The installed wind capacity of Jilin will reach 10.1 million kilowatts in 2021. Early in the morning of December 30, 2021, when the Longhu Wind Farm was connected to the grid for power generation, the total installed capacity of Wind and photovoltaic power generation in Jilin Province reached 10.1 million kilowatts, accounting for about one-third of electricity generation. the installed electricity generation capacity of the province. According to statistics, the new energy consumption of Jilin Power Grid increased by 8.78% year-on-year in 2021, and the new energy utilization rate reached 97.48%.
Does Asia Pacific Technology have any wind energy projects?
Yes. The integrated project is located in Xiangyang and Erlong townships, Taonan city, Jilin province, with a total capacity of 1.15 million kilowatts, of which the capacity of the two-phase wind project is 1 million kilowatts , with atotal of 439 wind turbine units. produce electricity by the end of 2021. It is planned to install wind power generation in Erlong County, Taonan Town, Baicheng, Jilin. Taonan City is located in the northwest corner of Jilin Province and southwest of Baicheng City, with an excellent geographical location.
Asia Pacific Technology has wind energy projects. Because it can be seen from the "2022 Work Plan of Jilin Provincial Energy Bureau for Promoting New Energy Rural Revitalization Projects" that Asia Pacific Technology participated in the construction of 100 wind power projects. kilowatts or 200 kilowatts in each administrative village of Jilin Provincial Energy Bureau on June 13, 2022. Photovoltaic power generation projects, so Asia Pacific Technology has wind power projects.