What professional certificates are needed to obtain wind power generation qualifications?

Introduction What professional certificates are needed for wind power generation qualifications? Wind power generation design qualifications belong to the professional type of the electrical industry and have two levels: A and B. Here are the application requirements

What professional certificates are needed to obtain wind power generation qualifications?

In terms of design qualifications, wind power generation belongs to the professional type of power industry, with two levels: A and B. Here are the application requirements for class B.

1. Engineering equipment

1. Structural Major: 1 Registered First Class Structural Engineer; 2. Electrical Major: 1 registered electrical engineer (electricity generation and transmission); major: 1 licensed water conservation and hydropower engineer; 4. major in planning: 1 major in water conservation and hydropower; 5. water and soil conservation major: 1 registered water conservation and hydropower engineer; Project economics and budget estimate Major: 1 engineer; 8. Hydrology and meteorology major: 1 engineer 9. Hydraulic/wind machines and metal structure major: 1 engineer.

2. Requirements for technical leaders: baccwinner, 10 years of design experience, registered professional qualifications or higher professional titles, and have presided over the design of 3 medium-sized projects or 1 large-scale wind turbine power generation project Project design.

3. Unregistered Personnel Unregistered personnel refers to unregistered personnel who lead the majors among the above personnel. Who are the main non-registered professionals here? It includes four engineers specializing in environmental protection, hydrology and meteorology, engineering economics and budgeting, hydraulic/wind machinery and metal structures.

Four.Other conditions When applying for design qualifications, the most important are the above three points, including registered capital, office space, etc., which can generally meet the requirements.

V. Notes 1. Engineerss geologists among the professional technical staff may also be replaced by registered geotechnical engineers; 2. Class B qualifications can only engage in the design of wind projects of less than 100 MW.

How to apply for the Class B wind qualification?

Those who specialize in wind power design mainly include Xinjiang Wind Power Engineering Design Consulting Co., Ltd., Xinjiang Wind Energy Company, China Fulin Wind Energy Engineering Co., Ltd., etc. , all of which specialize in wind power design, site selection, evaluation, wind farm layout and other aspects are outstanding, while substation design is average. Nowadays, all major electric power and hydropower design institutes are engaged in wind power design. They are old in the field of sub designstations and slightly lower in professional wind farm design. At present, there is no specialized ranking of wind power design institutes in China.

To apply for a new Grade B wind qualification, what are the nine professional qualifications required?

Start applying at the lowest level, i.e. Wind Energy Major Level B

Please contact us for more details.

Qualifications and credibility

(1) Have independent corporate legal personality.

(2) Have a good social reputation and have a registered capital of at least 1 million yuan.

Technical conditions

(1) The professional equipment is complete and reasonable, and the number of the main professional and technical personnel is not less than the number specified in the professional and technical personnel main technical. attribution table in quality standardsapplied professional ification.

(2) The main technical manager or general manager of the company Engineers must have a bachelor's degree or higher, more than 10 years of design experience, and have presided over at least 3 technical design projects of average size of the corresponding professional design type in the applied industry, or at least 1 large-scale design. technical design of projects and possess registered professional qualifications or higher professional and technical titles.

(3) Among the personnel specified in the main distribution table of professional and technical personnel, personnel not registered in the main specialty should have presided over a certain number of engineering designs of medium-sized projects of the corresponding professional. type of design in applied industry as a professional technical manager 2 elements, or not less thane 1 large-scale project technical design element.

Technical equipment and management level

(1) Have the necessary technical equipment and a fixed workplace.

(2) Have a relatively complete quality system and technology, operation, personnel, financial, records and other management systems.

Author: Shanghai Zhongting Design Qualification Consulting https://www.bilibili.com/read/cv12446112 Source: bilibili

1. 2 registered electrical engineers (electricity generation and transmission);

2. 1 first class structural engineer;

3. 5 registered water conservancy and hydropower engineers, whose professional backgrounds prior to registration were: 2 specialties in planning, 2 in geology. majors and 1 major in soil and water conservation;

4. 1 environmental protection professional

5. 2 professionalls hydraulic/wind machines and metal structures; >

6. 2 hydrometeorology professionals;

7. 2 economic and budgetary engineering professionals.

Other requirements:

1. All non-registered personnel must have performance requirements. He must have chaired at least 3 medium-sized or larger projects as a technician. leader in their previous professional design experience, including at least one large-scale project;

2. To upgrade, the company's performance must also meet the standards, and it is necessary to have completed the design. large-scale project or two medium-sized projects in wind power generation;

3. The demands on technical leaders have also increased, also in terms of performance.

China's new energy strategy began to focus on vigorous developmentof wind energy production. The installed wind power generation capacity will become higher and higher and maintain rapid growth for a long time. the perspectives are very broad.

If you need survey and design qualifications, after a series of agreements, we will recommend a more reliable company to you

(Here are the only prices for the social security)< /p>

Please: First-class licensed architect 180,000 yuan/year, 350,000 yuan for two years

Contact: First-class licensed structural engineer 200 000 yuan/year, 450,000 yuan for three years

p>

Department: Registered Architect Class II 50,000/year, 100,000 for two years

1: Registered Structural Engineer Class II 90,000/year 240,000 for three years

8: Registered electrical engineer (Generation, transport and transformation) 200,000/year, 550,000 for three years

9: Electrical engineer approved (foodation and distribution of energy) 180,000/year, 450,000 for three years

0: Licensed HVAC electrical engineer 180,000/year, 400,000 for three years

p>2 : Chartered Utility Engineer (Water Supply and Drainage) 200,000/year, 480,000 for three years

8: Chartered Utility Engineer (Electricity) 180,000/year, 380,000 for three years

4: Chartered Civil (Geotechnical) Engineer 220,000/year, 550,000 for three years

8: Chartered Cost Engineer 60,000/year, 120,000 for 2 years

p>

1: Approved supervisory engineer (Ministry of Construction) 60,000/year, 120,000 for 2 years

7: Graduate Urban Planner 100,000/year, 210,000 for 3 years< /p>

5: Certificate of professional title

< p>Intermediate professional title: 12,000/year

Senior professional title: 25,000/year

  • Popular Focus
  • Where is the cheapest battery wholesale?

    Where is the cheapest battery wholesale in Tangxia, Sanyuanli, Baiyun District? There is an enterprise specializing in the independent production of electric vehicles in Tangxia, Sanyuanli, Baiyun District, Baiyun Sanyuanli Avenue, Baiyun Sanyuanli Street
    08-02
  • Four 3.7V lithium batteries in series and parallel produce 7.4V/4.4A. How to reduce it to 4.8V/4.4A?

    Four 3.7V lithium batteries in series and parallel produce 7.4V/4.4A. I personally think it is impossible to reduce it to 4.8V/4.4A. Because the discharge platform of lithium batteries is generally set
    08-10
  • What are the materials of the negative electrodes of lithium batteries?

    What are the materials of the negative electrodes of lithium batteries? The main commercial applications of lithium batteries include graphite, which is a sheet of copper used to guide current and which does not react. another safe
    08-02
  • The difference between 18500 and 26500 batteries

    What is the difference between 18500 and 26500 batteries? The answer above is 18650. The person asking the question should ask what is the difference between 18505 and 26500 batteries. In the case of Fuant ER1
    08-02
  • What does 3.7V 80mAh written on a lithium battery mean?

    What does 3.7V 80mAh written on a lithium battery mean? 3.7 V, 80 mA = 0.08 A, H means 1 hour, or 3600 seconds. Taken together, it is
    08-02
  • How long does a lithium battery (cell phone battery) last?

    How long does a lithium battery (cell phone battery) last? The lifespan of mobile phone batteries, under normal conditions of use and without serious impact, the lifespan set by the manufacturer must be 5 years.
    08-02
  • Will lithium batteries explode when charging?

    Will lithium batteries explode when charged? Will lithium batteries explode when charged? Lithium battery explosions usually occur during the charging process, because the negative electrode material of lithium batteries is graphite or other carbon materi
    08-02
  • Parameters of lgdas31865 lithium battery

    Parameters of lgdas31865 lithium battery The parameters of lgdas31865 lithium battery are as follows: LGDAS31865 is a model 18650 lithium battery with a capacity of
    08-02
  • What are the main components of lithium battery electrolyte?

    What are the main components of lithium battery electrolyte? The composition of lithium battery electrolyte is shown below. 1. Ethylene carbonate: molecular formula C3H4O3. Colorless transparent liquid (>35℃), room temperature
    08-02
  • Who are the lithium battery manufacturers in Shandong?

    What are the lithium battery manufacturers in Shandong? Shandong Shengyang Power Supply Co., Ltd. and Shandong Weineng Environmental Protection Power Technology Co., Ltd. 1. Shandong Shengyang Power Supply Co., Ltd. is located in Shengyang, Qufu City.
    08-02
  • Types of drone batteries available in 2024

    Part 1. Types of drone batteries available in 2024In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in
    07-30
  • How long does it take to charge 26650 battery?

    How long does it take to charge a 26650 battery? The charging time for a 26650 battery is generally between 3 and 6 hours, but the precise time depends on the power of the charger and the capacity of the battery. in general
    08-02
  • For what?Sure, here's an article based on the phrase "For what?

    The simple yet profound question, "For what?" often serves as a gateway to deeper reflections on purpose and intention. It is a query that invites us to delve into the reasons behind actions, decisions, and circumstances that shape our lives and the wor
    08-02
  • Choosing the Right Cart Battery

    This comprehensive guide will walk you through everything you need about cart batteries, from understanding different types to making an informed purchase decision.
    08-02
  • 30mAh~500mAh 3.7 V Li-ion Battery

    Welcome to Ufine's collection of 3.7V lithium-ion batteries ranging from 30mAh to 500mAh. Explore a diverse range of compact and lightweight batteries suitable for various electronic devices,
    08-02
  • Here are 10 essential facts about drone batteries for 2024.

    10 Key Facts About Drone Battery for 2024 In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in the consumer, commercial, and industrial sectors. Below are the primary types of drone batteries avai
    08-02
  • Could you please explain the difference among IMR, ICR, INR, and IFR 18650 batteries?

    What is the Difference Between IMR, ICR, INR, and IFR 18650 Battery?In 18650 batteries, discerning the differences among IMR, ICR, INR, and IFR types is fundamental for tailored and efficient battery usage. These distinct
    08-02
  • Safety considerations for cart batteries

    Selecting the ideal cart battery is crucial for ensuring optimal performance and longevity of your electric vehicle or vaping device. This comprehensive guide w
    08-01