In order to ensure the safety of wind power lifting, strengthen technical safety inspection and standardize wind power lifting operations, these regulations are formulated in accordance with laws, regulations, procedures and systems of relevant national, industrial and public management, and in conjunction with the real situation of our project. This regulation applies to wind lifting projects under the project department. Chapter 2 Technical plan Article 1 Before the construction of large-scale lifting equipment installation and dismantling operations and wind-powered lifting operations, special construction plans or special technical safety measures (ci -after referred to as plans and measurements) shall be prepared and submitted for approval in accordance with prescribed procedures. For large-scale special plans, experts should be arranged to review and demonstrate. Iteme 2 The development of plans and measurements must meet the requirements of current regulations and laws and regulations, must be technically safe, reliable and usable, and the format must comply with company regulations. The plan must include relevant calculations, construction procedures, methods and safety assurance measures for lifting wind turbines under the most adverse site or environmental conditions. When construction conditions change, the plan and measurements must be revised by the preparation unit and approved by the original approving agency. If an expert demonstration is required, the unit that organized the preparation of the plan must arrange an expert demonstration. Article 3 Necessary calculations are required in the wind turbine lifting project plan. Items that must be calculated include, but are not limited to, the following: survey operationsage, loading and unloading of the heaviest tower, loading and unloading of the engine room, loading and unloading of the generator. unloading, turbine lifting and lifting in the engine room. Height checking, redundancy of the safety distance between the cabin and the crane boom when lifting the cabin, calculation of the endurance of the main crane post position, etc., the special lifting beams provided by the manufacturer must have quality certification documents and other metal cables, etc. Rigging
Does the wind lift plan require builder approval?
Introduction Does the wind power lifting plan require builder approval? In order to ensure the safety of wind power lifting, strengthen technical safety inspection and standardize wind power lifting operations, in accordance with national, industrial and public laws a