<正>Construction and management combined with seamless connection and smooth transition Background: Since the Suofengying Power Station of Guizhou Wujiang Hydropower Development Company was put into operation on August 17, 2005, it has reached 1,000 days of continuous and safe production as of May 12, 2008 Long-Term Record. The unit's equivalent availability coefficient is 93.41, which is nothing more than planned and forced shutdowns . It has been started and stopped more than 4,000 times with a 100% success rate, setting a new record for domestic hydropower. This achievement was achieved through the management model of “construction and management integration, seamless connection and smooth transition” implemented by Suofengying Power Plant before the units were put into operation.
Author unit: Huadian Guizhou Suofengying Power Plant
No.category: F426.61
DOI: CNKI:SUN:ZGDQ.0.2008-21-023
Text preview:
Construction and management combined with connection transparent and smooth transition Background: Since Suofengying Power Station of Guizhou Wujiang Hydropower Development Company was put into operation on August 17, 2005, from 2008 May 12, a long-term record of 1,000 days continuous and safe production has been achieved. The unit's equivalent availability coefficient is 93.41, which is nothing more than planned and forced outages. It has been started and stopped more than 4,000 times with a 100% success rate, setting a new record for domestic hydropower. And the result of this achievement