Dipier Wind Turbine Blade (Yangzhou) Co., Ltd. is a limited liability company (wholly owned by a foreign legal entity) registered in Yangzhou City, Jiangsu Province on April 28, 2018. Its registered address is located at 9 Yangzijiang South Road, Yangzhou Economic and Technological Development Zone , rooms 801, 804 and 805 on the 8th floor of the administrative building.
The social credit code/unified registration number of Dupierre Wind Turbine Blade (Yangzhou) Co., Ltd. is 91321091MA1WFN336H, the legal entity is William Eugene Siwek and the company is currently in operation.
The business scope of Dipier Wind Turbine Blade (Yangzhou) Co., Ltd. is as follows: complete sets of new energy generation equipment or key equipment: wind power equipment of 2.5MW and above (wind turbine blades, molds and related products) R&D, production, sales and after sales service ; product salesmetal, plastic products, non-metallic mineral products, chemicals and raw materials (excluding dangerous goods engaged in technological research and development, technology); the field of new non-metallic inorganic materials and products Consulting, technology promotion and technical services; international transport agency business for import and export services of sea, land and air cargo (excluding the handling of dangerous goods); and loading. (Projects that require approval according to law can only carry out commercial activities after approval from relevant departments). In this province, the current share capital of businesses is average.
View more information and information from Dupierre Wind Turbine Blade (Yangzhou) Co., Ltd. via Baidu Enterprise Credit.
LThe Lingang Production Base Project of Siemens Wind Power Blades (Shanghai) Co., Ltd. is located in Lot I0204-A, Heavy Equipment Park, Lingang Economic Development Zone, with Miaoxiang Road on the south and Jiangshan on the north, and to the north of Jiangshan Road is the land used by Shanghai Zhonggang Yangshan Logistics Equipment Co., Ltd. The total area of the project is approximately 177,000 m2.
The project provides for the construction of two new factories. The complete factory building on the north side includes fiberglass cutting and blade molding workshops, auxiliary equipment rooms and offices, and space is reserved for the engine. room factory. The south side of the factory building is a blade machine shop, including repair, sandblasting, painting and other processes, with part of the space reserved for the nacelle factory.
The products of this project are blades (B45) for production equipmentuction of wind energy, with an annual production of 500 MW (each equipment produced in this project is 2.3 MW, with 3 blades. Calculate the annual production of blades the capacity of this project on this basis is 652 pieces) .
This project requires 250 employees, implements a three-shift work system and has an annual working day of 250 days. The project represents a total investment of 64 million euros and should be put into production by the end of 2010.