To apply for qualifications, you must prepare all information in advance. Water conservation and hydropower engineering qualifications require a lot of information, typically the following:
1. > (1) Copy of the commercial license of the business legal entity;
(2) Statutes;
(3) Working documents and identity certificate of the person morals of the company;
(4) The company manager and the technical and financial managers The certificate of identity of the person, the certificate of professional title and the project performance certification documents of the technical manager required by the relevant qualification standards at the working document level;
(5) If there are requirements for equipment, workshops, etc., purchase invoices equipment or equipment purchase invoices or rental agreement and other information required by standardsrelevant qualification documents;
(6) Relevant rules and regulations of the company;
(7) Certificate of ownership for company offices and invoices for equipment belonging to the company.
2. Basic documents for personnel
(1) Registration certificate and identity certificate of registered personnel of the company;
(2) Non-registration of companies required by qualification standards Professional title certificates, identity certificates and pension insurance certificates of professional and technical personnel;
(3) Professionals with special requirements in the standards must also provide the corresponding certificates and professional certification documents.
To produce bottled water, you must apply for a business license, a water catchment license and a production license for the food industry. Depending on local requirements andproduction environment, it is necessary to apply for health license, environmental protection approval, fire protection license and other licenses.
Registration of Establishment of a Limited Liability Company
Basis of processing: “Corporate Law of the People’s Republic of China”; “Regulations of the People's Republic of China on Company Administration; Registration" of the Council of State.
Declaration conditions:
1. The quorum is reached.
2 There is an amount of capital subscribed by all the shareholders which is in accordance with the articles of association of the company;
3. The shareholders jointly formulate the articles of association of the company;
4. an organizational structure that meets the requirements of a limited liability company;< /p>
5. Have a business domicile
Application documents:
1. . “Formulaire application for business registration (filing)".
2. "Power of attorney from the designated representative or jointly authorized agent" and a copy of the identity document of the designated representative or the authorized agent.
3. Articles of association signed by all shareholders
4.
If the shareholder is a company, submit a copy of the business license
If the shareholder is a legal entity, a copy of the registration certificate of the company. legal entity must be presented
If the shareholder is a legal entity, a copy of the registration certificate of the legal entity must be presented
If the shareholder is a legal entity. private non-corporate unit, a copy of the certificate of the private non-corporate unit must be submitted
If the shareholder is an individual, a copy of his or her identity document must be submitted.
Other shareholders must submit qualification certificates stipulated in relevant laws and regulations.
5. Directors, supervisors and managersAppointment documents (resolutions of general meetings are signed by shareholders, resolutions of the board of directors are signed by directors of the company) and copies of identity documents.
6. Documents for the appointment of the legal representative (resolutions of the general meeting will be signed by the shareholders and resolutions of the board of directors will be signed by the directors of the company) and copies of identity documents.
7. Use of proof of residence.
8. "Notice of Preliminary Approval of Company Name".
9. If laws, administrative regulations and decisions of the State Council stipulate that the establishment of a limited liability company must be subject to approval, a copy of theCorresponding approval or license document must be submitted.
10. The business scope of the enterprise applying for registration includes the items that must be submitted for approval before registration in accordance with laws, administrative regulations and decisions of the State Council, and copies of approval documents or relevant licenses must be submitted.
Instructions for completing the documents:
1. This specification applies to limited liability companies established in accordance with the “Companies Law” and the “Company Registration Management Regulations”. Single-member limited liability companies and wholly state-owned companies must provide relevant documents referring to these specifications.
2. Submitted documents and certificates, with the exception of marked copies (copies must be signed by the applicant with the words "in accordance with the goldoriginals” and the name of the applicant must be left), must be submitted in original.
Processing time: Legal time limit: 15 days; Commitment period: 5 days.
Procedure: Submit application documents → Review → Acceptance → Decision → Obtain license.
Basis of billing and standards: None.
Documents to be submitted when applying for a food production license
1. A copy of valid commercial and industrial license or 3 copies of company name pre-approval issued by. industrial and commercial service;
2. 3 copies of the certificate of use of the food production and processing site
3. 3 copies of the identity card of the person responsible; of the company
4. Business authorization 3 copies of certificate
5. 3 copies of the trustee’s identity card
6. the food production license application form.
7. 3 copies of the site layoutproduction of the company
8. 3 copies of the company's production process flowchart with key equipment and parameters
9; . 1 copy of the company's quality management documents;
10. 3 copies of the company's standard texts (implementing the company's standards);
The company's products comply with national standards and existing industry standards or local standards. standards, product name, type, properties and other attributes shall strictly conform to the content stipulated in the corresponding national standards, industrial standards or local standards. Otherwise, it will be considered that the product does not meet national standards, industrial standards or local standards. According to Article 25 of the Food Safety Law, enterprise standards must be formulated and filed with the provincial food administration department.health or issued in writing by the ministry. Provincial Department of Health Administration. Certification proves that the product can be applied to an existing national standard, industry standard or local standard.
11. Obtaining HACCP certification, food hygiene for exportCompanies that have issued a registration certificate (registration) must provide 3 copies of the certificate
12. door, all original panoramic color photos or color prints (5 inches or more) of auxiliary materials warehouse, production line, finished product warehouse and laboratory. Two sets of photos. Photos are taken on site by the review team;
14. Other materials required by the examination rules.
Application for water catchment license
Basis of implementation
1 “Water Act”
Article 48 directly from rivers, units and individuals. who draw rWater sources from lakes or underground must apply for a water drawing license from the administrative water department or river basin management agency in accordance with the national water drawing permit system and the system of paid use of water resources, and pay the water resource fee. to obtain the right to draw water. However, small amounts of water are excluded for family life and for the consumption of livestock and poultry dispersed in the wild and in captivity.
2. “Regulations on the Administration of Water Licenses and Collection of Fees on Water Resources” (Order of the State Council No. 460)
Units and individuals who use water resources in paragraph 2 of the article. 2, with the exception of this Except in the circumstances specified in section 4 of the Regulations, every person must apply for a water abstraction permit and pay royalties on water resources.
3. "Water intake management measures of Fujian Province" (adopted at the 18th meeting of the Standing Committee of the Eighth People's Congress of Fujian Province in 1995)
Article 3 Intake units water or Individuals, except in the circumstances specified in Articles 4 and 5 of these measures, a water catchment permit must be requested from the administrative water service.
Conditions of application
1. Acceptable objects: 1. Water consuming units and individuals that draw more than 200,000 m3 of surface water per day; draw groundwater daily. Water samples with a volume of water sampled greater than 10,000 m3. 3. Water withdrawals in administrative areas of districts and cities or in river basins affect water withdrawals of other districts and cities. 4. Reservoirs and hydroelectric power stations; the technical storage capacity is greater than 100 million m3; 5. Capacitytotal installed capacity of electricity production companies and institutions is greater than 250 MW.
2. Applying for a Water Catchment License: If an organization or individual plans to use water abstraction projects or facilities to directly draw water resources from rivers, lakes or underground, and the project construction company successfully demonstrates water resources, it can apply for a water catchment permit.
Construction projects subject to the government approval system: submit a water catchment application before submitting the (pre)feasibility study report of the construction project;
p>Construction projects included in the government-approved project catalog: Before submitting the project application report, submit a water catchment application;
Construction projects included in the project catalog government registered and other construction projects not includedin the National Capital Construction Management Procedures: Submit a water catchment application before the water catchment project begins.
Once the water abstraction application is approved by the approving authority, the applicant may begin construction of water abstraction projects or facilities.
3. Application for Water Intake Permit: Once the water intake project or installation is completed and put into trial operation for 30 days, you can apply for a water intake permit.
Application documents
1. Basic documents for the construction project (one copy);
2. Water catchment permit application report (one original copy);
3. Water Catchment Projects or Facilities Acceptance Application Report (one original
4. Water Catchment Permit Application Approval Document (one original)
5 . Construction and test operation of water catchment projects or installations (original); a copy);
6. Certification status of water metering facility measurements (one copy)
7. Construction and test operation of water-saving installations (one original copy);< /p>
8. Implementation of wastewater treatment measures (one original copy);
9. During the test operation, the water quality analysis report for sampling and water sampling issued by the unit with qualifications (one copy);
10. Water storage projects such as dams and dams must also submit a water storage dispatch operation plan (an original copy);
11. Catchment projects must also be submitted. The complete well pumping test results table and water quality analysis report (one copy) must be submitted.
Treatment process
1. Acceptance of water intake projects: Once the project orthe water intake installation is completed and has been in trial operation for 30 days, the person responsible for the water intake must submit an application. to the Department of Water Resources for acceptance of the water intake project with the relevant documents and materials.
2. Application for Water Catchment Permit: Once the water catchment project or facility has passed the acceptance inspection, the applicant must submit an application to the Department of Water Resources with the report of application for a water catchment permit and associated documents. upon acceptance of completion of the project or water catchment installation.
3. Issuance of permit: The water catchment permit will be issued within 7 working days from the date of acceptance of the application.
4. Submission of results: The applicant must go to the Administrative Service Center of the Department of Water Resources to obtain a water permit, or theThe administrative services of the Department of Water Resources will send the certificate to the applicant.
Deadline: 7 working days
Invoicing standard: No charge