Danjiangkou Hydropower Station is located in the urban area of Danjiangkou City, Hubei Province. It is located in the middle of the Han River, the largest tributary of the Yangtze River, which is 3,000 miles away. The power plant is designed to have 6 installed units with a total capacity of 900,000 kilowatts. The first unit was put into operation in 1968, and the six units were completed and put into operation in 1973. On December 25, 2013, the South-North Water Diversion Office of the State Council announced that after 10 years of construction, the main body of the first phase of the middle road of the South-North Water Diversion Project was completed. today, and the main water transmission line was fully connected. The first phase of the middle road of the South-North Water Diversion Project, construction of which began in 2003, diverts water from Danjiangkou Reservoir, extends northwardalong the west side of the Beijing-Guangzhou railway and transport it to Beijing and Tianjin through Henan and Hebei. The total length of the main water transmission line is 1,432 kilometers, and the total project investment is 201.3 billion yuan. After the water network was officially opened in October 2014, the annual water transfer volume reached 9.5 billion cubic meters, which can provide domestic water, industrial water and commercial water. agricultural water to 119 large and medium-sized cities and counties along the route.
80 points required: Danjiangkou Hydropower Station processing situation and future development, etc. I am a new graduate in the electrical field Thank you!
Bus route: No. 605, the total route is about 55.8 kilometers
1 Walk about 150 meters from Xiangzhou Terminal to Xiangzhou Terminal< /p>
2. Take route 605, cross 63 stations andarrive at Nanshui Market Station
3 Walk about 240 meters to Zhuhai Power Station Expert Village
How is it. the advantages of the Danjiangkou hydroelectric power station?
I come from Danjiangkou.
They are very profitable. They produce electricity in many places. Half of Danjiangkou's urban area belongs to power plants.
There will be a diversion of water from the south to the north in the future. The Danjiang River is now awaiting the relocation of immigrants from the reservoir area. Once completed, the water will be immediately transferred to Beijing. said it wouldn't be until 2013. The power plant was even richer at that time.
I am also studying abroad and would like to return to my hometown in the future.
My Q 616024725 If you have any questions, ask me!
The Danjiangkou hydroelectric power station belongs toHanjiang Group Company. The Hanjiang Group Company was originally the administration office of the Danjiangkou Water Center of the Ministry of Water Resources. It is a 100% state-owned company. Its superior is the Yangtze River Water Conservancy Commission (sub-ministerial level). more than 9,000 employees. In 2008, the annual per capita income was nearly 40,000 yuan (including five insurances and a housing fund). The revenue of Danjiangkou Hydropower Station is at a relatively high level in the Hanjiang Group Company. The annual bonus of more than 100,000 yuan per person mentioned above is too exaggerated. The annual salary of the factory manager with the annual salary system is just over 200,000 yuan.