It doesn't matter whether the water height is high or low, it depends on the corresponding water height, the demand of the power grid and the amount of excitation added. The power of the hydrogenerator is multiplied by 24 hours!
The installed capacity is 42 MW. When working, you can use full power, overpower or underpower. Normally, this is 42*24 (MW) 42,000 kilowatt hours of electricity per hour, multiplied by 24
Installed Capacity Capacityis the full name for “installed power plant capacity”, also known as “power plant capacity”. Refers to the sum of the nominal power of all steam turbines or hydroelectric production units installed in thermal or hydroelectric power stations. It is one of the main indicators that characterize the scale of construction and power generation capacityof a thermal power plant or a hydroelectric power plant.
Installed capacity refers to the nominal active power of the generators actually installed. in the system. The installed capacity is 2*150,000 kilowatts, or two production units of 150,000 kilowatts.
The theoretical electricity production capacity of each unit per hour is 150,000 kilowatt hours.
For example, a power plant with an installed capacity of 1 million kilowatts can produce 650,000 kilowatt-hours of electricity per hour based on a 35% loss. It can generate 1 million kilowatt hours of electricity in 1.55. hours, or approximately 39 million kilowatt hours per day. The common unit MW means megawatt, 1 megawatt (MW) = 1,000 kilowatts (KW), 150 MW = 150,000 KW, or 150,000 kilowatts.