Heat New Energy Co., Ltd. is a joint stock company registered in Shandong Province on May 11, 2016. Its registered address is F8-2-201, Innovation Factory, No. 2016 Feiyue Avenue, High-Technology Zone, Jinan City, Shandong Province.
The social credit code/unified registration number of Heat New Energy Co., Ltd. is 91370100MA3CAD345E, the legal entity is Lou Ping and the company is currently in operation.
The business scope of Heat New Energy Co., Ltd. is: new energy technology development, technology promotion, technology consultation, environmental protection projects; import and export of goods; purification equipment, solar equipment, wind energy Wholesale, retail, installation, rental and maintenance services for biomass energy equipment and equipment. (Projects that require approval according to law do notmay carry out commercial activities only after approval from relevant departments).
View more news and information about Heat New Energy Co., Ltd. via Aiqicha.
What should I do if my solar heat pipe is damaged? Nobody takes care of it.
The solar water heater was turned on manually and I forgot to turn it off. The water was coming from the overflow port and the exhaust port. The hole is overflowing.
Since the overflow port is lower than the exhaust port and the other ports of the solar water heater tank are closed, when the water level is higher higher than the overflow port, water will flow out of the overflow port. First of all.
If the upper water flow rate is less than the overflow outlet flow rate, water will still flow through the overflow outlet. If the top water flow is greater than the overflow flow, the water level will continue to rise andwater will flow out of the exhaust hole.
The structure of the solar heat fire is as follows:
Look what kind of tube it is, buy it yourself and plug it in, or you can ask the manufacturer. Someone helped hook it up, but the water heater needs to be repaired or it will be blown away. (The water tank should be fixed to the bracket, and the bracket to the roof. In particular, the bracket should be fixed to the expansion screws on the roof with a metal cable)