Hello, the build process is as follows:
1. Understand in advance the water resources situation and the connection situation to the local electricity network;
2. determination, go to the National Development and Reform Commission or the Economic and Trade Bureau to prepare a preliminary investment plan
3. Preliminary investigation and design, preliminary feasibility report,
4. the project is feasible and the return on investment is high, so decide to do it; formal approval document, grid connection agreement, water resources demonstration, environmental protection demonstration, soil and water conservation plan, preliminary report; treatment of other procedures
5. Formal design, construction according to the design document, if the water height is low, power plant after dam, dam construction, factory construction,installation, booster station, lines, electricity generation. High water head, dam, inlet gate, canal, tunnel, forebay, pressure pipeline, factory building, auxiliary factory building, booster station, lines, power generation
< h3>What procedures and documents are necessary for the transfer of electricity, water and gas?Application for water catchment permit\x0d\ \x0d\ Basis of implementation \x0d\ 1. "Water Law" \x0d\ Article 48 Units that directly draw resources water from rivers, lakes or the subsoil and individuals must, in accordance with the provisions of the national water catchment permit system and the system of paid use of water resources, contact the administrative service of the water or river basin management agency to obtain a water catchment permit, pay the water resource charge and obtain the right to water catchment. However, small amounts of waterare excluded for family life and for the consumption of livestock and poultry dispersed in freedom and captivity. \x0d\ 2. "Regulations on the Administration of Water Licenses and Collection of Water Resources Fees" (Order of the State Council No. 460) \x0d\ Article 2, paragraph 2, Units and Individuals who use water resources, except for the circumstances specified in Pursuant to Article 4 of this Regulation, all must apply for a water abstraction permit and pay water resource charges. \x0d\ 3. "Water intake management measures of Fujian Province" (adopted at the 18th meeting of the Standing Committee of the Eighth People's Congress of Fujian Province in 1995) \x0d\ Except under the circumstances specified in article 5, a water catchment permit will be applied to the administrative water service. \x0d\ \x0d\ Conditions of application \x0d\ 1. Acceptable objects: 1. Water consuming units and individus whose daily surface water withdrawal is greater than 200,000 m3 2. Water consuming units and individuals whose daily groundwater withdrawal is greater than; 10,000 m3 3. Water abstraction in administrative areas of districts and cities or in river basins affects water abstraction from other districts and cities; 4. The storage capacity of reservoirs and hydropower plant projects is more than 100 million m3; the capacity of electricity production companies and institutions is greater than 250 MW. \x0d\ 2. Applying for Water Catchment License: If an organization or individual plans to use water catchment projects or facilities to directly draw water resources from rivers, lakes or underground , and the construction project successfully demonstrates water resources, it can apply for a water catchment permit. \x0d\ Construction projects subject to the systemth of government approval: submit a water catchment application before submitting the (pre)feasibility study report of the construction project \x0d\ Construction projects included in the catalog of projects approved by the government: Before to submit the project; applicationPlease submit a water catchment application before reporting;\x0d\Construction projects included in the Government Registered Project Catalog and other construction projects not included in the National Capital Construction Management Procedures: submit a water catchment request before the start of the water catchment project. . \x0d\ Once the water catchment application is approved by the approving authority, the applicant may begin construction of water catchment projects or facilities. \x0d\ 3. Application for water intake permit: Once the water intake project or installation is completed and put into trial operation for 30 days, youcan apply for a water intake permit. \x0d\ \x0d\ Application documents\x0d\ 1. Basic documents for the construction project (one copy);\x0d\ 2. Water catchment permit application report (one original copy);\x0d \ 3. Water catchment project or installation acceptance application report (one original copy); \x0d\ 4. Water Catchment Permit Application Approval Document (one original copy); \x0d\ 5. Construction and experimental operation of water catchment projects or facilities (one original copy); 6. Certification status of water metering facility measurements (one copy); \x0d\ 7. Construction and test operation of water-saving installations (one original copy); 8. Implementation of wastewater treatment measures (one original copy) 9; . During the testing operation, a water quality test report (one copy) for water sampling and withdrawal issued by a unite possessing the corresponding qualifications. 10. Water storage projects such as dams and dams must also submit a water storage operation report. plan (a copy of the original) \x0d\ 11. The groundwater intake project must also submit a complete diagram of the well pumping test results and a water quality analysis report water (one copy). \x0d\ \x0d\ Handling Process\x0d\ 1. Acceptance of water intake project: If the water intake project or installation is completed and has been tested for 30 days, the person responsible for the water intake must contact the Ministry of Water Resources. for acceptance of the water intake project with the relevant documents and materials. \x0d\ 2. Application for Water Catchment Permit: Once the water catchment project or facility has passed acceptance inspection, the applicant must submit an application to the Department of Water Resources waterwith the water abstraction permit application report and documents relating to acceptance of completion. of the water catchment project or installation. \x0d\ 3. Issuance of permit: The water catchment permit will be issued within 7 working days from the date of acceptance of the application. \x0d\ 4. Delivery of results: The applicant must go to the Administrative Service Center of the Department of Water Resources to obtain a water permit, or the Administrative Service Center of the Department of Water Resources will send the certificate to the applicant . \x0d\\x0d\ Deadline: 7 working days\x0d\ Fees are free\x0d\ \x0d\
New and old owners must provide the following information respectively to the water companies, electricity and gas. Take a number in the service hall. \x0d\The documents to bring are:\x0d\1. The original and copy of the new owner’s certificate of ownership. \x0d\2. Original and copyof the identity card of the new and former owners. \x0d\3. If the new owner's bank debits the fees, bring the original and copy of the bank book with which the fees were deducted. \x0d\ \x0d\ For water, go to the water company service hall. Electricity is supplied to the power company's service hall. For gas, go to the gas company office. \x0d\You can find the specific phone number and address by calling local 114.