A test is absolutely necessary. First of all, all indicators of the generator are tested one by one and all meet the requirements. Then it is connected to the network for a test. Add a small load first, then increase slowly. and test both active and non-active power, not only the generator indicators, but also the various steam turbine indicators. Regardless, there's a lot of data, and it sometimes takes several months to test.
Is a test operation necessary before the power plant is connected to the grid?
Introduction If a test run is required before the power plant is connected to the grid, it must be tested first, all indicators of the generator are tested one by one, and all meet the requirements. Then the power plant is connected to the grid. test operation. Add a