Applicants who need to configure 2 hours of energy storage and implement market-oriented conditions for leased or self-built electrochemical energy storage power plants must have completed and completed before every 10 000 kWh of rented or self-built electrochemical energy storage plant. the complete exam. If the company is online, 0.1 points will be added to reporting companies that rent or build themselves. According to the "Notice on Realizing Competitive Allocation of Grid-Connected Scale of the First Batch of Wind and Photovoltaic Power Generation Projects in 2022" issued by the Energy Bureau, it can be seen that the Competitive allocation requirements for wind energy and photovoltaic development require allocation of 2 hours of energy storage, and for rental or ownership. For applicants who implement ori conditionsentered into the market for the construction of electrochemical energy storage power plants, 0.1 points will be added for every 10,000 kWh of leased or self-built electrochemical energy. Grid-connected storage power plant before full review.
Various Competing Requirements for Wind and Photovoltaic Power Development
Introduction Various competition requirements for the development of wind and photovoltaic energy require the allocation of 2 hours of energy storage, and applicant companies that implement market conditions for rental or storage power plants self-built electrochemica