Xinshengdian Town, north of Xiajin County. According to Baidu's map query, the planned installed capacity of the China Resources Xiajin wind project is 50 MW. The average elevation of the project area is approximately 25 to 28 meters. The relief is a plain. The site is relatively open and small. fluctuations. The provincial road S254 crosses the middle of the site. The address is in Shandong Province, north of Xiajin County, Dezhou City.
How much are the installation fees for offshore wind equipment?
The current installed photovoltaic power generation capacity in Pingyuan is 40 MW. Concord Solar Power Co., Ltd. was built with an investment of 500 million yuan from China Wind Power Group. It used the hydraulic construction land on the east side of the Xiangjiahe Reservoir in the plains to install more than 130,000 polysilicon photovoltaic panels.installed capacity of 40 megawatts, the largest distribution-type photovoltaic energy production project in the province. Once the project is completed, it will be able to produce 60 million kilowatt hours of electricity per year. This would save around 16,640 tonnes of standard coal per year and reduce emissions by around 48,000 tonnes of carbon dioxide, 592 tonnes of sulfur dioxide, 17.6 tonnes of soot and 4,800 tonnes of ash. The annual turnover can be around 60 million yuan, and the average annual tax paid is 15 million yuan.
Does this mean the installation costs of offshore wind generators?
The lifting and installation costs of wind turbines will vary greatly depending on different geological conditions, different terrains and climates;
In lowland areas, including the Gobi, lifting installation costs are mainly inbe 120,000 and 200,000, which vary depending on local climatic conditions;
In mountainous areas, this is the wind. mountain farms, etc., and crane installation fees The installation fees mainly range from 250,000 to 400,000;
At the seaside, in the intertidal zone, etc., the fees crane installation costs basically range from 250,000 to 350,000;