Wind energy supervision is difficult to learn.
It is certainly difficult to be a qualified supervisor, especially a responsible and high-quality supervisor. He must master various design and construction acceptance specifications and regulations, know the site, know the drawings, and understand the principles. He has a clear understanding of safety, quality and progress, especially regarding construction units, construction units and design units, which is a very difficult skill to acquire. But then again, it's easy to be a supervisor. He has no direct responsibility. Just blame the construction unit for what's wrong. Or it's better to have less supervision. Either way, build unit and build unit will do it. take direct responsibility for it.
The development of wind energy is causeded by excess equipment manufacturing capacity, and not by excessive development of wind energy.
The State encourages the development of renewable energy sources such as wind energy.
For this reason, everyone is optimistic about the development prospects of wind power, which is why they have invested in the establishment of factories to produce wind power generation equipment . There are currently 60 to 70 manufacturing plants producing wind energy equipment, not counting those trying to get into this field. Some experts estimate that there are around 150. Except for a few manufacturers with independent research and development capabilities, most manufacturers purchase foreign designs and technologies for production, repeat construction and investment. blind. Some sharply compare China's current competition in the field ofhe wind power equipment faces competition from China in the refrigerator industry, which has the characteristics of a swarm of bees.
On the other hand, the technological delay of equipment and the difficulty of connecting wind farms to the grid make wind energy equipment uncompetitive for export, and supply exceeds demand in the construction of existing wind farms.