Yes. The wind power generation of Huadian Group in Baishan, Jilin is real. Huadian Group Co., Ltd., called China Huadian, was established on December 29, 2002. It is one of five wholly state-owned power generation enterprise groups established by the reform of the national electricity system. Jilin Baishan's wind power generation is real, and all wind power projects have been completed and put into operation.
Jilin wind power installed capacity in 2021
The wind speed is low and the market demand is insufficient.
1. Wind speed is low. January to March is the season when temperatures are lower in Jilin province. The weather is cloudy, rainy and snowy, and the wind speed is low, resulting in reduced wind power generation and high abandonment rate.
2. Insufficient market demand. When seasonal electricity consumptioncity is relatively sluggish and market demand is insufficient, power companies are subject to capacity constraints or market pressure, leading them to abandon part of their wind energy production.
The installed wind capacity of Jilin will reach 10.1 million kilowatts in 2021. Early in the morning of December 30, 2021, when the Longhu wind farm was connected to the grid for power generation, the Total installed wind and photovoltaic power generation capacity in Jilin Province reached 10.1 million kilowatts, accounting for about one-third of electricity generation. the installed electricity generation capacity of the province. According to statistics, the new energy consumption of Jilin Power Grid increased by 8.78% year-on-year in 2021, and the new energy utilization rate reached 97.48%.