The National Development and Reform Commission has documents that stipulate that wind energy investment projects with a total installed capacity of more than 50 MW must be submitted to the National Development and Reform Commission. the reform for approval. Projects under 50 MW may be approved by the province. Development and Reform Commission. Wind farms under construction now generally have 33 units*1.5 MW. The Provincial Development and Reform Commission has solved this problem, mainly because the approval process is relatively quick.
Phase I Project of Shanshan Loulan Low Energy Complementary Wind and Solar Power Plant
It depends on the average wind power, turbine efficiency, operating costs, the price of the electricity network, etc. of the place. you choose. The close relationship and government subsidies sont all unknown and the recovery period cannot be estimated.
The estimated rate of return on investment in wind energy for general businesses is approximately 7% before taxes. If you want to get involved in this industry, choose wind turbines with higher profitability and companies with good after-sales. sales reputation to reduce operating costs. Choosing a site with stable wind power will significantly increase electricity production. Actively negotiate with the electricity sector and government for greater assistance.
The 50MW wind power project of Yinfeng Shanshan Wind Farm Project is located in the Gobi area between Xiaocaohu Station and Palm Mountain in Shanshan County. The center of the wind farm is about 90 km from the administrative center of Shanshan. County The terrain of the site is flat. The type of relief is the Gobi Desert, with ae altitude of approximately 990 m to 1,080 m.
This wind farm is located on the west side of Baili Wind Zone, one of the nine major wind zones in Xinjiang. This area has obvious regional advantages in wind resources, the wind speed changes slowly, and the wind speed changes slowly. the probability of sudden changes in wind speed is lower than in the Baili wind zone. At the same time, the maximum wind speed that occurs once every 50 years is also lower than that of the core area of Baili Wind Zone, which is conducive. to the high efficiency and safe operation of wind turbines. After the completion of the wind farm, it will play a certain positive role in promoting the economic development, local tourism and employment of Shanshan County. At the same time, the wind farm is the first wind power development project in Shanshan County; have an imppositive act on the development and development of green energy in Shanshan County. The use is of great importance.