1568. According to relevant information from the China Electric Power Administration and the Bureau of Statistics, in 2022, the usage hours of wind power projects in Liaoning were: 1,568 hours. In July 2022, wind power generation of industrial enterprises above the specified size in Liaoning Province. fell 31.8% year-on-year, reaching 840 million kilowatt hours, the growth rate is 66.9 percentage points lower than the same period in 2021. Wind power generation refers to the conversion from the kinetic energy of the wind into electrical energy. Wind energy is a clean, non-polluting renewable energy that has been used by people for a long time, mainly through windmills to pump water, grind flour, etc. People are interested in how to use wind to generate electricity.
Liaoning Wind Project Usage Hours in 2022
Introduction The number of operating hours of Liaoning wind power projects in 2022 is 1,568. According to relevant information from the China Electric Power Administration and the Bureau of Statistics, in 2022, the operating hours of projects wind turbines in Liaoning