Solar street light fault detection report
Report number: SLD-2021-001< /p>
Date: May 15, 2021
1. Purpose of the inspection
The purpose of this inspection is to evaluate the light degradation of the solar street lights in order to determine if they require maintenance and repair.
2. Detection method
1. Select 10 solar street lights to test, distributed in different locations and directions.
2. Use a light meter to measure the light intensity of each solar street light.
3. The detection time is from 8 p.m. to 10 p.m. to ensure that the street lights have started working.
3. Test results
After measurement and analysis, the following results were obtained:
1. The lighting intensity ofsolar street lights 1 to 5 is 1000. lumens respectively 980 lumens, 950 lumens, 920 lumens and 900 lumens. The light intensity of these floor lamps is within the normal range and does not require any maintenance.
2. The lighting intensities of solar street lights 6 to 10 are 880 lumens, 850 lumens, 820 lumens, 800 lumens and 780 lumens, respectively. The lighting intensity of these street lights is low, the light has deteriorated, and maintenance and repairs are required.
IV. Suggested measures
Considering the phenomenon of light degradation, it is recommended to take the following measures:
1. turns on with strong light decay to restore its normal light intensity.
2. Check the light attenuation of solar street lights regularly, find out and solve problems in time to ensure the normal operation of street lights.
V. Conclusion
According to the results of this testt, some solar street lights have experienced light degradation and require maintenance and repair. It is recommended to take corresponding measures to ensure the normal lighting effect and service life of solar street lights.
VI.Annex
1. Table of measurement data of solar street lighting meters
2. Solar street light maintenance and repair record chart
Above is the report of this solar street light dimming detection. If you have any questions or need more information, please do not hesitate to contact us.
Sincerely,
XXX Testing Center
How to request rural solar street light construction report
There will be procedures specific for the installation of photovoltaic solar panels. The company offers this full range of services. You can download the Carbon Ying Synergy or Guangliang app, qui includes solar PV installation cost calculations and revenue calculations.
Let's talk about how to install a photovoltaic plant.
First, you just need to find a reliable cooperative manufacturer and then submit your purchase request. Then the photovoltaic company will send professional staff to your door. Carry out a professional survey on the roof of your house to see if it meets the standards for installing a photovoltaic plant, such as whether there is roofing around, if the roof of the house is safe and solid, etc. After meeting the requirements, we will design a complete set of photovoltaic power plants according to the size of your power plant installation plan. Once the project design is completed, the photovoltaic plant can be installed.
The photovoltaic power plant system includes photovoltaic panels, inverters, brackets, boxesconnected to the grid, photovoltaic module cables and other components.
Once the installation of the photovoltaic plant is completed, it is generally necessary to request a connection to the network. This can be managed directly by the photovoltaic manufacturer for the user. Once the photovoltaic plant is connected to the network. network, the excess electricity produced by the plant can be integrated into the network and sold. Earning money every month can be considered very profitable.
How to build a solar power plant
1. First briefly describe the form and meaning
2. Then present the implemented solutions provided; by each manufacturer. Product location and plan quote;
3. Analysis of benefits, economic aspects, social aspects,
4. Practical importance for rural areas, convenient lighting, avoidance of electricity bill collection. , etc. etc. ;
5. Finally, highlight the foresight, mission responsibility and social importance of the approval department, wear a top hat!
1. To build a solar power plant, it is necessary to determine the funds that can be invested in the project, the scale of the project, the location of the project and the conditions of construction of the power plant. a study report is required.
2. Solar power plants are divided into two modes, off-grid and grid-connected. Off-grid electricity is for your own use; the connection to the network is intended for your own use of part of the electricity produced, and the additional electricity is returned to the State, which will provide the corresponding subsidies.
3. For the construction of solar power plants, each region has relevant policies and specific plans are given based on specific circumstances.
4.Funds for the construction of solar power plants are currently available as loans in some regions.
5. A solar power plant is a factory that uses solar energy to produce electricity. It works using photovoltaic technology which converts solar energy into electrical energy.
6. Solar power plants generally use solar panels to directly generate power by absorbing photon energy, also known as photovoltaic power generation.
7. Solar tower power plants use reflected sunlight to heat water to produce electricity, i.e. the production of reflected solar thermal energy.