Just one. In September 2009, Guangxi's first solar power plant officially generated electricity and came into operation in Baise China Resources Hope Town. The total investment of the project is 2 million yuan, with a capacity of 53 kW, an annual power output of about 50,000 kilowatt hours and a design life of 25 years. Over the lifetime, a total of approximately 1.25 million kilowatt hours of electricity. will be generated. The generated electricity is mainly used for some public facilities such as schools, kindergartens and cultural stations in Baise China Resources Hope Town. The rest of the electricity will be sold via the local electricity network in Baise and the profits will be injected into the “Industrial Development Fund”. " of the professional cooperative of local farmers within the framework of the collective economy. The completion and commissioning of this project not only complementsthe history of the absence of solar power generation in Baise and even Guangxi, but also constitute a substantial step towards the exploration of new clean energy construction.
The 20 MW photovoltaic plant is a large-scale project. \x0d\The project covers an area of approximately 50 hectares and costs 200 million. It's a big project. \x0d\\x0d\Photovoltaic power plant refers to a photovoltaic power generation system connected to the power grid and transmitting energy to the power grid. This is a state-sponsored green energy project. It can be divided into grid-connected power generation systems with and without batteries. Solar power generation is divided into photothermal power generation and photovoltaic power generation. Solar power generation generally refers to the production of solar photovoltaic power. \x0d\20MW\x0d\Construction planof the photovoltaic power plant\x0d\The total construction period is only three months. Preparation (site grading, material preparation, temporary construction installations) takes time and several days of concrete maintenance must be set aside. the later phase\x0d\Concrete maintenance The time is actually only more than two months. In order to ensure the construction period, the number of people will be increased or decreased flexibly according to the specific workload and project progress. \x0d\ Organize flow construction and organize the construction of complete buildings and distribution rooms individually during the foundation construction period. Special construction technology: It is recommended to use cast-in-place cylindrical piles as the foundation of the component support and integrate 8 thick 150X150 Q235 steel plates as the welding surface of the supportand the foundation. This can eliminate the occurrence of this phenomenon. construction of supports and foundations in a wide range of errors. \x0d\In terms of construction machinery and tools: Consider installing 2-4 small mobile mixers on site, and working in shifts can ensure material supply needs. Provide 2 small motorized dump trucks and 3 trolleys for each mixer to transport the concrete. If the project requires it, a concrete delivery pump may be considered to meet concrete delivery requirements in complex terrain.