Refers to his tower. The lower part of the tower is made of concrete and the upper part is made of steel tower. The specific height depends on the situation.
The mixed tower has a fully pre-stressed concrete tower. Compared to flexible steel towers, this tower has greater overall structural rigidity and a greater damping coefficient, ensuring that the unit will remain stable during installation and throughout its life cycle. The small amplitude of the unit ensures a stable wind angle of the turbine system, more stable power generation and significantly reduces operation and maintenance costs.
The tower can be divided into reinforced concrete and steel structures depending on the materials. The all-steel structure tower has a low natural vibration frequency and is also called flexible tower. The partly concrete and partly steel structure is called a composite tower.
Construction organization design should include preparation basis, project overview, construction deployment, construction progress plan, preparation plan construction and resource allocation, main construction methods, construction site layout and main construction management plan. .
The wind booster station is part of the entire wind farm and is generally divided into a unit project. The main content of the unit project construction organization design is as follows:
Project overview (mainly describing the overview of the booster station, such as geographical location, topography , geological conditions, floor area, scale, etc.)
Construction deployment (such as: organizational structure of project personnel, distribution of management personnel, managementnsabilities)
Construction progress plan (objectives of the construction period, emergency measures, etc.)
Construction preparation and allocation of resources (people, Planning and configuration of materials and machines)
Main construction plans (earthworks, concrete, steel, formwork, scaffolding, primary electricity, secondary electricity, finished product protection measures)
Safe and civilized construction, occupational health and environmental management measures
Construction site layout (floor plan)