Although you initially contacted the company through them, you will then need to contact the company's human resources department directly instead of through the owner. And you should call the company's human resources department in a day or two to inquire about the situation and call back. It will be bad if you go through an intermediary later. Things can be delayed for a variety of reasons, intentional or unintentional.
Wuxi Suntech Solar Power Co., Ltd., what is the current salary there? How long is the trial period, how long does it take to become a full-time employee and are you currently recruiting?
Suntech products are loved all over the world and are widely used in communications, radio and television, transportation, petroleum, lighting and other industries. Suntech actively participated and undertook the B projectWorld Bank, the Western Bright Project and the Beijing 2008 Green Olympics Project (solar energy supplier for the Bird's Nest Project, the main stadium of the Olympic Games). Its excellent productivity and product quality have been good. received by domestic and foreign markets. While the company is committed to the localization of the photovoltaic industrial chain and the large-scale development of photovoltaics in China, it also strives to accelerate the pace of large-scale industrialization research in second generation polycrystalline silicon thin film solar cells and maintain its technological leadership in the photovoltaic industry.
Wuxi Suntech Solar Power Co., Ltd. completed the installation of its first polycrystalline silicon solar cell production line in September 2002. The company received a $6 million grant from the government mWuxi University a year before its creation. The initial production scale was very limited, only 10 MW. Since its establishment, Wuxi Suntech Solar Power Co., Ltd. has experienced rapid development and become the fourth largest solar cell manufacturer in the world. Its production volume reached 270 MW in 2006 and is expected to reach 470 MW in 2007.
The company's main competitors are the Japanese Sharp and Kyocera, as well as the German Q-cells. Suntech Power is targeting 2010 and plans to reach a production volume of 1,000 units, at which point it will become one of the world's three largest solar power manufacturers.
The company was listed on the New York Stock Exchange on December 14, 2005, with an issue price of US$15 per share. Market value: 197 million (USD)
No intermediary fees are required.
The current salary of operator 1 is: base salary: 1,100 ! + Balance sheet: (0-600) + Subsidy for the quarter of nuit = more than 2,000!
Trial period: 2 months
Work 20 days per month! After working 12 hours a day and paying 6 gold coins, the salary is more than 2,000!
Working hours: (9:00 a.m. to 9:00 p.m., and night shift: 9:00 p.m. to 9:00 a.m.!)
Operators can be upgraded! Depending on your performance, you will move from operator one to operator three.
Operator one has a base salary of 1,100, operator two over 1,200, and operator three of around 1,400
But the operators are tired! If you have the ability, you can be a process leader/foreman (you don't need to work and are comfortable)