What details should be paid attention to when constructing water-filled sand to achieve good results

Introduction What details should be paid attention to when constructing water-filled sand to achieve good results? Water-in-water and water-in-sand construction technology: 1. Environmental protection 1. Check the soil that needs to be protected before construction

What details should be paid attention to when constructing water-filled sand to achieve good results

Water-in-water and water-in-sand construction technology:

1. Environmental protection

1. Check the areas that need to be protected before construction.

2. Make building arrangements and cover window sills, door edges, trees and certain areas on the ground that may be contaminated with plastic film.

2. Base coat inspection and treatment

1. Carefully inspect the base wall surface for cracks and pits. Eradicate hollow, half-fallen and loose base surfaces.

2. The old wall surface should be cleaned to remove the old coating, floating dust, etc.

3. Use wire brushes, sandpaper, etc. to remove floating dust, grease and other powdered accessories.

4. If there is a lot of dust floating on the wall, use a high-pressure water gun to wash theexterior wall surface.

5. Fill cracks, dips and depressions with exterior wall putty and maintain for 5-7 days.

6. If the construction is based on a finished thermal insulation board, the surface of the board must be smooth and free from burrs, it must be polished with sandpaper.

3. Scrape the putty 1. Use flexible leveling putty to scrape the treated base surface 1-2 times. The putty should not be too thick each time to make the wall smooth.

2. Please apply a full batch of interface agent to ceramic tiles and mosaic walls first, then use a full batch of tile renovation sealant before leveling.

3. Polish the putty surface with water to remove floating dust and burrs on the surface.

4. After the construction of the putty is completed, it should be cured for 15-20 days (23±2℃)to ensure that the moisture content of the base coat is <10% and the PH value is <10.

5. Scrape the glossy flexible tape 2-3 times, with an interval of 12h (23±2℃) between each application, and dry for 24h (23±2℃) when finished.

6. Use fine water to buff the surface to make it smooth and smooth, providing a good base surface for building the paint.

4. Apply primer

1. Use a wool roller or spray gun to evenly apply the special sealing emulsion 1-2 times.

2. Once the primer is completely dry (6h/23±2℃), you can move on to the next process.

5. Spray colored imitation granite paint water in water in sand

1. Use a special spray gun to evenly spray the colored paint 1-2 times. (The diameter of the water in the water is generally about 3.0, and the diameter of the eau in sand is 3.5 to 4.0)

2. Each build interval is 12 hours (23±2℃).

3. After the colored paint is sprayed, dry it for 24 hours/23±2℃.

6. Spray the top coat

1. Use a spray gun to evenly apply the top coat 1-2 times.

2. The interval between each pass is 4-6h/23±2℃.

7. Coating maintenance

The coating will be completely filmed and cured for 7 days/23 ± 2°C. During this period, no human harm will occur.

8. Cleaning after building colored paint

1. One day after the process is completed, remove the protective film from the affected parts.

2. Cleaning, clean the affected parts and the floor.

9. Precautions for painting construction

1. Do not stir colored paints vigorously.

2. Do not mix other substances.

3. Do not add water tor dilute.

4. Try to use the paint immediately after opening the can.

Is there a difference between water-in-water and water-in-sand construction procedures?

Tianjin wall water sand is a common construction method, which has the advantages of sound insulation, heat insulation, fire prevention and resistance to humidity. Here is the construction method with water-coated sand on the walls of Tianjin:

1. Clean the wall first to make sure there is no debris or oil stains on the surface.

2. Then apply a layer of cement mortar to ensure that the wall surface is completely wet and even.

3. After applying the cement mortar, immediately pour the pre-measured cement mortar onto the wall.

4. Use professional tools to gradually compact and pound the cement mortar untiluntil all pores in the wall are filled.

5. Before the cement mortar is completely dry, use fine sandpaper or abrasive tools to polish the wall until the surface becomes smooth and flat, and remove the sand floating on the surface.

6. Finally, apply a coat of latex paint or varnish to protect and beautify the wall.

In short, water-coated sand wall construction in Tianjin requires high professional skills and experience. During the construction process, the corresponding specifications and safe operation requirements must be strictly adhered to to ensure construction quality and personnel safety. .

What should we pay attention to when spraying water-filled sand in hot weather?

There is not much difference in the construction process between the two.

1. Protect the environment arounde the construction zone.

Inspection and treatment of the base layer

1. Carefully inspect the base wall surface for cracks and pits. Eradicate hollow, half-fallen and loose base surfaces.

2. The old wall surface should be cleaned to remove the old coating, floating dust, etc.

3. Use wire brushes, sandpaper, etc. to remove floating dust, grease and other powdered accessories.

4. If there is a lot of dust floating on the wall, use a high-pressure water gun to wash the exterior wall surface.

5. Fill cracks, dips and depressions with exterior wall putty and maintain for 5-7 days.

6. If the construction is based on a finished thermal insulation board, the surface of the board must be smooth and free from burrs, it must be polished with sandpaper.

Pasticscrape

1. Use a flexible leveling putty to scrape the treated base surface 1-2 times. Each layer of putty should not be too thick and the wall should be smooth. . Aim.

2. Please apply a full batch of interface agent to ceramic tiles and mosaic walls first, then use a full batch of tile renovation sealant before leveling.

3. Polish the putty surface with water to remove floating dust and burrs on the surface.

4. After the construction of the putty is completed, it should be cured for 15-20 days (23±2℃) to ensure that the moisture content of the base coat is <10% and the PH value is <10.

5. Scrape the flexible glossy adhesive tape 2.-3 times, each application interval is 12h (23±2℃) and dried for 24h (23±2℃) when finished.

6. Use fine water to polish the surface to make it smoothand smooth, thus providing a good base surface for building the paint.

Apply primer

1. Use a wool roller or spray gun to evenly apply the special sealing emulsion 1-2 times.

2. Once the primer is completely dry (6h/23±2℃), you can move on to the next process.

Spray colored imitation granite paint water in water in sand

1. Use a special spray gun to evenly spray the colored paint 1-2 times. (The diameter of water in water is generally about 3.0, and the diameter of water in sand is 3.5 to 4.0)

2. Each build interval is 12 hours (23 ± 2°C).

3. After the colored paint is sprayed, dry it for 24 hours/23±2℃.

Spray the top coat

1. Use a spray gun to evenly apply the top coat 1-2 times.

2. The interval betweeneach pass is 4-6h/23±2℃.

Paint maintenance

The complete film formation and curing period of the coating is 7 days/23 ± 2°C. During this period, no human harm or other conditions should occur.

1. Environmental protection?

1. Check the areas that need to be protected before construction.

2. Make building arrangements and cover window sills, door edges, trees and certain areas on the ground that may be contaminated with plastic film.

2. Base coat inspection and treatment

1. Carefully inspect the base wall surface for cracks and pits. Eradicate hollow, half-fallen and loose base surfaces.

2. The old wall surface should be cleaned to remove the old coating, floating dust, etc.

3. Use wire brushes, sandpaper, etc. for eliminate floating dust, grease and other powdered accessories.

4. If there is a lot of dust floating on the wall, use a high-pressure water gun to wash the exterior wall surface.

5. Fill cracks, dips and depressions with exterior wall putty and maintain for 5-7 days.

6. If the construction is based on a finished thermal insulation board, the surface of the board must be smooth and free from burrs, it must be polished with sandpaper.

3. Scrape the putty

1. Use flexible leveling putty to scrape the treated base surface 1-2 times. The putty should not be too thick each time to make the wall smooth.

2. Please apply a full batch of interface agent to ceramic tiles and mosaic walls first, then use a full batch of tile renovation sealant before leveling.

3. Polish the surface of the mpolish with water to remove floating dust and burrs on the surface.

4. After the construction of the putty is completed, it should be cured for 15-20 days (23±2℃) to ensure that the moisture content of the base coat is <10% and the PH value is <10.

5. Scrape the smooth and flexible adhesive 2-3 times, with an interval of 12 hours (23±2℃) between each application, and dry for 24 hours (23±2℃) when finished.

6. Use fine water to buff the surface to make it smooth and smooth, providing a good base surface for building the paint.

4. Apply primer?

1. Use a wool roller or spray gun to evenly apply the special sealing emulsion 1-2 times.

2. Once the primer is completely dry (6h/23±2℃), you can move on to the next process.

5. Spray water-colored imitation granite paint inwater?

1. Use a special spray gun to evenly spray 1-2 colored paint. times. (The diameter of water in water is generally about 3.0, and the diameter of water in sand is 3.5 to 4.0)

2. Each build interval is 12 hours (23 ± 2°C).

3. After the colored paint is sprayed, dry it for 24 hours/23±2℃.

6. Spray the top coat

1. Use a spray gun to evenly apply the top coat 1-2 times.

2. The interval between each pass is 4-6h/23±2℃.

7. Paint maintenance?

The complete film formation and curing period of the coating is 7 days/23 ± 2°C. During this period, no human harm should occur.

8. Cleaning after building colored paint?

1. One day after the process is completed, remove the protective film from the affected parts.

2. Clean themrooms and floors concerned.

9. Precautions for painting construction

1. Do not stir colored paints vigorously.

2. Do not mix other substances.

3. Do not add water to dilute.

4. Try to use the paint immediately after opening the can.

  • Popular Focus
  • Where is the cheapest battery wholesale?

    Where is the cheapest battery wholesale in Tangxia, Sanyuanli, Baiyun District? There is an enterprise specializing in the independent production of electric vehicles in Tangxia, Sanyuanli, Baiyun District, Baiyun Sanyuanli Avenue, Baiyun Sanyuanli Street
    08-02
  • Four 3.7V lithium batteries in series and parallel produce 7.4V/4.4A. How to reduce it to 4.8V/4.4A?

    Four 3.7V lithium batteries in series and parallel produce 7.4V/4.4A. I personally think it is impossible to reduce it to 4.8V/4.4A. Because the discharge platform of lithium batteries is generally set
    08-10
  • What are the materials of the negative electrodes of lithium batteries?

    What are the materials of the negative electrodes of lithium batteries? The main commercial applications of lithium batteries include graphite, which is a sheet of copper used to guide current and which does not react. another safe
    08-02
  • The difference between 18500 and 26500 batteries

    What is the difference between 18500 and 26500 batteries? The answer above is 18650. The person asking the question should ask what is the difference between 18505 and 26500 batteries. In the case of Fuant ER1
    08-02
  • What does 3.7V 80mAh written on a lithium battery mean?

    What does 3.7V 80mAh written on a lithium battery mean? 3.7 V, 80 mA = 0.08 A, H means 1 hour, or 3600 seconds. Taken together, it is
    08-02
  • How long does a lithium battery (cell phone battery) last?

    How long does a lithium battery (cell phone battery) last? The lifespan of mobile phone batteries, under normal conditions of use and without serious impact, the lifespan set by the manufacturer must be 5 years.
    08-02
  • Will lithium batteries explode when charging?

    Will lithium batteries explode when charged? Will lithium batteries explode when charged? Lithium battery explosions usually occur during the charging process, because the negative electrode material of lithium batteries is graphite or other carbon materi
    08-02
  • Parameters of lgdas31865 lithium battery

    Parameters of lgdas31865 lithium battery The parameters of lgdas31865 lithium battery are as follows: LGDAS31865 is a model 18650 lithium battery with a capacity of
    08-02
  • What are the main components of lithium battery electrolyte?

    What are the main components of lithium battery electrolyte? The composition of lithium battery electrolyte is shown below. 1. Ethylene carbonate: molecular formula C3H4O3. Colorless transparent liquid (>35℃), room temperature
    08-02
  • Who are the lithium battery manufacturers in Shandong?

    What are the lithium battery manufacturers in Shandong? Shandong Shengyang Power Supply Co., Ltd. and Shandong Weineng Environmental Protection Power Technology Co., Ltd. 1. Shandong Shengyang Power Supply Co., Ltd. is located in Shengyang, Qufu City.
    08-02
  • Types of drone batteries available in 2024

    Part 1. Types of drone batteries available in 2024In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in
    07-30
  • How long does it take to charge 26650 battery?

    How long does it take to charge a 26650 battery? The charging time for a 26650 battery is generally between 3 and 6 hours, but the precise time depends on the power of the charger and the capacity of the battery. in general
    08-02
  • For what?Sure, here's an article based on the phrase "For what?

    The simple yet profound question, "For what?" often serves as a gateway to deeper reflections on purpose and intention. It is a query that invites us to delve into the reasons behind actions, decisions, and circumstances that shape our lives and the wor
    08-02
  • Choosing the Right Cart Battery

    This comprehensive guide will walk you through everything you need about cart batteries, from understanding different types to making an informed purchase decision.
    08-02
  • 30mAh~500mAh 3.7 V Li-ion Battery

    Welcome to Ufine's collection of 3.7V lithium-ion batteries ranging from 30mAh to 500mAh. Explore a diverse range of compact and lightweight batteries suitable for various electronic devices,
    08-02
  • Here are 10 essential facts about drone batteries for 2024.

    10 Key Facts About Drone Battery for 2024 In 2024, drone batteries have advanced significantly, offering a range of options to cater to various needs in the consumer, commercial, and industrial sectors. Below are the primary types of drone batteries avai
    08-02
  • Could you please explain the difference among IMR, ICR, INR, and IFR 18650 batteries?

    What is the Difference Between IMR, ICR, INR, and IFR 18650 Battery?In 18650 batteries, discerning the differences among IMR, ICR, INR, and IFR types is fundamental for tailored and efficient battery usage. These distinct
    08-02
  • Safety considerations for cart batteries

    Selecting the ideal cart battery is crucial for ensuring optimal performance and longevity of your electric vehicle or vaping device. This comprehensive guide w
    08-01