Unpacking and preparation
1. Unpacking
· Prepare crowbars and hammers.
· Please use caution when moving equipment, a forklift is recommended.
2. Preparation before installation
· Ensure that the 220V power supply is in place (the power socket must be earthed and the test equipment must be earthed independently
).
· The pressure of the external air pressure source is set to 0.8Mpa.
· Several meters of external 8mm air hose and an air valve switch.
· Ensure that the equipment operates at a constant temperature of 25°C.
· Several standard battery plugs.
· Tools (hexagonal socket, multimeter, screwdriver, etc.).
I have already purchased it once from Wuhan Sanggong Optoelectronic Factory. Their service is pretty good and they have detailed installation instructionss. You can search online to find out more. I hope this helps you.