Gaozhou Pingshan Hydropower Station is a national enterprise legal entity registered on 04/26/2012. Its registered address is No. 38, Pingjiang 3rd District, Gaozhou City.
The social credit code/unified registration number of Gaozhou Pingshan Hydropower Station is 9144098159408583X8. Chen Dongming legal entity is currently in operation.
The business scope of Gaozhou Pingshan Hydropower Station is: hydropower generation; home rental and river dredging projects; (Projects that require approval according to law can only carry out commercial activities after approval by relevant departments).
View more information and information about Gaozhou Pingshan Hydropower Station via Aiqicha.
1. The first phase of the Huaneng Pingliang power station installed four 300,000 kilowa unitstts. It constitutes one of the core power stations of the North West electricity network. it generated more than 50 billion kilowatt hours of electricity. Various technical indicators Ranked at the forefront of the same industry in Gansu Province. As one of the first 14 enterprises in Gansu to join the "Thousand Enterprises National Energy Conservation Action" and the only power company among them, Huaneng Pingliang Power Station has not forgot to fulfill its social responsibilities and actively accelerated energy saving and emissions reduction while stimulating local economic development. After the implementation of the first phase of the desulfurization project, it can reduce sulfur dioxide emissions by 237.65 million tons and reduce smoke and dust by 870 tons per year.
2. Datang Chencun hydroelectric power station is located in the upper reaches of the riverre Qingyi, in the mountainous region of southern Anhui, Jingxian County, on the shore of Taiping Lake, between the tourist resort of Huangshan Mountain and the Buddhist Holy Land Jiuhua Mountain. It is currently the hydropower station with the largest installed capacity in Anhui province. In the electricity system, it is mainly responsible for regulating network peaks and providing emergency backup.
Datang Chencun Hydropower Station is divided into two levels of development. The first-level Chencun station and the second-level Jicun station have a total installed capacity of 214 MW.
Recruitment conditions: Freshly graduated full-time university students, good health, IT level two or above, English level four or 425 points.
Salary: implement Datang Group’s unified salary standards.
Social assistance: manage various social insurancesfor employees in accordance with the law and implement systems such as housing accumulation fund, company annuity, company supplementary medical insurance, paid leave, health recovery and examinations regular physical exercises.
Address: No. 70, Muqiao Road, Jing County, Anhui Province
Zip code: 242508
Telephone number: 0563-5029476 Fax : 0563-50294761
E-mail: [email protected]
Contact: Hong Zhengdong, Human Resources Department of Datang Chencun Hydropower Station
From the perspective of media reports and national strategy, Huaneng Pingliang Power Station is better.