Guizhou Wujiang Hydropower Development Co., Ltd. (Wujiang Company for short) is China's first river basin hydropower development company, established in 1992 with the approval of the State Council by relying on the successful experience of international hydropower development and promoting waterfall. rolling global development of hydroelectric basins. In accordance with the development policy of "basin, cascade, rolling and comprehensive", we will develop, construct, operate and manage cascading power plants in the Guizhou section of the main course of the hydropower basin. Wujiang River. The ownership rate is 51% for China Huadian Corporation and 49% for Guizhou Province.
Hongjiadu Power Station (600,000 kilowatts), Dongfeng Power Station (695,000 kilowatts), Suofengying Power Station (600,000 kilowatts) and Wujiangdu Power Station are affiliated toGuizhou Wujiang Hydropower Development Co., Ltd. kilowatts), Goupitan Power Station Construction Company (power station) (3 million kilowatts, under construction, 3 units of 1.8 million kilowatts have been put into operation), Silin Power Station Construction Company (power station) (1.05 million kilowatts, under construction, three units of 787,500 kilowatts have been put into operation), Shatuo Power Station Construction Company (1.12 million kilowatts, under construction), Bijie Thermal Power Plant (300,000 kilowatts, 55% share ), Guizhou Jiangdian Industrial Co., Ltd. <正>Construction and management combined with seamless connection and smooth transition Background: Since the Suofengying Power Station of Guizhou Wujiang Hydropower Development Company was mwas put into service on August 17, 2005, as of May 12, 2008, it achieved a long-term continuous record of safe production for 1,000 days. The unit's equivalent availability coefficient is 93.41, which is nothing more than planned and forced outages. It has been started and stopped more than 4,000 times with a 100% success rate, setting a new record for domestic hydropower. This achievement was achieved through the management model of “construction and management integration, seamless connection and smooth transition” implemented by Suofengying Power Plant before the units were put into operation. Author unit: Huadian Guizhou Suofengying Power Plant Category number: F426.61 DOI: CNKI:SUN:ZGDQ.0.2008- 21-023 Text overview: Construction and management combined with seamless connection and smooth transition Background: Since the cSuofengying Power Plant of Guizhou Wujiang Hydropower Development Company on August 17, 2005, from 2008 On May 12, a long-term record of 1,000 days of continuous and safe production was achieved. The unit's equivalent availability coefficient is 93.41, which is nothing more than planned and forced outages. It has been started and stopped more than 4,000 times with a 100% success rate, setting a new record for domestic hydropower. And the result of this achievement