Generator set installation includes lifting and unloading the unit, installing the smoke exhaust duct and air guiding hood (some customers do not require this, it depends (depending on the location and unit it is installed in), and it also depends on the specific unit on site. What if you went there? Lifting and unloading the 1,000 kW unit, installing the smoke exhaust pipe and air guide hood generally costs around 10,000 yuan. Wires and cables are generally handled by the customer's electrician with an electrician's certificate. Since the supplier does not have a clear understanding of the customer's circuit, it cannot connect the customer's wires and cables. The unit must be in place, the smoke extraction duct installed, and the air guide cover installed. Once the wires and cables are connected, the unit can be debugged without issue. Once the unit is debugged, personnelof the customer who manages the generator will be trained in its use and maintenance until it is. competent! If you have any questions, please contact Nanning Youkai Electrical and Mechanical in detail. Hope we can help you.
If the generator you are talking about is a magneto, it will usually be located on the right side of the engine
For forced air cooled engines, the magneto. the stator is installed on the right side of the box, the rotor is installed on the crankshaft, a fan is installed outside the rotor, and a fan cover is installed on the outermost side for protection (mainly made of pp ).
For large displacement water-cooled engines, the magneto stator is installed on the right side cover and the rotor is installed on the crankshaft. You can see it by opening the right side cover.