The methods for adjusting the height of the city's hydroelectric power station are:
1. Terrain modification tool. First, level the land over a large area. Use the left and right arrow tools to right-click to extract an example of height leveling.
2. Select everything you want to level and click the third of the three vertical buttons to align it with the height of the floor.
The wireline coverage of the city skyline is 10*10.
Method of laying electricity:
For a city to function, it must first have electricity and water. Let's first explain the installation of electricity. There are two types of facilities that can produce electricity in games: green power generation and resource-intensive power generation. At the start of the game, the electrical installations that can be usedThey are limited and you can only build wind turbines and coal-fired power plants. I personally recommend that you try not to use green energy production facilities.
The reason is that green energy production is not very stable and will be affected by weather conditions, and the CP value is too low. The maximum power of five wind turbines is equal to that of a coal-fired power plant. In terms of construction costs, wind turbines are difficult to compare to coal-fired power plants.
Although in the long term the maintenance costs of green power generation will be much lower, at a later stage these preliminary power generation facilities will be eliminated. Simply building three or four nuclear power plants can meet the needs. demand for approximately 10W of population used.
Regarding electrical connections,When you build a coal-fired power plant, a blue beach will appear. Everything within this blue range will have power supply, and all buildings will have some range of blue range. Therefore, the power tower connection only needs to be connected to the blue range, and there is no need to go deep there. .
On the one hand, all grilles can be used in the building, and on the other hand, it will be more convenient to dismantle them later. And when cities grow, unnecessary power towers can be demolished. Removing some unnecessary pylons can still allow electricity to be transmitted everywhere, even if some of the pylons are removed.
Therefore, the benchmark for power transmission is that as long as the blue range power grid is connected, unless the distance between the two blue power grids is toolarge, a power tower will be required to connect.
Method of laying water pipes and cables:
Cables are very troublesome to install. You have to connect them at the beginning and wait until all your city works are completed. the zones are connected. After receiving power, i.e. once the blue zones are connected, excess cables can be removed to ensure that the power plant and the urban zone are connected. For example, if the power plant is connected to the urban area. , there is no need to erect cables. Additionally, once cable construction is complete, a new road can be built below, provided it does not cross the base. Cables and water pipes need to be routed all the way around, they just need to stay in contact.
In case of partial water shortage, check if there are still some parts that are not copen. If there is a complete lack of water, check if the water pump is powered and if the water lines are actually powered. connected.
Because power plants produce noise and pollution, separate them from residential areas. Under normal circumstances, you need to pull the cable, but this will affect the appearance. But as long as there are buildings in the planned area, it will be automatically electrified, that is, once the highway is planned, a residential area will be built in A, an industrial area will be built in B and a commercial area will be built. be built in the area between A and B. This will provide all the electrical power. Note that due to the demand at the beginning, if you plan too many zones, you will not be able to construct buildings in time, so you must plan zones selectively.