. Yancheng Xiangshui Wind Farm
There were 134 1.5 MW wind turbines with an installed capacity of 200 MW. By the end of October 2010, 126 wind turbines had been installed and 79 wind turbines had been successfully operated. connected to the grid to produce electricity.
Yancheng Dongtai Wind Farm
134 1.5MW wind turbines with an installed capacity of 200MW were completed and connected to the grid for power generation in 2009, in the scope of the second phase project with installed capacity; of 200 MW started in early 2010
p>. Nantong Rudong Longyuan Wind Farm
100 wind turbines of 1.5 MW, with an installed capacity of 150 MW, completed in 2007; The project, with an installed capacity of 100 MW, erected 67 1.5 MW wind turbines in 2009. Grid-connected power generation will be completed by the end of the year.
Nantong Rudong Longyuan Intertidal Experimental Wind Farm
6 wind turbines of 1.5 MW, 6 wind turbines of2 MW, 2 x 2.5 MW wind turbines and 2 x 3 MW wind turbines with an installed capacity of 32 MW, completed and connected to the grid by the end of September 2010
Nantong Rudong Dongling Wind Farm
47 1.5 MW wind turbines with an installed capacity of 70 MW, completed in 2010 Grid-connected power generation
Nantong Qidong Longyuan Wind Farm< /p>
67 1.5 MW wind turbines, with an installed capacity of 100 MW, completed in 2009 and grid-connected power generation
Nantong Qidong Huaneng Wind Farm
61 1, 5; MW wind turbines with an installed capacity of 91 MW were completed and connected to the grid for power generation in 2009. The second phase of the project is under construction with an installed capacity of 94 MW and 47 wind turbines of 2 MW.
Cixi Wind Farm
33 sets of 1.5 MW wind turbines with an installed capacity of 49.5 MW, which have been completed and connected to the grid for power generation electricity in 2008;
Parc éNanhui Wind Turbine
< p>11 sets of 1.5 MW wind turbines, with an installed capacity of 16.5 MW, which were completed and connected to the grid for power generation in 2006 p>. Pudong Laogang Wind Farm
13 sets of 1.5 MW wind turbines, with an installed capacity of 19.5 MW, completed in 2010 and connected to the grid for power generation
Chongming Dongtan Wind; Farm
Three 1.5 MW wind turbines, with an installed capacity of 4.5 MW, completed in 2006 and connected to the grid for electricity generation, with the installed capacity of the second phase of the 15 MW project, 10 1.5 MW wind turbines were installed, completed and connected to the grid for electricity generation in 2008