The investment cost of 100,000 kilowatts of wind power generation is 400 million.
The total investment in the 100,000 kilowatt Sanduntan wind project of Yumen Xingyang Wind Power Co., Ltd. is about 490 million yuan, and it is planned to use 16 wind turbines with a single capacity of 6.25 MW.
Investment cost is the sum of monetary expenditures of materialized labor and living labor consumed by capital investment projects. Its composition is as follows: the cost of construction and installation projects includes direct costs, indirect costs and independent costs of construction and installation projects, etc.
Copper production rate of wind turbines
Gansu Zhongdian Jiuquan Fourth Wind Power Co., Ltd. is a limited liability company registered on 07/06/2009 (wholly owned by a foreign legal entity), whose addressregistered is located in South Street, Yumen Town, Yumen City, Jiuquan City, Gansu Province.
The social credit code/unified registration number of Gansu China Jiuquan Fourth Wind Power Co., Ltd. is 91620000690359175N. The legal entity is Xu Guangsheng.
The business scope of Gansu Zhongdian Jiuquan Fourth Wind Power Co., Ltd. is as follows: construction and operation of 100 MW wind farms, production and sale of generated electricity to the grid, sale of carbon dioxide emission reductions accordingly; to MDP or VER.
View more news and information about Gansu Zhongdian Jiuquan Fourth Wind Power Co., Ltd. via Aiqicha.
Power output is 8% to 10% of motor weight.
The copper content of the motor is approximately 8-10% of the total motor weight. There is no fixed formula. Normally, it can be calculated in tenths. The copper content of a motor of 300 pounds is about 30 pounds.
Wind resource characteristics of wind farms
Normally, the wind speed in Jingtai area is the highest from March to May of the year, and the wind speed is weaker from September to January of the following year. In other words, the wind speed in spring is large, windy in autumn and winter. In Yumen area, the wind speed is higher from November to April of the following year and weaker from July to September, that is, the wind is strong in winter and spring and light in summer. The wind speed in Yumen and Jingtai is higher during the day and lower at night.
In actual operation, the wind resources of each wind farm have decreased. The actual annual average wind speed of Yumen Wind Farm is 6.80 m/s and the effective annual wind speed (3.0 m/s-20.0). m/s) hours is 7,509 hours; the average annual speed ofThe wind speed of Jingtai Wind Farm is 4.99 m/s, and the effective annual wind speed (3.0 m/s - 20.0 m/s) hours is 5,620 hours.