This hydroelectric power station is not classified at the national level.
The Pankou hydroelectric power station has not been classified as a national hydroelectric power station, so there is no relevant information on the entire network. However, the hydropower station is classified in Hubei Province and ranks sixth. ten major hydroelectric power stations in Hubei. Among them, the first place is the Three Gorges Hydropower Station, the second and third places are the Gezhouba Hydropower Station and the Shuibuya Hydropower Station respectively.
Pankou Hydropower Station is located in Pankou Township, in the upper reaches of the main stem of the Duhe River, 13 kilometers from Zhushan County. The power plant has an installed capacity of 500,000 kilowatts and an annual output. production of 994 million kilowatt hours. The project is a project offirst class on a large scale.
The 500Kv output line is a high voltage transmission line. There are 201 foundations for Shuibuya General Water Pipeline (3 proposed sections), and there are four types of foundations: excavation, rock, flexible slab and cast-in-place pile. Among them, 71.5 are excavation type foundations, 16 are rock foundations, and 47.5 are flexible slab foundations. The 500Kv output line is a high-voltage transmission line, usually made of multi-strand aluminum wire, and the cost of copper wire is too high.