The Letan Hydropower Station Project (original name: Hongshui Badan River Hydropower Station Expansion Project) is the eighth cascade power plant among the ten planned cascade developments in the River Basin. Hongshui River. The dam site is located in Hongdu Town, Xincheng. Guangxi County, 3.0 km upstream, the upstream and downstream of the dam site are connected with the waste water of the already built Bailongtan hydropower station and the normal water storage level of the Bailongtan hydropower station. Qiaogong who successfully passed the feasibility study examination. Provincial Road 20231 from Xinbin to Oudong passes 3.0 km downstream from the dam site, on the right bank there is a traffic road used for the operation of the former power plant of the Letan Phase I project which connects to provincial road 20231. left bank, there is also a single road connecting the road provinciale 20231. The dam site is 137 km from Liuzhou, 15 km from Xincheng, 192 km from Nanning and 127 km from Litang. External transportation is very convenient.
Geographical transportation of the Ertan hydroelectric power station
Introduction Geography and Transportation of Ertan Hydropower Station Letan Hydropower Station Project (original name: Hongshui River Ertan Hydropower Station Expansion Project) is the eighth cascade power station among the ten cascade developments planned in the Hong