If it is illegally occupied, you can report it to the Land and Resources Office and request an investigation and sanction. In the event of expropriation, land compensation, resettlement subsidies and compensation for young crops should be paid. For specific compensation standards, please check with your local Land and Resources Department.
The land use unit must provide the following documents:
1. A written land use application submitted by citizens, corporations, or other organizations that are to occupy or requisition forest land for the county administrative department of forestry;
2. Project approval documents
(1) For construction projects subject to the approval system, submit the approval of the feasibility study report and the approval of the preliminary design; construction projectsUnder the approval system and filing system, submit for approval, confirmation document for deposit. If forest land is requisitioned or occupied for the implementation of urban construction projects in the urban planning zone, a planning permit for the territory to be built must be submitted; /p>
3. Certificate of identity of the construction unit or the person who occupies and acquires the forest land
4. Forest land, forest tree compensation and resettlement subsidy agreement signed between the construction unit and the construction company; owner of the forest rights of the occupied and acquired forest land;
5. A feasibility report on the use of forest land for the project carried out by a qualified forest survey, planning and design unit < /p><; p>6. Complete the “Forest Land Use Application Form”
7.
8. Other supporting documents:
(1) If you occupy or requisition forested land in nature reserves, world heritage sites, forest parks and scenic spots, you must submit notices which are agreement. with the administrative services concerned. ;
(2) For mining, quarrying, sand extraction and land borrowing projects, submit environmental impact assessment and approval of the soil and water conservation plan;
(3) Replacement of occupation and expropriation For forest land procedures, a copy of the legal document dealing with the file and a copy of the receipt of full payment of fines (fines).
Procedures
(1) The construction unit submits an application to the county forest administrative department
(2) State (city), county (; district, city) ) Forest administrative departmentss at two levels presented specific and clear examination opinions, as well as forest vegetation restoration measures and on-site inspection reports, and submitted them step by step to the Yunnan Provincial Forestry Department; p>
(3) Occupy or requisition forest land for protection or special purposes The area of forest land is less than 10 hectares, the area of timber forests, economic forests, timber forests heating and their logging traces are less than 35 hectares, and the area of other forest land is less than 70 hectares. After approval by the Provincial Forestry Department, a “Forest Land Use Approval Letter” will be issued to the applicant.
How much compensation is required for wind turbines that temporarily occupy agricultural land per mu?
81 meters.
In November 2015,China's largest offshore wind turbine has been successfully installed in Pinghai Bay in Putian, Fujian. This wind turbine adopts model XE128-5000 of Xiangdian Electric Power Co., Ltd., with a single unit capacity of 5MW, a channel diameter of 128 meters and a hub center height of 81 meters. It belongs to the 50 MW Pinghai Bay. in Putian, Fujian.Offshore wind projects.
Principle
Convert the kinetic energy of wind into mechanical kinetic energy, and then convert the mechanical energy into electrical kinetic energy. This is wind energy production. The principle of wind power generation is to use wind energy to rotate the blades of the wind turbine, then use a speed multiplier to increase the rotation speed to induce the generator to produce electricity.
Detailed information
The first permanent magnet and driven offshore wind turbine10MW direct power plant from China has completed factory testing in Deyang, Sichuan. Dongfang Electric Group has the first IEC design certification certificate for this unit in China. This is the first 10 MW offshore wind turbine produced by Dongfang Electric Group.
On August 21, 2019, in Deyang, China's equipment manufacturing capital, at Dongfang Electric Group Dongfang Motor Co., Ltd., the reporter saw that this wind turbine with completely intellectual property rights independent operated normally with a live load. Around 5:00 p.m., the factory test is completed and the product can be shipped out of the factory.
Compared to wind turbines of 5 MW and less, 10 MW wind turbines are “large”. On October 17, 2018, Dongfang Electric Group Wind Power Co., Ltd. obtained the IEC design certification certificate for 10MW offshore wind turbines issued by China Quality Certification Center. This certificateis a “passport” for the design and manufacture of 10 offshore wind turbines. MW offshore wind turbines.
Baidu Encyclopedia - Wind Turbine
The compensation standards for wind power generation are as follows: 1. Compensation standards for the acquisition of cultivated land, the average compensation for dry fields is 53,000 yuan per mu, and the average compensation for rice fields is 53,000 yuan per mu, and the average compensation for vegetable fields is 150,000 yuan per mu. 2. Compensation standards for expropriation of basic agricultural land, average compensation; for dry fields, the average compensation is 58,000 yuan per mu, the average compensation for rice fields is 99,000 yuan per mu, and the average compensation for vegetable fields is 15.6 yuan per mu. 3. The average compensation for the expropriation of forest land and other agricultural land; land is 138,000 yuan permu; 4. The average compensation for the expropriation of industrial and mining building land, villagers' residences, roads and other collective building land is 136,000 yuan per mu; hills, wastelands, barren beaches, barren ditches and unused land cost 21,000 yuan per mu. Legal basis: Article 47 of the “Land Management Law of the People's Republic of China”. In the event of expropriation of land, compensation will be paid depending on the initial destination of the expropriated land. Compensation fees for agricultural land acquisition include land compensation fees, resettlement subsidies, and compensation fees for land attachments and young crops. Land compensation costs for the expropriation of cultivated land will be six to ten times the average annual value of production for the three years preceding the expropriation of land.are cultivated. Resettlement assistance for the acquisition of cultivated land will be calculated on the basis of the number of agricultural people to be resettled. The number of agricultural persons to be resettled is calculated by dividing the area of expropriated cultivated land by the average area of cultivated land per person of the expropriated unit before land acquisition. The resettlement subsidy standard for each agricultural population to be resettled is four to six times the average annual value of production in the three years preceding the expropriation of agricultural land. However, resettlement aid for each hectare of expropriated cultivated land must not exceed fifteen times the average annual value of production for the three years preceding the expropriation.