|
TECHNICAL SPECIFICATION
5G;
NR;
Physical layer procedures for data
(3GPP TS 38.214 version 15.2.0 Release 15)
---------------------- Page: 1 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 1 ETSI TS 138 214 V15.2.0 (2018-07)
Reference
DTS/TSGR-0138214vf20
Keywords
5G
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
If you find errors in the present document, please send your comment to one of the following services:
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2018.
All rights reserved.
TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M logo is protected for the benefit of its Members.
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI
---------------------- Page: 2 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 2 ETSI TS 138 214 V15.2.0 (2018-07)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Foreword
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
---------------------- Page: 3 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 3 ETSI TS 138 214 V15.2.0 (2018-07)
Contents
Intellectual Property Rights . 2
Foreword . 2
Modal verbs terminology . 2
Foreword . 5
1 Scope . 6
2 References . 6
3 Definitions, symbols and abbreviations . 6
3.1 Definitions . 6
3.2 Symbols . 6
3.3 Abbreviations . 6
4 Power control . 7
4.1 Power allocation for downlink . 7
5 Physical downlink shared channel related procedures . 8
5.1 UE procedure for receiving the physical downlink shared channel . 8
5.1.1 Transmission schemes . 10
5.1.1.1 Transmission scheme 1 . 10
5.1.2 Resource allocation . 10
5.1.2.1 Resource allocation in time domain . 10
5.1.2.1.1 Determination of the resource allocation table to be used for PDSCH. 11
5.1.2.2 Resource allocation in frequency domain . 13
5.1.2.2.1 Downlink resource allocation type 0 . 14
5.1.2.2.2 Downlink resource allocation type 1 . 14
5.1.2.3 Physical resource block (PRB) bundling. 15
5.1.3 Modulation order, target code rate, redundancy version and transport block size determination . 16
5.1.3.1 Modulation order and target code rate determination . 16
5.1.3.2 Transport block size determination . 19
5.1.4 PDSCH resource mapping . 22
5.1.4.1 PDSCH resource mapping with RB symbol level granularity . 22
5.1.4.2 PDSCH resource mapping with RE level granularity . 23
5.1.5 Antenna ports quasi co-location. 24
5.1.6 UE procedure for receiving downlink reference signals . 25
5.1.6.1 CSI-RS reception procedure. 25
5.1.6.1.1 CSI-RS for tracking . 26
5.1.6.1.2 CSI-RS for L1-RSRP computation . 27
5.1.6.1.3 CSI-RS for mobility . 27
5.1.6.2 DM-RS reception procedure . 27
5.1.6.3 PT-RS reception procedure . 29
5.1.7 Code block group based PDSCH transmission . 31
5.1.7.1 UE procedure for grouping of code blocks to code block groups . 31
5.1.7.2 UE procedure for receiving code block group based transmissions . 31
5.2 UE procedure for reporting channel state information (CSI) . 31
5.2.1 Channel state information framework. 31
5.2.1.1 Reporting settings . 32
5.2.1.2 Resource settings . 32
5.2.1.3 (void) . 32
5.2.1.4 Reporting configurations . 32
5.2.1.4.1 Resource Setting configuration . 34
5.2.1.4.2 Report Quantity Configurations . 35
5.2.1.4.3 L1-RSRP Reporting . 36
5.2.1.5 Triggering/activation of CSI Reports and CSI-RS . 37
5.2.1.5.1 Aperiodic CSI Reporting/Aperiodic CSI-RS . 37
5.2.1.5.2 Semi-persistent CSI/Semi-persistent CSI-RS . 37
5.2.1.6 CSI processing criteria . 39
5.2.2 Channel state information . 39
ETSI
---------------------- Page: 4 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 4 ETSI TS 138 214 V15.2.0 (2018-07)
5.2.2.1 Channel quality indicator (CQI) . 39
5.2.2.1.1 CSI reference resource definition . 42
5.2.2.2 Precoding matrix indicator (PMI) . 43
5.2.2.2.1 Type I Single-Panel Codebook . 43
5.2.2.2.2 Type I Multi-Panel Codebook . 50
5.2.2.2.3 Type II Codebook . 54
5.2.2.2.4 Type II Port Selection Codebook . 60
5.2.2.3 Reference signal (CSI-RS) . 63
5.2.2.3.1 NZP CSI-RS . 63
5.2.2.4 Channel State Information – Interference Measurement (CSI-IM) . 64
5.2.3 CSI reporting using PUSCH . 64
5.2.4 CSI reporting using PUCCH . 66
5.2.5 Priority rules for CSI reports. 67
5.3 UE PDSCH processing procedure time . 67
5.4 UE CSI computation time . 68
6 Physical uplink shared channel related procedure . 69
6.1 UE procedure for transmitting the physical uplink shared channel . 69
6.1.1 Transmission schemes . 70
6.1.1.1 Codebook based UL transmission . 70
6.1.1.2 Non-Codebook based UL transmission . 70
6.1.2 Resource allocation . 71
6.1.2.1 Resource allocation in time domain . 71
6.1.2.1.1 Determination of the resource allocation table to be used for PUSCH. 72
6.1.2.2 Resource allocation in frequency domain . 74
6.1.2.2.1 Uplink resource allocation type 0 . 74
6.1.2.2.2 Uplink resource allocation type 1 . 75
6.1.2.3 Resource allocation for uplink transmission with configured grant . 75
6.1.3 UE procedure for applying transform precoding on PUSCH . 76
6.1.4 Modulation order, redundancy version and transport block size determination . 77
6.1.4.1 Modulation order and target code rate determination . 77
6.1.4.2 Transport block size determination . 80
6.1.5 Code block group based PUSCH transmission . 81
6.1.5.1 UE procedure for grouping of code blocks to code block groups . 81
6.1.5.2 UE procedure for transmitting code block group based transmissions . 81
6.2 UE reference symbol (RS) procedure . 82
6.2.1 UE sounding procedure . 82
6.2.1.1 UE SRS frequency hopping procedure . 84
6.2.1.2 UE sounding procedure for DL CSI acquisition . 85
6.2.1.3 UE sounding procedure between component carriers . 86
6.2.2 UE DM-RS transmission procedure . 87
6.2.3 UE PT-RS transmission procedure . 88
6.2.3.1 UE PT-RS transmission procedure when transform precoding is not enabled . 88
6.2.3.2 UE PT-RS transmission procedure when transform precoding is enabled . 90
6.3 UE PUSCH frequency hopping procedure . 91
6.4 UE PUSCH preparation procedure time . 92
Annex A (informative): Change history . 93
History . 94
ETSI
---------------------- Page: 5 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 5 ETSI TS 138 214 V15.2.0 (2018-07)
Foreword
This Technical Specification has been produced by the 3rd Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
ETSI
---------------------- Page: 6 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 6 ETSI TS 138 214 V15.2.0 (2018-07)
1 Scope
The present document specifies and establishes the characteristics of the physicals layer procedures of data channels for
5G-NR.
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present
document.
[1] 3GPP TR 21.905: "Vocabulary for 3GPP Specifications"
[2] 3GPP TS 38.201: " NR; Physical Layer – General Description"
[3] 3GPP TS 38.202: "NR; Services provided by the physical layer"
[4] 3GPP TS 38.211: "NR; Physical channels and modulation"
[5] 3GPP TS 38.212: "NR; Multiplexing and channel coding"
[6] 3GPP TS 38.213: "NR; Physical layer procedures for control"
[7] 3GPP TS 38.215: "NR; Physical layer measurements"
[8] 3GPP TS 38.101: "NR; User Equipment (UE) radio transmission and reception"
[9] 3GPP TS 38.104: "NR; Base Station (BS) radio transmission and reception"
[10] 3GPP TS 38.321: "NR; Medium Access Control (MAC) protocol specification"
[11] 3GPP TS 38.133: "NR; Requirements for support of radio resource management"
[12] 3GPP TS 38.331: "NR; Radio Resource Control (RRC); Protocol specification"
[13] 3GPP TS 38.306: "NR; User Equipment (UE) radio access capabilities"
[14] 3GPP TS 38.423: "NG-RAN; Xn signalling transport"
3 Definitions, symbols and abbreviations
3.1 Definitions
For the purposes of the present document, the terms and definitions given in TR 21.905 [1] and the following apply. A
term defined in the present document takes precedence over the definition of the same term, if any, in TR 21.905 [1].
3.2 Symbols
For the purposes of the present document, the following symbols apply:
3.3 Abbreviations
For the purposes of the present document, the abbreviations given in TR 21.905 [1] and the following apply. An
abbreviation defined in the present document takes precedence over the definition of the same abbreviation, if any, in
TR 21.905 [1].
BWP Bandwidth part
CBG Code block group
CP Cyclic prefix
ETSI
---------------------- Page: 7 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 7 ETSI TS 138 214 V15.2.0 (2018-07)
CQI Channel quality indicator
CPU CSI processing unit
CRC Cyclic redundancy check
CRI CSI-RS Resource Indicator
CSI Channel state information
CSI-RS Channel state information reference signal
CSI-RSRP CSI reference signal received power
CSI-RSRQ CSI reference signal received quality
CSI-SINR CSI signal-to-noise and interference ratio
CW Codeword
DCI Downlink control information
DL Downlink
DM-RS Dedicated demodulation reference signals
EPRE Energy per resource element
L1-RSRP Layer 1 reference signal received power
LI Layer Indicator
MCS Modulation and coding scheme
PDCCH Physical downlink control channel
PDSCH Physical downlink shared channel
PSS Primary Synchronisation signal
PUCCH Physical uplink control channel
QCL Quasi co-location
PMI Precoding Matrix Indicator
PRB Physical resource block
PRG Physical resource block group
PT-RS Phase-tracking reference signal
RB Resource block
RBG Resource block group
RI Rank Indicator
RIV Resource indicator value
SLIV Start and length indicator value
SR Scheduling Request
SRS Sounding reference signal
SS Synchronisation signal
SSS Secondary Synchronisation signal
SS-RSRP SS reference signal received power
SS-RSRQ SS reference signal received quality
SS-SINR SS signal-to-noise and interference ratio
TCI Transmission Configuration Indicator
TDM Time division multiplexing
UE User equipment
UL Uplink
4 Power control
4.1 Power allocation for downlink
The gNodeB determines the downlink transmit EPRE.
For the purpose of SS-RSRP, SS-RSRQ and SS-SINR measurements, the UE may assume downlink EPRE is constant
across the bandwidth. For the purpose of SS-RSRP, SS-RSRQ and SS-SINR measurements, the UE may assume
downlink EPRE is constant over SSS carried in different SS/PBCH blocks. For the purpose of SS-RSRP, SS-RSRQ and
SS-SINR measurements, the UE may assume that the ratio of SSS EPRE to PBCH DM-RS EPRE is 0 dB.
For the purpose of CSI-RSRP, CSI-RSRQ and CSI-SINR measurements, the UE may assume downlink EPRE of a port
of CSI-RS resource configuration is constant across the configured downlink bandwidth and constant across all
configured OFDM symbols.
The downlink SS/PBCH SSS EPRE can be derived from the SS/PBCH downlink transmit power given by the parameter
SS-PBCH-BlockPower provided by higher layers. The downlink SSS transmit power is defined as the linear average
ETSI
---------------------- Page: 8 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 8 ETSI TS 138 214 V15.2.0 (2018-07)
over the power contributions (in [W]) of all resource elements that carry the SSS within the operating system
bandwidth.
The downlink CSI-RS EPRE can be derived from the SS/PBCH block downlink transmit power given by the parameter
SS-PBCH-BlockPower and CSI-RS power offset given by the parameter powerControlOffsetSS provided by higher
layers. The downlink reference-signal transmit power is defined as the linear average over the power contributions (in
[W]) of the resource elements that carry the configured CSI-RS within the operating system bandwidth.
For downlink DM-RS associated with PDSCH, the UE may assume the ratio of PDSCH EPRE to DM-RS EPRE (1/
β [dB]) is given by Table 4.1-1 according to the number of DM-RS CDM groups without data as described in
DMRS
DMRS
β
Subclause 5.1.6.2. The DM-RS scaling factor specified in Subclause 7.4.1.1.2 of [4, TS 38.211] is given by
PDSCH
β
DMRS
−
DMRS
20
β = 10 .
PDSCH
Table 4.1-1: The ratio of PDSCH EPRE to DM-RS EPRE
Number of DM-RS CDM DM-RS configuration type 1 DM-RS configuration type 2
groups without data
1 0 dB 0 dB
2 -3 dB -3 dB
3 - -4.77 dB
When the UE is scheduled with PT-RS ports associated with the PDSCH and when the PT-RS port is associated to
PTRS
n DM-RS ports,
DMRS
- if the UE is configured with the higher layer parameter epre-Ratio, the ratio of PT-RS EPRE to PDSCH EPRE
per layer per RE for PT-RS port ( ρ ) is given by Table 4.1-2 according to the epre-Ratio, the PT-RS scaling
PTRS
ρ
PTRS
−
20
factor β specified in subclause 7.4.1.2.2 of [4, TS 38.211] is given by β = 10 .
PTRS PTRS
- otherwise, the UE shall assume epre-Ratio is set to state '0' in Table 4.1-2 if not configured.
Table 4.1-2: PT-RS EPRE to PDSCH EPRE per layer per RE (α )
PTRS
The number of PDSCH layers
epre-Ratio
1 2 3 4 5 6
0 0 3 4.77 6 7 7.78
1 0 0 0 0 0 0
2 reserved
3 reserved
The downlink PDCCH EPRE is assumed as the ratio of the PDCCH EPRE to NZP CSI-RS EPRE and takes the value of
0 dB.
5 Physical downlink shared channel related procedures
5.1 UE procedure for receiving the physical downlink shared
channel
For downlink, a maximum of 16 HARQ processes per cell is supported by the UE. The number of processes the UE
may assume will at most be used for the downlink is configured to the UE for each cell separately by higher layer
parameter nrofHARQ-processesForPDSCH, and when no configuration is provided the UE may assume a default
number of 8 processes.
A UE shall upon detection of a PDCCH with a configured DCI format 1_0 or 1_1 decode the corresponding PDSCHs
as indicated by that DCI. The UE is not expected to receive another PDSCH for a given HARQ process until after the
end of the expected transmission of HARQ-ACK for that HARQ process, where the timing is given by Subclause 9.2.3
of [6]. The UE is not expected to receive a PDSCH in slot i, with the corresponding HARQ-ACK assigned to be
ETSI
---------------------- Page: 9 ----------------------
3GPP TS 38.214 version 15.2.0 Release 15 9 ETSI TS 138 214 V15.2.0 (2018-07)
transmitted in slot j, and another PDSCH in slot after slot i with its corresponding HARQ-ACK assigned to be
transmitted in a slot before slot j. For any two HARQ process IDs in a given cell, if the UE is scheduled to start
receiving a PDSCH in symbol j by a PDCCH starting in symbol i, the UE is not expected to be scheduled to receive a
PDSCH starting earlier than symbol j with a PDCCH starting later than symbol i.
If the UE has received no SSB-transmitted through higher layer signalling about SS/PBCH block transmissions in the
serving cell, the UE assumes SS/PBCH block transmission according to SSB-transmitted-SIB1, and if the PDSCH
resource allocation overlaps with PRBs containing SS/PBCH block transmission resources the UE shall assume that
PRBs containing SS/PBCH block are not available for PDSCH in the OFDM symbols where SS/PBCH block is
transmitted. The UE assumes the periodicity of the SS/PBCH block transmission resources based on SSB-periodicity-
serving-cell.
If the UE has received a SSB-transmitted through higher layer signalling about SS/PBCH block transmissions in the
ser
...