No. Signing the framework agreement for distributed wind power is only a preliminary agreement of intent, indicating that the two parties have a common intention and goal of cooperation, but does not mean that the project is completed . The framework agreement includes the basic conditions of cooperation, the rights and obligations of both parties, methods of cooperation, financial investment, technical assistance, etc.
Do you want to ask how much area the distributed wind turbines occupy in the distributed wind power project in Dali County, Weinan City, Shaanxi Province? According to the announcement from Xinxing Company, owner of the wind power project, the production unit covers an area of approximately 35 square kilometers.
The distributed wind turbine has a total installed capacity of 20 MW and covers an area of approximately 35 square kilometers. It is planned to be designed as 8 machine generator unitsunique with one. wind capacity of 2.5 MW.
This will also be Sinopec's first wind project. When completed, the electricity connected to the grid will reach 42.865 million kilowatt hours per year, which is equivalent to saving 13,200 tons of standard coal per year, and can actually be used. reduce carbon dioxide and soot emissions.