ETSI TS 132 107 V11.0.1 (2013-04)

Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Fixed Mobile Convergence (FMC) Federated Network Information Model (FNIM) (3GPP TS 32.107 version 11.0.1 Release 11)

ETSI TS 132 107 V11.0.1 (2013-04)

Name:ETSI TS 132 107 V11.0.1 (2013-04)   Standard name:Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Fixed Mobile Convergence (FMC) Federated Network Information Model (FNIM) (3GPP TS 32.107 version 11.0.1 Release 11)
Standard number:ETSI TS 132 107 V11.0.1 (2013-04)   language:English language
Release Date:25-Apr-2013   technical committee:3GPP SA 5 - Telecom Management
Drafting committee:   ICS number:
ETSI TS 132 107 V11.0.1 (2013-04)






Technical Specification
Universal Mobile Telecommunications System (UMTS);
LTE;
Telecommunication management;
Fixed Mobile Convergence (FMC)
Federated Network Information Model (FNIM)
(3GPP TS 32.107 version 11.0.1 Release 11)

---------------------- Page: 1 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 1 ETSI TS 132 107 V11.0.1 (2013-04)



Reference
DTS/TSGS-0532107vb01
Keywords
LTE,UMTS
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
Individual copies of the present document can be downloaded from:
http://www.etsi.org
The present document may be made available in more than one electronic version or in print. In any case of existing or
perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF).
In case of dispute, the reference shall be the printing on ETSI printers of the PDF version kept on a specific network drive
within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
http://portal.etsi.org/tb/status/status.asp
If you find errors in the present document, please send your comment to one of the following services:
http://portal.etsi.org/chaircor/ETSI_support.asp
Copyright Notification
No part may be reproduced except as authorized by written permission.
The copyright and the foregoing restriction extend to reproduction in all media.

© European Telecommunications Standards Institute 2013.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members.
TM
3GPP and LTE™ are Trade Marks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
GSM® and the GSM logo are Trade Marks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 2 ETSI TS 132 107 V11.0.1 (2013-04)
Intellectual Property Rights
IPRs essential or potentially essential to the present document may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (http://ipr.etsi.org).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Foreword
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 3 ETSI TS 132 107 V11.0.1 (2013-04)
Contents
Intellectual Property Rights . 2
Foreword . 2
Foreword . 4
1 Scope . 5
2 References . 7
3 Definitions and abbreviations . 8
3.1 Definitions . 8
3.2 Abbreviations . 8
4 Characteristics and context of FNIM . 9
4.1 Characteristics . 9
4.2 Contexts of FNIM . 9
4.2.1 A broad standardization context . 9
4.2.2 Integration with 3GPP/SA5 standard production processes . 10
4.2.3 Integration with TM Forum’s universe of discourse . 11
5 Features of FNIM . 13
5.1 Introduction . 13
5.2 Model components . 13
5.3 UIM Model component partition . 13
5.4 Ability to navigate among instances of different model components . 13
5.5 Ability to import model elements designed elsewhere . 14
5.6 Independence of tool and platform . 14
5.7 Independence of solution technology and access protocol design . 14
5.8 Experience . 14
5.9 Model components release handling . 15
6 Elements of the FNIM . 16
6.1 FNIM components . 16
6.2 Relations between model components (including UIM) . 16
6.3 Relations among pairs of model components . 17
6.4 Production of solutions re FNIM . 17
7 Name Convention for class instances (managed objects) . 19
7.1 Background . 19
7.1.1 Name . 19
7.1.2 Name space . 19
7.1.3 Unique names . 20
Annex A (informative): Modelling methodology/approach not recommended . 22
Annex B (informative): 3GPP TS network resource models . 23
Annex C (informative): TM Forum defined network resource models . 24
Annex D (informative): Change history . 25
History . 26

ETSI

---------------------- Page: 4 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 4 ETSI TS 132 107 V11.0.1 (2013-04)
Foreword
rd
This Technical Specification has been produced by the 3 Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
Ready for Converged Management
This specification is part of a set that has been developed for converged management solutions.
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 5 ETSI TS 132 107 V11.0.1 (2013-04)
1 Scope
On-going industry convergence and pressure to reduce cost is placing an ever-increasing emphasis on the need to
rationalize and align various network management aspects across boundaries of standards/specifications producing
organizations. The cost, resulting from integration and management challenges, of the lack of a coherent treatment of
the whole network has becoming increasingly apparent to the point where operators of networks are demanding action.
This document provides key concepts and principles for the Federated Network Information Model covering all key
aspects of a solution to the on-going industry convergence challenge. The proposal focuses on Information Model
federation and is constructed to best deal with the various contradictory pressures of the current environment providing
a pragmatic and realizable approach. The structure proposed will be called the Federated Network Information Model
(FNIM).
The proposal set out in this document:
Explains:
- How, from a technical perspective, a number of standards and specifications generated by different
organizations can function together to bring greater coherence to the management of converged networks and
hence reduce operations costs.
- Specifically how TM Forum and 3GPP can work with each other and with other industry groups in a
Standards Federation to develop a Federated Network Information Model drawing on insights from the broad
community (including the TM Forum SID [7], TM Forum MTNM/MTOSI [8], 3GPP SA5 IRPs [14], DMTF
CIM [15]).
- How the Federated Network Information Model can be used from a technical perspective (with the focus here
being the Network Model).
Recognizes:
- The network is “always on”, therefore changes in management solutions should not impact networks in
operation.
- There will always be on-going change.
- That this is only a start on a very long journey.
Allows and enables:
- Decoupling of concerns across the industry whilst growing industry coherence.
- Differing delivery pace across the industry whilst aiming for industry convergence.
- Variety from innovation whilst removing unnecessary variety in management infrastructure.
- Temporary divergences and overlaps during the convergence process.
Ensures:
- Change is made only as a result of understanding of specific market needs.
- Progress by providing coherent solutions to satisfy the needs of all participating industry partners in order not
to be blocked by the slowest laggard.
Highlights:
- The challenges of dealing with differing methodologies/tooling used across the standards arena and points
out that methodology/tooling differences if ignored will significantly slow progress towards the target.
- The need for development of a new governance regime and points to some of the attributes of such a regime.
- An approach of gradual restructuring and a controlled converging coherence starting small and growing step
by value-justified step.
ETSI

---------------------- Page: 6 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 6 ETSI TS 132 107 V11.0.1 (2013-04)
- The challenge of presenting the models so all can have an identical understanding.
- The challenge of interpreting models from different origins, with their different terminology and viewpoints,
to arrive at a shared understanding through a federated model. This leads to recognition of the need for a deeper
uniform semantic analysis of the area covered by the umbrella information model (UIM) and the navigation
points among concrete models which may further lead to the need for the development of information
architectures and patterns.
This document focuses on the Information Model aspect of the problem as it is clear that the lack of an agreed-upon,
coherent information model across organizational boundaries to support the FMC aspects of the industry that defines
the things to be managed and the way they should be expressed is one of the first aspects that need to be tackled.
Editor’s note: Prior to embarking on a further summary of the proposal and its benefits, it is important to emphasize
that the definition of the term “model” has to be carefully considered. A model is comprised of parts that
themselves can be seen as models. As a consequence whether this activity results in a single model or a
set of models depends upon perspective. The critical consideration is whether the parts of the solution can
be interrelated and from the perspective of the problem highlighted above whether the parts can be
interrelated across what were previously un-navigable barriers. The solution offers this navigability.
Conversely it is critical that the solution offers appropriate decoupling of concerns and of governance.
Whether this is considered one model or many is not relevant as long as the solution offers the properties,
such as those noted above, that are critical for industry success.
This document proposes a Federated approach to model development and emphasizes the need for the development of
an Umbrella Information Model (UIM) and its relationships with the other domain specific models. The document also
deals with direct relationships between domain/technology specific concrete models.
It is proposed that:
- The work will be published and expressed in UML and will also be published in formats appropriate for each
of the participating bodies to absorb (this may require nothing more than the UML format in some cases). The
output form required by a particular body will be generated by resources contributed by that body.
- As necessary the model will be embellished using stereotype to express all aspects/properties of the model.
The proposal recognizes that the TM Forum Information Framework (SID) [7] and the TM Forum Integration
Framework (MTNM/MTOSI) [8] work provide an enterprise-wide structure and model that can be used to seed the
converged model. The proposal recognizes that the 3GPP SA5 group work [14] provides models relating to mobile
networks (including RANs, CNs and IMS) that can be used to seed the converged model.
The proposal:
- Ensures on-going reduction in cost of integration and improvement of degree of integration for the purpose of
End-to-End management;
- Enables models from many organizations to be used together for the purpose of End-to-End management
(recognizing that there are a number of critical governance issues to be overcome to enable this);
- Provides structure for the alignment on a deeper understanding of the semantics and for the development and
maintenance of an information architecture and associated patterns;
- Provides both an initial pragmatic solution form and a longer term target;
- Recognizes that the model will evolve in stages, but will never be “completed” and hence this is an on-going
activity;
- Recognizes the importance of providing solutions that are backward compatible to existing standards.
See [13, 17]
ETSI

---------------------- Page: 7 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 7 ETSI TS 132 107 V11.0.1 (2013-04)
This content of this document has been jointly developed by 3GPP and TM Forum as part of the Joint Working Group
on Resource Model Alignment [18].
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present
document.
- References are either specific (identified by date of publication, edition number, version number, etc.) or
non-specific.
- For a specific reference, subsequent revisions do not apply.
- For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including
a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same
Release as the present document.
[1] ITU-T X.680 "OSI networking and system aspects – Abstract Syntax Notation One (ASN.1)".
[2] 3GPP TS 32.642 "UTRAN network resources IRP: NRM".
[3] ATM Forum, Technical Committee, Network Management, M4 Network View CMIP MIB
Specification ("CMIP Specification for the M4 Interface", Sep 1995, http://www.broadband-
forum.org/ftp/pub/approved-specs/af-nm-0027.000.pdf).
[4] 3GPP TS 32.622 "Generic network resources IRP: NRM".
[5] MEF Technical Specification MEF 7.1, "Phase 2 EMS-NMS Information Model", October 2009.
[6] 3GPP2 S.S0028-E "OAM&P for cdma2000 (Overview, 3GPP R7 Delta Specification, 3GPP2
Network Resource Model IRP)".
[7] TM Forum GB922, Information Framework (SID) Suite, Release 9.0
(http://www.tmforum.org/browse.aspx?catID=9285&artf=artf2048).
[8] TM Forum MTOSI 2.0
(http://www.tmforum.org/MTOSIRelease20/MTOSISolutionSuite/35252/article.html).
[9] TM Forum SD1-44_ConnectionlessTechnologyManagement.pdf available as part of [8]
(Especially Appendix III "Mapping MEF – MTNMETH").
[10] TM Forum SD1-7_DSLOverview.pdf available as part of [8].
[11] TM Forum SD1-18_layers.pdf available as part of [8] (Especially 4.2.7 ATM and SDH capable
STM-4).
[12] TM Forum "Connectionless, Connection Oriented Convergence and TP Modelling"
(http://tmforum.org/FeatureDescription/ConnectionlessConnection/41718/article.html).
[13] TM Forum TR 146 "Lifecycle Compatibility Release 1.0"
(http://www.tmforum.org/TechnicalReports/TR146LifecycleCompatibility/36664/article.html).
[14] See Appendix B for the list of 3GPP Technical Specification series on Network Resource Models.
[15] DMTF CIM ("Distributed Management Task Force Common Information Model").
[16] 3GPP TR 32.852 "Fixed Mobile Convergence (FMC) 3GPP/TM Forum Model Relationships &
Use Cases".
[17] 3GPP TS 32.154 "Backward and Forward Compatibility (BFC); Concept and definitions".
[18] 3GPP / TM Forum JWG RMA: "FMC Federated Network Information Model (FNIM)" V3.0.
[19] 3GPP TR 21.905: "Vocabulary for 3GPP Specifications".
ETSI

---------------------- Page: 8 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 8 ETSI TS 132 107 V11.0.1 (2013-04)
3 Definitions and abbreviations
3.1 Definitions
For the purposes of the present document, the terms and definitions given in TR 21.905 [19] and the following apply. A
term defined in the present document takes precedence over the definition of the same term, if any, in TR 21.905 [19].
Encoding: It is the process by which information is converted into symbols to be communicated. In this document, the
‘information’ is captured by the so-called model.
Operations/Notifications: Specification conveyed over an interface between two interacting parties indicating the
action to be performed on some identified entity or set of entities. In general the “operations model”/“business services
model”/“action model” (or similar) cover the definitions of the actions performed to change the state/value/etc. of the
thing and to receive information on changes that have occurred to the thing and to receive information on changes that
have occurred to the thing.
3.2 Abbreviations
For the purposes of the present document, the abbreviations given in TR 21.905 [19] and the following apply. An
abbreviation defined in the present document takes precedence over the definition of the same abbreviation, if any, in
TR 21.905 [19].
DN Distinguished Name
FIM Federated Information Model
FNIM Federated Network Information Model
FMC Fixed Mobile Convergent
IM Information Model
LT Layer Termination
NM Network Management
UIM Umbrella Information Model

ETSI

---------------------- Page: 9 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 9 ETSI TS 132 107 V11.0.1 (2013-04)
4 Characteristics and context of FNIM
4.1 Characteristics
The FNIM is “large scale” in the following sense:
- Different authorities (SDOs or standard organizations including expert group) are responsible for the
development, maintenance and evolution of their own domain specific models.
- Operators may use the whole or part of the FNIM depending on their own business cases.
- Vendors can supply products using part of the FNIM depending on their own business cases.
- The FNIM needs to hold thousands of inter-related modelled entities. Different versions of modelled entities can
co-exist in FNIM.
4.2 Contexts of FNIM
4.2.1 A broad standardization context
Process and
Information
Operation
Architecture
Architecture
Process and
Information
Operation
Model
Model
Solution Solution
Component Component
Architecture Structure
Interface
Specification
Interface
Architecture
Interface
Implementation

Figure 1: Broad standardization context
The figure depicts a broad standardization context. The concept embodied by the term Information Model (of Managed
Elements etc.), abbreviated as IM, is separable from the concept of Process and Operation Model (covering definitions
of activities). Clearly the Process and Operation Model influences and is influenced by the IM.
Encoding in general (of information defined in IM Process and operation model) to achieve an Interface
Implementation is also separable and is not considered further here. Each aspect of the problem is guided and
constrained by an appropriate Architecture (e.g. Metamodel) that defines the breadth and scope of the aspect.
ETSI

---------------------- Page: 10 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 10 ETSI TS 132 107 V11.0.1 (2013-04)
The things in the IM are relevant to some activity identified in the Process and Operation Model. That relevance is
necessary in order to fulfil some purpose of the system. The things in the IM are in many cases relevant to expose at
some Interface in which case they will dictate some aspects of structure of information defined in IM and Process and
Operation Model.
The IM can be broken down into two parts:
− Broad conceptual model that articulates the concepts of the problem space (alternative names are purpose
neutral, implementation neutral views)
− Specific purpose models that each articulate the solution to a specific problem (alternative names are purpose
specific, implementation neutral views)
In summary, the following definitions apply to terms of the above figure:
− Information Model (IM): The representation of things, their properties and their relationships. Example:
TopologicalLink and TerminationPointEncapsulation are things that are interrelated and have properties
represented via attributes.
− Process and Operation Model: The representation of the relevant activities required to facilitate the running of
the business including the flows and interactions. Example: “IsolateCustomerProblem” and
“Track&ManageCustomerProblem” are relevant activities that are interrelated by flows of control and
information. “getAlarmList”, “getAttribute” and “createFlowDomainFragment” are examples of operations.
− Solution Component Structure: The representation of the units of functionality assembled to support the
information defined in the IM and in the Process and Operations Model. Example: NMS and EMS are solution
components that support various process activities and maintain information. The two are interconnected as part
of the structure of the management solution.
− Interface specification: The definition of the interactions between the solution components supporting the
exchange of information and control associated with running of the business. This interaction is in terms of the
information defined in the IM and in the Process and Operations Model.
− Interface implementation: The implementation form of the interfaces appropriate for the runtime environment.
− Architecture: The patterns, rules, metamodels and structures derived from the fundamental properties of the
problem space that guide and constrain the development of the model of each aspect of the problem space.
4.2.2 Integration with 3GPP/SA5 standard production processes
This context describes how 3GPP/SA5 would use the FNIM to produce its specifications that would be used for FMC
network management purpose.
This context only refers to the model part. Note that the FNIM is not related to the design of any network management
protocol.
The FNIM has multiple components. Two such components are the Umbrella Information Model (UIM) and a number
of concrete models (see definition of FNIM in section 0). The right-most box of the following diagram depicts the
classes of the UIM. The middle box depicts one of the concrete models, i.e. the 3GPP IRP NRM concrete model. The
concrete classes are designed as extension of UIM and must use the appropriate relations defined (see clause 6.1).
Using the concrete classes (of the concrete model) as input, 3GPP/SA5 uses appropriate tools to generate and publish
the various specifications.
ETSI

---------------------- Page: 11 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 11 ETSI TS 132 107 V11.0.1 (2013-04)

Figure 2: Context of 3GPP/SA5 usage of FNIM
4.2.3 Integration with TM Forum’s universe of discourse
This context describes how TM Forum would use the FNIM for FMC network management purpose.
Information Model (IM)
Federated
Information Model (FIM)
Federated Network
Information Model (FNIM)
Umbrella
Information Model (UIM)
3GPP IM TM Forum IM

Figure 3: Context of TM Forum usage of various Models
The Federated Information Model (FIM) is a subset of the IM. It relies on a coherent Information Architecture
(including meta-model to ensure integrity and coherence). The FIM focuses on IM relevant to the generation of
interface specifications but does not cover the specific encoding. The positioning of interfaces is essentially dictated by
the Solution Component Structure that defines boundaries.
The following definitions apply to the figure:
− Information Model: See definition in section 4.2.1 “A broad standardization context”.
− Federated Information Model (FIM): The parts of the IM that are being developed collaboratively or have been
developed collaboratively and agreed by two or more standards bodies. Some of these parts will be found in the
specific SDO or standard organization including expert group models.
− Federated Network Information Model (FNIM): The part of the FNIM that deals with Network domain
considerations. There will be other domain models in future (F*IM).
ETSI

---------------------- Page: 12 ----------------------
3GPP TS 32.107 version 11.0.1 Release 11 12 ETSI TS 132 107 V11.0.1 (2013-04)
− Umbrella Information Model (UIM): The parts of the FNIM that represent the agreed model structures that
various SDOs or standard organizations including expert groups will use (via “specific linkages” including
Note 1
inheritance, mappings and other derivations ) for their definitions of their respective Domain/Technology-
specific concrete classes. The use of UIM maximizes the probability of the Domain/Technology-s
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27