1. Contact the construction unit or site administrator, explain the reason for using a generator, and ask if there is a generator available.
2. If the construction unit or site manager cannot provide a generator, you can contact your own supplier or rental company to rent a generator.
A 250 kW generator is required. bajunsheng's answer is incorrect. A 110 kW pump, even if calculated based on 3 times the rated current, requires a generator of more than 250 kW to start, and it must be an ordinary large generator. A. Factory generator, otherwise at least a 300 kW generator is required.
The Ivanfu generator has the greatest capacity to start the engine