The main reason is that the development is too fast, the power grid supporting facilities cannot keep pace, and the peak shaving capacity is not up to par. Additionally, the wind turbine factory is too eager to continue growing, absorbing and digesting energy. weak development of the innovation process and vicious low-cost competition. Recently, as some wind turbines cannot meet the complete low-voltage maintenance requirements, the power grid, wind farms and machine manufacturers are discussing solutions.
Does the state currently provide subsidies for wind farms?
For wind power generation, the concept of how many levels of wind power are used is too approximate. Due to the different capacities of the generators, the wind speed requirements are also somewhat different. However, generally,If the wind speed exceeds 3 m/s, the wind turbine can produce electricity. However, wind energy production does not depend on the local wind speed, but on the annual operating time of the local wind farm that produces electricity for that wind turbine. Based on the current wind power subsidy price set by the state, if the electricity generation duration is less than 2,000 hours that year, there will be no profit.
How to produce electricity when there is no wind in a wind power plant
For production equipment subsidy policies, you can consult the "Measures temporary workers for the management of special funds for the Industrialization of wind energy equipment". If you meet the conditions stipulated therein, subsidies will be given at the level of 500 yuan/KW, with complete machine manufacturing enterprises and key component manufacturers each receiving50%.
The price of electricity on the grid per kilowatt hour of electricity varies from location to location. The specific price can be checked. It is linked to the area where the construction is invested, to the agreement with the electricity network at what time. the tender for the wind farm and the capacity of the wind power plant operator. But they are much higher than those for coal. The government levies 1%/kWh (civil and fertilizer) and 2%/kWh (industrial) on other electricity tariffs on the Internet to subsidize wind energy.
The subsidized electricity price ranges from 0.15 to 0.28 yuan/kWh, and the national average is around 0.24 yuan/kWh.
I have to give points, I wrote so much
As it is a wind power plant, professional equipment will be used to judge and analyze the wind field in the early stages of construction. Only when the conditions are met will the wind farm be judgedand analyzed. Therefore, wind power plants experience different winds every day, which generate electricity for the generators. If there is really no wind or the wind speed does not meet the requirements, the wind turbine will not produce electricity.