There is no fixed meter level. There is usually an underground coal unloading ditch and an underground coal loading system. Then, each section of the coal loading system is tilted, dumping from one transfer station to the next. the belt layer on the last raw coal hopper is horizontal, but the height is not fixed, and the capacity of the random group changes, generally greater than 30 meters and less than 40 meters.
The coal transportation system of a thermal power plant generally includes a coal unloading system, a coal storage system, a coal mixing system and a coal loading system.
Determination of system production: the production of the coal unloading system to the coal storage system must be consistent with the production of the coal unloading equipment, and the production of coal transportation systemcoal storage to the main power plant must match the coal consumption of the boiler.