Required. Distributed wind energy technology research and development, market application, education and training, and staff training. There is a big gap between China and the United States in distributed wind power generation. Governments at all levels should increase investment in technological research and development, market application, education and training, and talent training. Distributed wind power needs indicators, and the maximum capacity that distributed wind power can access is an important indicator for the development of distributed wind power. Capacity evaluation is of great importance for rationally planning distributed wind power construction and avoiding wind curtailment problems.
Location of land acquisition for the 100,000 kilowatt wind projecte phase II of Yongcheng Chenfeng
Yes. According to the "Notice on Issues Concerning the Construction of Wind and Photovoltaic Power Generation Projects in 2020" issued by the National Energy Administration, the translation of the wind power indicator should meet the needs of the project. construction plan issued by the National Energy Administration and the project has completed the approval (filing) procedures as required, it can be translated if the conditions are met.
What does the wind power hat indicator mean?
Daqiao Town, south of Yongcheng Town, Shangqiu City, Henan Province, is a district administration of Yongcheng City, about 16 kilometers from the center of Yongcheng City. The city is an agricultural city and one of the main ecological demonstration zones in Henan province. It has rich agricultural resources and a magnificent ecological environment.ique. The land acquisition area for the project is a hilly area southwest of Daqiao City, extending to the S324 provincial road in the north and Xizhai Reservoir in the east, with a west longitude of 108.0434 degrees and a south latitude of 34.98 degrees, with a total area of approximately 1,000 acres. Relevant technical indicators of Yongcheng Chenfeng Phase II 100,000 kilowatt wind power project: The project has a total wind capacity of 100,000 kilowatts, using 70 2.5 megawatt wind turbines, the design wind speed is 16 meters/second and annual power. the output is about 30 million degrees, and the project construction period is 18 months. The construction of the 100,000 kilowatt Yongcheng Chenfeng Phase II wind power project is an important measure for Yongcheng City to develop renewable energy and clean energy. It will play a positive role inn increasing the proportion of local clean energy use, by optimizing the energy structure. and reduce environmental pollution. The construction of this project will further improve the local energy and industrial structure, stimulate local economic development and create more employment opportunities.
An index system to evaluate the efficiency of wind energy production.
Wind power hat indicators can help people understand the development status of wind power generation technology and optimize the design of wind power generation systems. wind power. This indicator system contains several indicators to evaluate different aspects of the wind power generation system, such as power generation, power generation efficiency, equipment reliability, etc. By comparing and analyzing these indicators, the performanceThese aspects of the wind power generation system can be understood and corresponding measures can be taken for optimization and improvement.