1. Compensation standards (for reference only) 1. Houses: (1) Rock foundations, masonry walls, prefabricated floors or cast-in-place flat roofs: 650-850 yuan/m2 (2) Rock foundations, masonry walls , wooden structure tile roof: 500-650 yuan/m2 (3) Rock foundation, masonry wall, cement board slope tile roof: 450-600 yuan/m2 (4) Brick wall, bungalow with wooden purlins: 600-700 yuan/m2 (5) Earth brick wall and bungalow with wooden purlins: 300-450 yuan/m2 (6) Factory building with brick-concrete structure: 600-750 yuan/ m2 (7) Steel structure factory building: 500-650 yuan/m2 (8) Consultancy house: 100-200 yuan/m2 (9) Transformer room: 400 yuan/m2 (10) Cable duct room machines: 300 yuan/m2 (11) Independent door with ceramic tile wall: 600-800 yuan/m2 (12) With Single gate: RMB 100-180/m2 (13) Open shed: RMB 60-100/m2 2 . Fence: (1) Brick wall with p-basestone and height above 2.5 m: RMB 160-260/m (2) Rock-base Brick wall with a base 2-2.5 m high: 130-200 yuan/m (3) Brick wall with a stone base 1.5-2 m high: 100-160 yuan/m (4) Iron fence wall with a stone base: 80-120 yuan/m (5) Simple fence: 50-80 yuan/m (6) Color steel plate wall: 20 yuan/m (7) Steel mesh wall: 10-20 yuan/m (8) Welcome wall (brick-concrete porcelain tile structure ): 300-500 yuan/m2 (9) Front door wall (single brick structure): 100-160 yuan/m2 3. Livestock and poultry buildings: (1) Brick-concrete structure: 200 -280 yuan/m2 (2) Steel-concrete structure: 180-260 yuan/m2 (3) Simple structure: 80-100 yuan/m2 4. Moving the grave: (1) Coffin, bones, urn: 1,200 yuan /seat 5. Greenhouse: (1) Steel frame, concrete and glass roof: 120-240 yuan/m2 (2) Steel frame, concrete and plastic roof: 80-120 yuan/m2 (3) Steel, frame in bois and plastic roof: 40-100 yuan/m2 (4) Winter heat Type, plastic film shed: 60-80 yuan/m2 (5) Bamboo frame shed with a width of more than 3 m and a height greater than 1.5 m: 20-40 yuan/m2 (6) Bamboo frame shed with width less than 3 m and height less than 1.5 m: 10-30 yuan/m2 (7) Single arch shed : 10 yuan/m2 (8) Automatic roller shutter machine: 300 yuan/piece 6. Small bridge: (1) Rectangular reinforced concrete slab bridge: 1,400-2,000 yuan/m2 (2) Flat stone arch bridge : 800-1200 yuan/m2 (3) Flat brick arch bridge: 500-800 yuan/m2 (4) Stone arch bridge: 1600-1800 yuan/m2 (5) Brick arch bridge: 1000-1200 yuan/m2 (6) Single bridge: 400 yuan/m2 7. Culvert: (1) Stone culvert span 1-2 m: 600-1000 yuan/m (2) Stone culvert span 1-2 m: 600-1000 yuan/m stone 2 m or more: 1,000-1,200 yuan/m (3) Stone arch culvert span diameter 1-4 m: 1,800-2,600 yuan/m (4) Culvertstone arch culvert with a span of 4 m or more: 2,600-3,000 yuan/m (5) Reinforced concrete round tube culvert with a span of 1-2 m: 1,500-2,000 yuan/m (6) Steel bars Concrete round culvert with a span of more than 2 m: 2,200 yuan/m (7) Reinforced concrete cover culvert with a span of 1.5 to 4 m: 1,500 to 1 800 yuan/m (8) Reinforced concrete culvert cover with a span greater than 4 m: 2,000 yuan/m 8. Drainage and swimming pool: (1) Brick and stone drain: 50-70 yuan/m (2) U-shaped ditch: 60-80 yuan/m (3) Brick and stone swimming pool: 100-150 yuan/m3 (4) PVC pipe (irrigation): 15-20 yuan/m 9. Water well : (1) Pressurized water well: 300 yuan/eye (2) Brick well and rock well with a depth of 5 to 10 m and a diameter of 1.5 m: 3,000 to 3,600 yuan/eye (3) Brick wells and rubble wells with a depth of 5 to 10 m and a diameter of 1.5 to 2.5 m: 3,600 to 5,000 yuan/eye (4) Motorized well from a depth of 20 to 50 m: 160 to 220 yuan/m (5) Motorized wells with a depth of 12 and 50 to 100 m: 220 to 280 yuan/m (6) Motorized well depth of 100 to 250 m: 280-360 yuan/m (7) Depth motorized well of 250 m or more (depth greater than 250 m): 360-500 yuan/m (8) Steel tube well: 240-260 yuan/m (9) Sand tube well (diameter 20 cm ) (depth 100 KVA): 1000 yuan/10KVA 16. Floor and sidewalk: (1) Cement floor (depending on thickness): 30-50 yuan/m2 (2) Brick floor (differentiated) Thickness): 20- 40 yuan/m2 (3) Cement pavement (depending on thickness): 60-100 yuan/m2 (4) Asphalt pavement (depending on thickness): 100-160 yuan/m2 17. Water pipe: ( 1) From main pipe to indoor faucet: 500 yuan/table (2) Main pipe: 25-30 yuan/m 18. Sewage drainage ditch pipe: (1) Brick covering span less than 0.5 m : 20-30 yuan/m (2) Brick coverage span 0.5-1 m: 30-40 yuan/m (3) Brick coverage span 1-2 m: 40-80 yuan/m (4) Brick coverage span 2 m or more: 80 -160 yuan/m (5) Septic tank: 60-80 yuan/m3 (6) Biogas tank: 1,000 yuan/m3 (7) Diameter of drainage pipe plastic drainage pipe less than 20cm: 20-30 yuan/m (8) Plastic drainage pipe Diameter 20cm or more: 40-60 yuan/m (9) Cast iron drainage pipe diameter less than 20cm: 45-65 yuan/m (10) Straight cast iron drainage pipe Diameter greater than 20 cm: 100-150 yuan/m (11) Cement pipe less than 60 cm: 50 yuan/m (12) Cement pipe greater than 60 cm: 80 yuan/m 19. Bathrooms and toilets: (1) Dry toilet conversion: 1,200 yuan/m2 (2) Brick-concrete structure bathroom: 200-260 yuan/m2 (3) Simple toilet with roof: 80-120 yuan/m2 (4) Open-air toilet: 200 yuan/piece 20. Solar power: (1) Simple solar power: 100 yuan/set (2) Vacuum tube solar power: 300 yuan/set 21. Photovoltaic energy production: (1) Photovoltaic energy productionltaic: 2 yuan/watt 22. Green crops: (1) Food crops: 1,200 yuan/mu (2) Economic crops: 2,000 to 3,000 yuan/mu (3) Vegetable, melon and fruit crops: 2 000 to 4,000 yuan/mu Note: Economic development levels vary by region, and project-specific compensation documents can be found on the official website of the local natural resources bureau. 2. Additional notes 1. If it concerns the demolition of residential buildings, industrial and mining enterprises and other construction facilities over large areas, the city, county (urban) government (urban) government management) will formulate a separate demolition compensation plan. 2. Ground fixings not listed in the table will be compensated with reference to similar compensation standards in the table, if reference cannot be made or there is a dispute over the specific compensation standard it will be determinedborn by the price certification agency based on the facts. 3. No compensation will be given for hasty plantings, hasty plantings and hasty construction of buildings and structures after the local government plans to acquire land after the announcement is published. 4. The above types of projects involving government investment and construction are not within the scope of compensation. 5. Whether there are other provisions on compensation standards for land seizures and seedlings for land acquisition for large infrastructure projects such as railways, highways, airports , waterways and ports, water conservation projects and energy projects determined by the state and province. , these provisions prevail. The pricing standards for offsets and subsidies are different in each range. The price ofUsed land is relatively higher than that of unused land. The compensation fees for attachments and young crops are stipulated by different localities after careful consideration and adjustment. You can check the details for yourself. The attachment compensation prices listed above are for reference only, and those not listed may require certification by certification agencies.
How to calculate the standard attachments for compensation for land acquisition in Liaocheng City, S
Introduction How to calculate the standard attachments for compensation for land acquisition in Liaocheng City, Shandong Province? 1. Compensation Standards (for reference only) 1. Houses: (1) Stone foundations, masonry walls, precast floors or cast-in-place flat roof