
Publication(s)"). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27