Rudila Hydroelectric Power Station mainly produces electricity, but also performs comprehensive use functions such as soil and water conservation, navigation in the reservoir area and tourism. According to the design results of the pre-feasibility study, the normal water storage level of the plant is 1,223 m, with a total storage capacity of 1.718 billion cubic meters. It is equipped with 6 units of 360 MW, with a total installed capacity of. 2160 MW, an average electricity production over several years of 9.957 billion kWh and an annual hour of use of 4610h I and other large projects of type (1). The engineering center buildings are mainly composed of roller compacted concrete gravity dams, surface holes and bottom holes of river bed overflow, diversion tunnels, right bank underground power plants and stations switching and other buildings.
Altitude of the Rudila Hydroelectric Power Plant
(1) Revision of the “Design Code for the Pressure Chamber of the Hydroelectric Power Plant”
(2) Revision of “Model Testing Procedures for Pressure Bypass System of Hydropower Plant”
(3) “Hydraulic Numerical Simulation and Model Testing of Pressure Diversion System” waste water of Ludila hydropower station”
(4) “Hydraulic model test function of leakage pipeline system of Guoqiao hydropower station”
(5) "Numerical calculation and analysis of the hydraulic transition process of the Heimifeng pumped-storage power plant"
(6) "Jinping-type demonstration and numerical simulation study of the upstream surge chamber a secondary hydroelectric power plant"
Awards and distinctions
"Key technologies and engineering practices of the transi process"Theory of transition process and technical application of hydroelectric power stations" won the first prize of the National Science and Technology Progress Award 2008, ranked first. science and technology of Hubei Province in 2006, ranking first
“Research and application of key technologies for high variable roof waste water system of underground power plants of hydropower plants” a. won the first prize of the Hubei Provincial Science and Technology Progress Award in 2005, ranking third
Rudila Hydropower Station Incidents
1800. meters According to Baidu Map query, Ludila Hydropower Station is located on the middle reaches of the main stream of Jinsha River, at the junction of Binchuan County, Dali Bai Autonomous Prefecture, Province.of Yunnan and Yongsheng County, Lijiang City. "eight levels of a reservoir" in the hydropower plan of the main course of the Jinsha River. The eighth-level hydropower station, with an altitude of 1,800 meters, has a total installed capacity of 2.16 million kilowatts and an annual electricity output of 9.67 billion kilowatt hours. It is one of the largest hydroelectric power stations in the middle reaches of the Jinsha River.
The construction of the project violates current national regulations. The basic information and handling decisions of illegal projects are as follows:
Construction unit: Yunnan Huadian Ludila Hydropower Co., Ltd.
Construction location: Dali Prefecture , Lijiang City, Yunnan Province
Illegal facts: The project has a total investment of 21.33 billion yuan, an installed capacity of 2.16 million kilowatts and a storage capacity of1.718 billion cubic meters. The project was closed in January 2009 without environmental assessment approval and had a greater impact on the ecology of the middle reaches of the Jinsha River. (Now approved)
Decision: Order the project to stop the construction of the main dam, take effective measures to ensure that the upstream and downstream cofferdams can safely survive flooding, hold demonstrations additional information on environmental impact and further improve the environment based on the findings of the demonstration impact assessment.