3.
1. Xiluodu Hydroelectric Power Station. Xiluodu Hydropower Station is located in the Jinsha River Gorge section, bordering Leibo County, Liangshan Yi Autonomous Prefecture, Sichuan Province, and Yongshan County, Zhaotong City, Yunnan Province. It has a total installed capacity of 13.86 million kilowatts, ranking fourth. world. The first batch of units of the plant was commissioned in July 2013.
2. Baihetan Hydroelectric Power Station. Baihetan Hydropower Station is located in Ningnan County, Liangshan Prefecture, Sichuan Province and Qiaojia County, Zhaotong City, Yunnan Province. Its total installed capacity is 16 million kilowatts, the second largest in the world. The first batch of units will be put into production before July 2021.
3. Jinping Tier 1 Hydroelectric Power Station. Average annual electricity productioncapacity of the Jinping I hydroelectric power station is 16.62 billion kilowatt hours. The total installed capacity is 3.6 million kilowatts. It is located on the Yalong River at the junction of Yanyuan County and Muli County, Liangshan Prefecture, and has an adjustable storage capacity of 4.91 billion cubic meters. increases the average output of Sichuan's power grid by 22.5% during dry periods, thereby increasing the Yalong River. Downstream power plants increased their electricity output by 6 billion kilowatt hours, bringing the Xiluodu, Xiangjiaba, Yangtze Three Gorges and Gezhouba hydropower plants to the Jinsha River. River to increase its electricity production by 3.77 billion kilowatt hours.
In Shehong City, Sichuan, the Luosichi section of the middle Fujiang River has been fully developed for half a century thanks to the "three-way" strategy.s shutters » Weijiayan, Xiaoluodian and Daluodian. the total capacity is only tens of millions, the development methods have changed from diversion type to river bed type, and the development methods have changed from "primitive" to "modern". This is a rare and very rare example of hydropower development and construction in China. Interesting events include Xiaoluo Power Station which is the first diversion type hydropower station to be built on the main stream of Fujiang River in Suining City, Daluo Power Station (Shuuchi Electric Navigation Project) which is the first river bed type hydropower station, and Weijiayan Power Station is the first to generate electricity, but these three power stations actually use the same water height section of the main stream of the Fujiang River. If the Xiaoluo power station is thefirst hydroelectric power station to be officially built, Weijiayan. is an experimental power station and construction power station, and Daluo Power Station. This is the real expansion project that fully utilizes the water resources of this section of the river. It came to fruition after more than half a century. is very meaningful to sort out the main moments in detail:
——On September 10, 1956, the construction of the Luochi Hydroelectric Power Station (Xiaoluo Power Station) began, with a planned installed capacity of 2X250 kilowatts
——May 8, 1956 In August, the Weijiayan Hydroelectric Power Station was built with an installed capacity of 84+125 kilowatts
——In 1959 , the factory buildings for three small units of Xiaoluo Electric were built and put into operation in 1960.
——1965 On February 4, the expansion project of Xiaoluo Electric began, increasing the capacity of 4X800kilowatts, and was completed in 1971.
——On September 28, 1987, the construction of the Luochi Electric Aviation Project began with a construction scale of 3 x 10,500 kilowatts. The three units were connected to the grid for electricity generation in March. 1991, November and January 1992.
——In February 1992, three small units (3 x 250 kilowatts) of Xiaoluo Power were removed and four units of 4 x 800 kilowatts were retained. The entire power plant has been transferred to the annual seasonal (rainy season) power generation mode. p>
——From September 2014 to December 2015, Xiaoluo Electric Co., Ltd. underwent technical expansion and transformation, and the installed capacity was increased from 4X800kW to 4X1150kW,
< p> ——2019 In 2019, the expansion and technical transformation of Daluo Power were completed and the installed capacity was expanded to 3,731.7 million kWh, Daluo Electric to 5.4216 milliards of kWh