Inner Mongolia Fengyuan New Energy Technology Co., Ltd. is a limited liability company (individual business of individuals) registered in Tongliao City, Inner Mongolia Autonomous Region on 04/25/2018. in Lanwan, the water area of Tongliao Economic and Technological Development Zone, Inner Mongolia Autonomous Region A22#-101.
The social credit code/unified registration number of Inner Mongolia Fengyuan New Energy Technology Co., Ltd. is 91150591MA0PU3KP3L, the legal entity is Huo Liyong and the company is currently open for business.
The business scope of Inner Mongolia Fengyuan New Energy Technology Co., Ltd. is: research and development of wind power and photovoltaic technologies, technology promotion, transfer of technological achievements, technical consulting, technical training, technical transformation, and technical services; energywind turbine, photovoltaic. Consultation of relevant commercial information; operation and maintenance services for wind farms and photovoltaic power plants; sale, testing and maintenance of various spare parts and consumables for wind turbines and photovoltaic equipment; equipment, electronic equipment and electrical equipment; wind and photovoltaic special tools, hardware tools and vehicle rentals; sales of wind and photovoltaic special tools, mechanical equipment, electrical equipment, Wujinjiaodian, electronic products, labor protection supplies and daily necessities; recycling of waste from wind and photovoltaic equipment. In this province, the current share capital of businesses is average.
View more news and information about Inner Mongolia Fengyuan New Energy Technology Co., Ltd. via Baidu Enterprise Credit.
D’s addressatang Wind Power in Xiaojieji Town, Kailu County is located at No. 25, Building 14, Shengshi New Town, Dongguan Street, Kailu County, Tongliao City, Inner Mongolia Autonomous Region. . The total planned capacity of the wind farm in this project is 49.5 MW, and it is planned to install 15 wind turbines with a single unit capacity of 3.3 MW. The output voltage of wind turbines is 690V, and the wiring method of the unit is "one machine, one transformer" is adopted. And a new 220 kV booster station was built. After the project is put into operation, the average annual grid-connected power will be 213,429 MW·h, the annual full-load equivalent usage hours will be 3,235 hours, and the capacity factor will be 0.37. It will provide heating energy in winter. newly built residential communities in Ganqika town, Kezuohou banner.