Xi'an Sanfu Floor Heating Engineering Installation Co., Ltd. is a limited liability company (investment or holding by an individual) registered on April 14, 2004. Its registered address is at Pipe Mall. Industry Wholesale Base, Hongqi East Road, Weiyang District, Room 302 of Xi'an City Building.
The social credit code/unified registration number of Xi'an Sanfu Floor Heating Engineering Installation Co., Ltd. is 91610100757813919C. The legal entity is Li Nianguo. The company is currently open for business.
The business scope of Xi'an Sanfu Floor Heating Engineering Installation Co., Ltd. is: the installation and sale of pipeline equipment; construction of underfloor heating projects; the sale of wall-mounted boilers and building decoration materials (except wood).
Xi'an Sanfu Floor Heating Engineering Installation Co., Ltd. invested in0 foreign companies and has 1 branch.
View more news and information about Xi'an Sanfu Floor Heating Engineering Installation Co., Ltd. via Aiqicha.
Advantages of Xi'an Jiushengmeike wallpaper Xi'an electric floor heating
1: Walls and floors of interior and exterior cement concrete structures and structures of mortar masonry 2: Bathrooms, waterproofing of floors and walls of bathrooms, kitchens, floors, balconies and swimming pools; 3: Used for priming before paving stones, ceramic tiles, wooden floors, wallpapers and plasterboards to prevent moisture and salt pollution.
Treatment of the base surface (substrate): 1: The substrate must be solid, flat, clean, free of dust, grease, wax, release agent, etc. and other debris 2: There are pores and cracks; on the surface, uneven defects must be repaired and smoothed in advanceAlable with cement mortar. It is recommended to glue plastic strips over the expansion joints and add a layer of non-woven fabric to the joints. buccal grouting material for filling; 3: Yin and Yang corners should be plastered in an arc shape (or V shape); 4: Make sure the base surface is completely damp, but with no free water; plaster surface) must dry completely before construction.
Floor heating decoration Xi'an Antarctica Xi'an Shanghai Liangjian decoration living room partition wall installation method
Compared with traditional heating methods, the Electric underfloor heating has the following advantages: Firstly, the room temperature is evenly distributed.
When using underfloor heating, since the entire floor dissipates heat evenly, the temperature difference in the room is extremely small.
And the indoor temperature gradually decreases from low to high, and the floor temperature is higher than the temperature of the human respiratory system, giving people a comfortable feeling of warm feet and cool head.
Second, it promotes the creation of a healthy indoor environment.
Use radiators for heating. Generally, the outlet water temperature is above 7 degrees Celsius, but when the temperature reaches 8 degrees, dust clusters will be generated, making the wall above the radiator covered with dust.
Floor heating can eliminate the convection of dust masses and turbid air, providing people with a cool, warm and healthy environment.
Third, high efficiency and energy saving.
Due to the large heating radiation surface, the required water supply temperature is relatively low, only 4-5 degrees.
Et it can beat some of the heat from traditional heating radiators.
1. Elastic wire positioning installationBeforehand, use the ground as a benchmark for horizontal and vertical measurements and markings, find the fixed points and mark them clearly.
2. Before installing the frame material, the partition with the frame should be measured and the edge and horizontal position determined to ensure that the installation size and location of the connecting devices are accurate.
If the interface is rough, you should use a grinding tool to smooth it before installation.
3. Installation and construction Generally speaking, the installation of partition walls is divided into two methods, namely the overall frame installation and the horizontal and vertical installation, which has an important relationship with the area of the partition wall. .
When the installation is in the methodWhen installing the frame, the frame must be moved to the preset installation position before installation. If the position is accurate, it can be fixed with expansion screws and then weld the inside. and external profiles must be carried out. Remember to install the frame before anti-corrosion measures have been taken beforehand, and a careful and detailed inspection will be carried out after the overall welding installation is completed.
Do a good job of detecting leaks and filling welding defects and anti-corrosion.