General requirements: All localities should accelerate the preparation of local photovoltaic power generation plans, and rationally organize photovoltaic power generation construction projects on the basis of the national photovoltaic industry development plan and local realities. Planning for photovoltaic energy production must be in accordance with the overall land use plan and other relevant plans. If unused land can be used, agricultural land should not be occupied; if inferior land can be used, good land should not be occupied.
Legal basis:
"Notice of the Ministry of Land and Resources, the Poverty Alleviation Office of the State Council and the National Energy Administration on supporting photovoltaic poverty reduction and regulating land use for the industrial sectorphotovoltaic power generation plan"
1, the general requirement is that all localities accelerate the preparation of local photovoltaic power generation plans and rationally organize power generation construction projects based on the national photovoltaic industry development plan and the actual situation of the region. The planning of photovoltaic energy production must be in accordance with the overall land use plan and other relevant plans. unused land can be used, agricultural land should not be occupied; if inferior land can be used, good land should not be occupied. It is prohibited to occupy permanent basic agricultural land in any way. whatsoever and it is strictly prohibited to develop photovoltaic energy production projects in areas expressly prohibited by theRelevant national laws, regulations and plans. Except for poverty alleviation photovoltaic projects identified in this document and photovoltaic power plant projects built on agricultural land (hereinafter referred to as photovoltaic complex projects), land used for other photovoltaic power plant projects must strictly comply with the provisions of the Land National. and the Resources Regulations [2015] No. 5. If the land is used, the land used for the PV array can be identified based on the original land type without changing the use of the land. Land can be acquired through a lease or otherwise. methods. Both parties sign a compensation agreement and report it to the local land and resources department for registration. Other parts of the land use must be processed for use approval proceduresland if agricultural land is used. go through the approval procedures for building land. New construction, reconstruction and extension of ground-mounted photovoltaic power plant projects must be managed based on building land and unused land. The requirements of the “Land Use Monitoring Indicators for Photovoltaic Power Plant Projects” (Land and Assets Regulations [2015] No. 11). must be strictly implemented and land must be used rationally.
2. Actively secure land for poverty alleviation photovoltaic projects. For photovoltaic energy production projects built as part of the fight against poverty in very poor areas, as well as for photovoltaic energy production projects as part of the construction of national photovoltaic power plants to reduce poverty at the level ofs villages, determined and issued by the National Energy Administration and the State Poverty Council. Lightening office, substations and operations management centers, and collection line pole and tower foundations. Used land is managed as construction land, and all localities must give priority protection when preparing comprehensive land use plans and annual land use plans, and manage construction land. approval procedures in accordance with law; on-site road lands may be managed as rural road lands; PV panels use permanent base agricultural land. For agricultural land other than agricultural production, the nature of the original land does not need to be changed on site. not to destroy the conditions of agricultural production; land intended for capture linesge of energy laid by directly buried cables will be managed in the same way as the land intended for the project's photovoltaic park.
Monticello Dam (also known as Monticello Dam), (latitude and longitude: 38.512235, -122.104883) is located in Greenpa County, California, United States. This is a large-scale floodway (known as the Glory). hole) in the United States. One of the seven largest man-made caves in the world), its function is to release excess water as quickly as possible when the storage capacity of Monticello Dam reaches its limit. number It has been shown that when the glory hole is fully open, the water flow from Monticello can reach 48,400 cubic feet (1,370 cubic meters) per second.