ETSI TS 141 101 V12.0.1 (2016-05)

Digital cellular telecommunications system (Phase 2+) (GSM); Technical Specifications and Technical Reports for a GERAN-based 3GPP system (3GPP TS 41.101 version 12.0.1 Release 12)

ETSI TS 141 101 V12.0.1 (2016-05)

Name:ETSI TS 141 101 V12.0.1 (2016-05)   Standard name:Digital cellular telecommunications system (Phase 2+) (GSM); Technical Specifications and Technical Reports for a GERAN-based 3GPP system (3GPP TS 41.101 version 12.0.1 Release 12)
Standard number:ETSI TS 141 101 V12.0.1 (2016-05)   language:English language
Release Date:25-May-2016   technical committee:3GPP SA - Technical Specification Group Services and System Aspects
Drafting committee:   ICS number:
ETSI TS 1141 101 V12.0.1 (201616-05)






TECHNICAL SPECIFICATIONION
Digital cellular telecommmmunications system (Phase e 2+) (GSM);
Technical Speccifications andif Technical Reppoorts
for a GERRAN-based 3GPP system
(3GPP TS 41.1.101 version 12.0.1 Release 12 12)

R
GLOBAL SYSTTEME FOR
MOBILE COMMUUNNICATIONS

---------------------- Page: 1 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 1 ETSI TS 141 101 V12.0.1 (2016-05)



Reference
RTS/TSGS-0041101vc01
Keywords
GSM
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at

If you find errors in the present document, please send your comment to one of the following services:

Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© European Telecommunications Standards Institute 2016.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members.
TM
3GPP and LTE™ are Trade Marks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
GSM® and the GSM logo are Trade Marks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 2 ETSI TS 141 101 V12.0.1 (2016-05)
Intellectual Property Rights
IPRs essential or potentially essential to the present document may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Foreword
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 3 ETSI TS 141 101 V12.0.1 (2016-05)
Contents
Intellectual Property Rights . 2
Foreword . 2
Modal verbs terminology . 2
Foreword . 4
1 Scope . 5
2 References . 5
3 Abbreviations . 5
4 General . 5
5 Specifications and Reports . 5
Annex A (informative): Change history . 29
History . 30

ETSI

---------------------- Page: 4 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 4 ETSI TS 141 101 V12.0.1 (2016-05)
Foreword
rd
This Technical Specification has been produced by the 3 Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 5 ETSI TS 141 101 V12.0.1 (2016-05)
1 Scope
The present document identifies the 3GPP system specifications for Release 11. The specifications and reports of 3GPP
Release 11 have a major version number 11 (i.e. 11.x.y). The listed Specifications are required to build a system based
on GERAN radio technology.
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present
document.
- References are either specific (identified by date of publication, edition number, version number, etc.) or
non-specific.
- For a specific reference, subsequent revisions do not apply.
- For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including
a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same
Release as the present document.
[1] 3GPP TR 21.905: " Vocabulary for 3GPP Specifications".
[2] 3GPP TR 21.900: "Technical Specification Group working methods".
3 Abbreviations
For the purposes of the present document, the terms and definitions given in 3GPP TR 21.905 apply.
4 General
The numbering scheme for specifications is described in 3GPP TR 21.900 [2].
5 Specifications and Reports
NOTE 1: The "for publication?" column of the table below indicates whether or not the documents are intended for
adoption by the partner Standards Development Organizations as their own publications. Those marked
"no" are internal working documents of the 3GPP TSGs.
NOTE 2: For definition of "freezing" of specifications (last two colunms), see 3GPP TS 21.900 [2].

WG For freeze
Number Title frozen
prime publication? date
21.202 Technical Specifications and Technical Reports relating to the SP Yes

Common IP Multimedia Subsystem (IMS)
21.801 Specification drafting rules SP No 2014- yes
09-17
21.900 Technical Specification Group working methods SP Yes 2014- yes
09-17
21.905 Vocabulary for 3GPP Specifications SP Yes 2014- yes
09-17
22.001 Principles of circuit telecommunication services supported by a Public S1 Yes 2014- yes
ETSI

---------------------- Page: 6 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 6 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
Land Mobile Network (PLMN) 09-17
22.002 Circuit Bearer Services (BS) supported by a Public Land Mobile S1 Yes 2014- yes
Network (PLMN) 09-17
22.003 Circuit Teleservices supported by a Public Land Mobile Network S1 Yes 2014- yes
(PLMN) 09-17
22.004 General on supplementary services S1 Yes 2014- yes
09-17
22.011 Service accessibility S1 Yes 2014- yes
09-17
22.016 International Mobile station Equipment Identities (IMEI) S1 Yes 2014- yes
09-17
22.022 Personalisation of Mobile Equipment (ME); Mobile functionality S1 Yes 2014- yes
specification 09-17
22.024 Description of Charge Advice Information (CAI) S1 Yes 2014- yes
09-17
22.030 Man-Machine Interface (MMI) of the User Equipment (UE) S1 Yes 2014- yes
09-17
22.031 3G Security; Fraud Information Gathering System (FIGS); Service S3 Yes 2014- yes
description; Stage 1 09-17
22.032 Immediate Service Termination (IST); Service description; Stage 1 S3 Yes 2014- yes
09-17
22.034 High Speed Circuit Switched Data (HSCSD); Stage 1 S1 Yes 2014- yes
09-17
22.038 (U)SIM Application Toolkit (USAT); Service description; Stage 1 S1 Yes 2014- yes
09-17
22.041 Operator Determined Barring (ODB) S1 Yes 2014- yes
09-17
22.042 Network Identity and TimeZone (NITZ); Service description; Stage 1 S1 Yes 2014- yes
09-17
22.053 Tandem Free Operation (TFO); Service description; Stage 1 S4 Yes 2014- yes
09-17
22.057 Mobile Execution Environment (MExE); Service description; Stage 1 S1 Yes 2014- yes
09-17
22.060 General Packet Radio Service (GPRS); Service description; Stage 1 S1 Yes 2014- yes
09-17
22.066 Support of Mobile Number Portability (MNP); Service description; S1 Yes 2014- yes
Stage 1 09-17
22.067 enhanced Multi Level Precedence and Pre-emption service (eMLPP); S1 Yes 2014- yes
Stage 1 09-17
22.071 Location Services (LCS); Service description; Stage 1 S1 Yes 2014- yes
09-17
22.072 Call Deflection (CD) service description; Stage 1 S1 Yes 2014- yes
09-17
22.076 Noise suppression for the AMR codec; Service description; Stage 1 S4 Yes 2014- yes
09-17
22.078 Customised Applications for Mobile network Enhanced Logic (CAMEL); S1 Yes 2014- yes
Service description; Stage 1 09-17
22.079 Support of Optimal Routeing (SOR); Service definition; Stage 1 S1 Yes 2014- yes
09-17
22.081 Line Identification supplementary services; Stage 1 S1 Yes 2014- yes
09-17
22.082 Call Forwarding (CF) Supplementary Services; Stage 1 S1 Yes 2014- yes
09-17
22.083 Call Waiting (CW) and Call Holding (HOLD); Supplementary Services; S1 Yes 2014- yes
Stage 1 09-17
22.084 MultiParty (MPTY) supplementary service; Stage 1 S1 Yes 2014- yes
09-17
ETSI

---------------------- Page: 7 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 7 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
22.085 Closed User Group (CUG) supplementary services; Stage 1 S1 Yes 2014- yes
09-17
22.086 Advice of Charge (AoC) supplementary services; Stage 1 S1 Yes 2014- yes
09-17
22.087 User-to-User Signalling (UUS); Service description; Stage 1 S1 Yes 2014- yes
09-17
22.088 Call Barring (CB) supplementary services; Stage 1 S1 Yes 2014- yes
09-17
22.090 Unstructured Supplementary Service Data (USSD); Stage 1 S1 Yes 2014- yes
09-17
22.091 Explicit Call Transfer (ECT) supplementary service; Stage 1 S1 Yes 2014- yes
09-17
22.093 Completion of Calls to Busy Subscriber (CCBS); Service description, S1 Yes 2014- yes
Stage 1 09-17
22.094 Follow Me service description; Stage 1 S1 Yes 2014- yes
09-17
22.096 Name identification supplementary services; Stage 1 S1 Yes 2014- yes
09-17
22.097 Multiple Subscriber Profile (MSP) Phase 2; Service description; Stage S1 Yes 2014- yes
1 09-17
22.105 Services and service capabilities S1 Yes 2014- yes
09-17
22.115 Service aspects; Charging and billing S1 Yes 2014- yes
09-17
22.129 Service aspects; Handover requirements between UTRAN and S1 Yes 2014- yes
GERAN or other radio systems 09-17
22.140 Multimedia Messaging Service (MMS); Stage 1 S1 Yes 2014- yes
09-17
22.141 Presence service; Stage 1 S1 Yes 2014- yes
09-17
22.142 Value Added Services (VAS) for Short Message Service (SMS) S1 Yes 2014- yes
requirements 09-17
22.146 Multimedia Broadcast/Multicast Service (MBMS); Stage 1 S1 Yes 2014- yes
09-17
22.153 Multimedia priority service S1 Yes 2014- yes
09-17
22.173 IP Multimedia Core Network Subsystem (IMS) Multimedia Telephony S1 Yes 2014- yes
Service and supplementary services; Stage 1 09-17
22.174 Push Service; Service aspects; Stage 1 S1 Yes 2014- yes
09-17
22.182 Customized Alerting Tones (CAT) requirements; Stage 1 S1 Yes 2014- yes
09-17
22.183 Customized Ringing Signal (CRS) requirements; Stage 1 S1 Yes 2014- yes
09-17
22.226 Global Text Telephony (GTT); Stage 1 S1 Yes 2014- yes
09-17
22.228 Service requirements for the Internet Protocol (IP) multimedia core S1 Yes 2014- yes
network subsystem (IMS); Stage 1 09-17
22.233 Transparent end-to-end packet-switched streaming service; Stage 1 S1 Yes 2014- yes
09-17
22.234 Requirements on 3GPP system to Wireless Local Area Network S1 Yes 2014- yes
(WLAN) interworking 09-17
22.240 Service requirements for 3GPP Generic User Profile (GUP); Stage 1 S1 Yes 2014- yes
09-17
22.243 Speech recognition framework for automated voice services; Stage 1 S1 Yes 2014- yes
09-17
22.246 Multimedia Broadcast/Multicast Service (MBMS) user services; Stage S1 Yes 2014- yes
1 09-17
ETSI

---------------------- Page: 8 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 8 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
22.250 IP Multimedia Subsystem (IMS) Group Management; Stage 1 S1 Yes 2014- yes
09-17
22.259 Service requirements for Personal Network Management (PNM); Stage S1 Yes 2014- yes
1 09-17
22.268 Public Warning System (PWS) requirements S1 Yes 2014- yes
09-17
22.340 IP Multimedia Subsystem (IMS) messaging; Stage 1 S1 Yes 2014- yes
09-17
22.368 Service requirements for Machine-Type Communications (MTC); Stage S1 Yes 2014- yes
1 09-17
22.801 Study on non-MTC mobile data applications impacts S1 No 2014- yes
09-17
22.805 Feasibility study on user plane congestion management S1 No 2014- yes
09-17
22.852 Study on Radio Access Network (RAN) sharing enhancements S1 No 2014- yes
09-17
22.903 Study on Videotelephony teleservice S1 Yes 2014- yes
09-17
22.912 Study into network selection requirements for non-3GPP access S1 Yes 2014- yes
09-17
22.934 Feasibility study on 3GPP system to Wireless Local Area Network S1 Yes 2014- yes
(WLAN) interworking 09-17
22.935 Feasibility study on Location Services (LCS) for Wireless Local Area S1 Yes 2014- yes
Network (WLAN) interworking 09-17
22.936 Multi-system terminals S1 Yes 2014- yes
09-17
22.940 IP Multimedia Subsystem (IMS) messaging S1 Yes 2014- yes
09-17
22.942 Study on Value Added Services (VAS) for Short Message Service S1 Yes 2014- yes
(SMS) 09-17
22.944 Report on service requirements for UE functionality split S1 Yes 2014- yes
09-17
22.948 Study of requirements of IP-Multimedia Subsystem (IMS) convergent S1 Yes 2014- yes
multimedia conferencing 09-17
22.949 Study on a generalized privacy capability S1 Yes 2014- yes
09-17
22.950 Priority service feasibility study S1 Yes 2014- yes
09-17
22.951 Service aspects and requirements for network sharing S1 Yes 2014- yes
09-17
22.952 Priority service guide S1 Yes 2014- yes
09-17
22.953 Multimedia priority service feasibility study S1 Yes 2014- yes
09-17
22.967 Transferring of emergency call data S1 Yes 2014- yes
09-17
22.968 Study for requirements for a Public Warning System (PWS) service S1 Yes 2014- yes
09-17
22.973 IMS Multimedia Telephony service; and supplementary services S1 Yes 2014- yes
09-17
22.977 Feasibility study for speech-enabled services S1 Yes 2014- yes
09-17
22.979 Feasibility study on combined Circuit Switched (CS) calls and IP S1 Yes 2014- yes
Multimedia Subsystem (IMS) sessions 09-17
22.980 Network composition feasibility study S1 Yes 2014- yes
09-17
22.982 Study of Customised Alerting Tone (CAT) requirements S1 Yes 2014- yes
09-17
ETSI

---------------------- Page: 9 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 9 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
22.983 Services alignment and migration S1 Yes 2014- yes
09-17
22.987 Study of haptic services requirements S1 Yes 2014- yes
09-17
23.002 Network architecture S2 Yes 2014- yes
09-17
23.003 Numbering, addressing and identification C4 Yes 2014- yes
09-17
23.007 Restoration procedures C4 Yes 2014- yes
09-17
23.008 Organization of subscriber data C4 Yes 2014- yes
09-17
23.009 Handover procedures C4 Yes 2014- yes
09-17
23.011 Technical realization of Supplementary Services C4 Yes 2014- yes
09-17
23.012 Location management procedures C4 Yes 2014- yes
09-17
23.014 Support of Dual Tone Multi-Frequency (DTMF) signalling C1 Yes 2014- yes
09-17
23.015 Technical realization of Operator Determined Barring (ODB) C4 Yes 2014- yes
09-17
23.016 Subscriber data management; Stage 2 C4 Yes 2014- yes
09-17
23.018 Basic call handling; Technical realization C4 Yes 2014- yes
09-17
23.031 3G Security; Fraud Information Gathering System (FIGS); Technical S3 Yes 2014- yes
realization; Stage 2 09-17
23.032 Universal Geographical Area Description (GAD) S2 Yes 2014- yes
09-17
23.034 High Speed Circuit Switched Data (HSCSD); Stage 2 C1 Yes 2014- yes
09-17
23.035 Immediate Service Termination (IST); Stage 2 S3 Yes 2014- yes
09-17
23.038 Alphabets and language-specific information C1 Yes 2014- yes
09-17
23.040 Technical realization of the Short Message Service (SMS) C1 Yes 2014- yes
09-17
23.041 Technical realization of Cell Broadcast Service (CBS) C1 Yes 2014- yes
09-17
23.042 Compression algorithm for text messaging services C1 Yes 2014- yes
09-17
23.053 Tandem Free Operation (TFO); Service description; Stage 2 S4 Yes 2014- yes
09-17
23.057 Mobile Execution Environment (MExE); Functional description; Stage 2 S2 Yes 2014- yes
09-17
23.060 General Packet Radio Service (GPRS); Service description; Stage 2 S2 Yes 2014- yes
09-17
23.066 Support of Mobile Number Portability (MNP); Technical realization; C4 Yes 2014- yes
Stage 2 09-17
23.067 enhanced Multi-Level Precedence and Pre-emption Service (eMLPP); C4 Yes 2014- yes
Stage 2 09-17
23.072 Call Deflection (CD) supplementary service; Stage 2 C4 Yes 2014- yes
09-17
23.078 Customised Applications for Mobile network Enhanced Logic (CAMEL) C4 Yes 2014- yes
Phase 4; Stage 2 09-17
23.079 Support of Optimal Routeing (SOR); Technical realization C4 Yes 2014- yes
09-17
ETSI

---------------------- Page: 10 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 10 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
23.081 Line Identification supplementary services; Stage 2 C4 Yes 2014- yes
09-17
23.082 Call Forwarding (CF) supplementary services; Stage 2 C4 Yes 2014- yes
09-17
23.083 Call Waiting (CW) and Call Hold (HOLD) supplementary services; C4 Yes 2014- yes
Stage 2 09-17
23.084 Multi Party (MPTY) supplementary service; Stage 2 C4 Yes 2014- yes
09-17
23.085 Closed User Group (CUG) supplementary service; Stage 2 C4 Yes 2014- yes
09-17
23.086 Advice of Charge (AoC) supplementary services; Stage 2 C4 Yes 2014- yes
09-17
23.087 User-to-User Signalling (UUS) supplementary service; Stage 2 C4 Yes 2014- yes
09-17
23.088 Call Barring (CB) Supplementary Services; Stage 2 C4 Yes 2014- yes
09-17
23.090 Unstructured Supplementary Service Data (USSD); Stage 2 C4 Yes 2014- yes
09-17
23.091 Explicit Call Transfer (ECT) supplementary service; Stage 2 C4 Yes 2014- yes
09-17
23.093 Technical realization of Completion of Calls to Busy Subscriber C4 Yes 2014- yes
(CCBS); Stage 2 09-17
23.094 Follow-Me (FM); Stage 2 C4 Yes 2014- yes
09-17
23.096 Name identification supplementary services; Stage 2 C4 Yes 2014- yes
09-17
23.097 Multiple Subscriber Profile (MSP) (Phase X); Stage 2 C4 Yes 2014- yes
09-17
23.107 Quality of Service (QoS) concept and architecture S2 Yes 2014- yes
09-17
23.108 Mobile radio interface layer 3 specification, core network protocols; C1 Yes 2014- yes
Stage 2 09-17
23.110 Universal Mobile Telecommunications System (UMTS) access stratum; S2 Yes 2014- yes
Services and functions 09-17
23.116 Super-Charger technical realization; Stage 2 C4 Yes 2014- yes
09-17
23.122 Non-Access-Stratum (NAS) functions related to Mobile Station (MS) in C1 Yes 2014- yes
idle mode 09-17
23.139 3GPP system - fixed broadband access network interworking; Stage 2 S2 Yes 2014- yes
09-17
23.142 Value-added Services for SMS (VAS4SMS); Interface and signalling C4 Yes 2014- yes
flow 09-17
23.153 Out of band transcoder control; Stage 2 C4 Yes 2014- yes
09-17
23.202 Circuit switched data bearer services C3 Yes 2014- yes
09-17
23.203 Policy and charging control architecture S2 Yes 2014- yes
09-17
23.205 Bearer-independent circuit-switched core network; Stage 2 C4 Yes 2014- yes
09-17
23.207 End-to-end Quality of Service (QoS) concept and architecture S2 Yes 2014- yes
09-17
23.216 Single Radio Voice Call Continuity (SRVCC); Stage 2 S2 Yes 2014- yes
09-17
23.218 IP Multimedia (IM) session handling; IM call model; Stage 2 C1 Yes 2014- yes
09-17
23.221 Architectural requirements S2 Yes 2014- yes
09-17
ETSI

---------------------- Page: 11 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 11 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
23.226 Global text telephony (GTT); Stage 2 S2 Yes 2014- yes
09-17
23.228 IP Multimedia Subsystem (IMS); Stage 2 S2 Yes 2014- yes
09-17
23.231 SIP-I based circuit-switched core network; Stage 2 C4 Yes 2014- yes
09-17
23.236 Intra-domain connection of Radio Access Network (RAN) nodes to S2 Yes 2014- yes
multiple Core Network (CN) nodes 09-17
23.237 IP Multimedia Subsystem (IMS) Service Continuity; Stage 2 S2 Yes 2014- yes
09-17
23.259 Personal Network Management (PNM); Procedures and information C1 Yes 2014- yes
flows; Stage 2 09-17
23.271 Functional stage 2 description of Location Services (LCS) S2 Yes 2014- yes
09-17
23.272 Circuit Switched (CS) fallback in Evolved Packet System (EPS); Stage S2 Yes 2014- yes
2 09-17
23.278 Customised Applications for Mobile network Enhanced Logic (CAMEL) C4 Yes 2014- yes
Phase 4; Stage 2; IM CN Interworking 09-17
23.279 Combining Circuit Switched (CS) and IP Multimedia Subsystem (IMS) S2 Yes 2014- yes
services; Stage 2 09-17
23.284 Local Call Local Switch (LCLS); Stage 2 C4 Yes 2014- yes
09-17
23.292 IP Multimedia Subsystem (IMS) centralized services; Stage 2 S2 Yes 2014- yes
09-17
23.327 Mobility between 3GPP-Wireless Local Area Network (WLAN) S2 Yes 2014- yes
interworking and 3GPP systems 09-17
23.333 Multimedia Resource Function Controller (MRFC) - Multimedia C4 Yes 2014- yes
Resource Function Processor (MRFP) Mp interface: Procedures 09-17
descriptions
23.334 IP Multimedia Subsystem (IMS) Application Level Gateway (IMS-ALG) C4 Yes 2014- yes
- IMS Access Gateway (IMS-AGW) interface: Procedures descriptions 09-17
23.335 User Data Convergence (UDC); Technical realization and information C4 Yes 2014- yes
flows; Stage 2 09-17
23.380 IMS Restoration Procedures C4 Yes 2014- yes
09-17
23.682 Architecture enhancements to facilitate communications with packet S2 Yes 2014- yes
data networks and applications 09-17
23.839 Study on support of Broadband Forum (BBF) access Interworking S2 No 2014- yes
09-17
23.865 Study on Wireless Local Area Network (WLAN) network selection for S2 No 2014- yes
3GPP terminals; Stage 2 09-17
23.866 Study on system improvements for energy efficiency S2 No 2014- yes
09-17
23.919 Direct tunnel deployment guideline S2 Yes 2014- yes
09-17
23.975 IPv6 migration guidelines S2 Yes 2014- yes
09-17
24.002 GSM - UMTS Public Land Mobile Network (PLMN) Access Reference C1 Yes 2014- yes
Configuration 09-17
24.007 Mobile radio interface signalling layer 3; General Aspects C1 Yes 2014- yes
09-17
24.008 Mobile radio interface Layer 3 specification; Core network protocols; C1 Yes 2014- yes
Stage 3 09-17
24.010 Mobile radio interface layer 3; Supplementary services specification; C4 Yes 2014- yes
General aspects 09-17
24.011 Point-to-Point (PP) Short Message Service (SMS) support on mobile C1 Yes 2014- yes
radio interface 09-17
24.022 Radio Link Protocol (RLP) for circuit switched bearer and teleservices C3 Yes 2014- yes
ETSI

---------------------- Page: 12 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 12 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
09-17
24.030 Location Services (LCS); Supplementary service operations; Stage 3 C4 Yes 2014- yes
09-17
24.067 Enhanced Multi-Level Precedence and Pre-emption service (eMLPP); C4 Yes 2014- yes
Stage 3 09-17
24.072 Call Deflection (CD) supplementary service; Stage 3 C4 Yes 2014- yes
09-17
24.080 Mobile radio interface layer 3 supplementary services specification; C4 Yes 2014- yes
Formats and coding 09-17
24.081 Line Identification supplementary services; Stage 3 C4 Yes 2014- yes
09-17
24.082 Call Forwarding (CF) supplementary services; Stage 3 C4 Yes 2014- yes
09-17
24.083 Call Waiting (CW) and Call Hold (HOLD) supplementary services; C4 Yes 2014- yes
Stage 3 09-17
24.084 Multi Party (MPTY) supplementary service; Stage 3 C4 Yes 2014- yes
09-17
24.085 Closed User Group (CUG) supplementary service; Stage 3 C4 Yes 2014- yes
09-17
24.086 Advice of Charge (AoC) supplementary services; Stage 3 C4 Yes 2014- yes
09-17
24.087 User-to-User Signalling (UUS) Supplementary Service; Stage 3 C4 Yes 2014- yes
09-17
24.088 Call Barring (CB) supplementary service; Stage 3 C4 Yes 2014- yes
09-17
24.090 Unstructured Supplementary Service Data (USSD); Stage 3 C4 Yes 2014- yes
09-17
24.091 Explicit Call Transfer (ECT) supplementary service; Stage 3 C4 Yes 2014- yes
09-17
24.093 Completion of Calls to Busy Subscriber (CCBS); Stage 3 C4 Yes 2014- yes
09-17
24.096 Name Identification supplementary services; Stage 3 C4 Yes 2014- yes
09-17
24.141 Presence service using the IP Multimedia (IM) Core Network (CN) C1 Yes 2014- yes
subsystem; Stage 3 09-17
24.147 Conferencing using the IP Multimedia (IM) Core Network (CN) C1 Yes 2014- yes
subsystem; Stage 3 09-17
24.166 3GPP IP Multimedia Subsystem (IMS) conferencing Management C1 Yes 2014- yes
Object (MO) 09-17
24.182 IP Multimedia Subsystem (IMS) Customized Alerting Tones (CAT); C1 Yes 2014- yes
Protocol specification 09-17
24.229 IP multimedia call control protocol based on Session Initiation Protocol C1 Yes 2014- yes
(SIP) and Session Description Protocol (SDP); Stage 3 09-17
24.239 Flexible Alerting (FA) using IP Multimedia (IM) Core Network (CN) C1 Yes 2014- yes
subsystem; Protocol specification 09-17
24.247 Messaging service using the IP Multimedia (IM) Core Network (CN) C1 Yes 2014- yes
subsystem; Stage 3 09-17
24.259 Personal Network Management (PNM); Stage 3 C1 Yes 2014- yes
09-17
24.286 IP Multimedia (IM) Core Network (CN) subsystem Centralized Services C1 Yes 2014- yes
(ICS); Management Object (MO) 09-17
24.294 IP Multimedia Subsystem (IMS) Centralized Services (ICS) protocol via C1 Yes 2014- yes
I1 interface 09-17
24.303 Mobility management based on Dual-Stack Mobile IPv6; Stage 3 C1 Yes 2014- yes
09-17
24.304 Mobility management based on Mobile IPv4; User Equipment (UE) - C1 Yes 2014- yes
foreign agent interface; Stage 3 09-17
ETSI

---------------------- Page: 13 ----------------------
3GPP TS 41.101 version 12.0.1 Release 12 13 ETSI TS 141 101 V12.0.1 (2016-05)
WG For freeze
Number Title frozen
prime publication? date
24.305 Selective Disabling of 3GPP User Equipment Capabilities (SDoUE) C1 Yes 2014- yes
Management Object (MO) 09-17
24.327 Mobility between 3GPP Wireless Local Area Network (WLAN) C1 Yes 2014- yes
interworking (I-WLAN) and 3GPP systems; General Packet Radio 09-17
System (GPRS) and 3GPP I-WLAN aspect
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27