ETSI TS 136 213 V14.7.0 (2018-10)

LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (3GPP TS 36.213 version 14.7.0 Release 14)

ETSI TS 136 213 V14.7.0 (2018-10)

Name:ETSI TS 136 213 V14.7.0 (2018-10)   Standard name:LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (3GPP TS 36.213 version 14.7.0 Release 14)
Standard number:ETSI TS 136 213 V14.7.0 (2018-10)   language:English language
Release Date:15-Oct-2018   technical committee:3GPP RAN 1 - Radio layer 1 specification
Drafting committee:   ICS number:
ETSI TS 136 213 V14.7.0 (2018-10)






TECHNICAL SPECIFICATION
LTE;
Evolved Universal Terrestrial Radio Access (E-UTRA);
Physical layer procedures
(3GPP TS 36.213 version 14.7.0 Release 14)

---------------------- Page: 1 ----------------------
3GPP TS 36.213 version 14.7.0 Release 14 1 ETSI TS 136 213 V14.7.0 (2018-10)



Reference
RTS/TSGR-0136213ve70
Keywords
LTE
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at

If you find errors in the present document, please send your comment to one of the following services:

Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2018.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M logo is protected for the benefit of its Members.

GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 36.213 version 14.7.0 Release 14 2 ETSI TS 136 213 V14.7.0 (2018-10)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to the present document may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Foreword
rd
This Technical Specification (TS) has been produced by the ETSI 3 Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 36.213 version 14.7.0 Release 14 3 ETSI TS 136 213 V14.7.0 (2018-10)
Contents
Intellectual Property Rights . 2
Foreword . 2
Modal verbs terminology . 2
Foreword . 8
1 Scope . 9
2 References . 9
3 Symbols and abbreviations . 9
3.1 Symbols . 9
3.2 Abbreviations . 10
4 Synchronization procedures . 12
4.1 Cell search . 12
4.2 Timing synchronization . 12
4.2.1 Radio link monitoring . 12
4.2.2 Inter-cell synchronization . 12
4.2.3 Transmission timing adjustments . 12
4.3 Timing for Secondary Cell Activation / Deactivation . 13
5 Power control . 14
5.1 Uplink power control. 14
5.1.1 Physical uplink shared channel . 14
5.1.1.1 UE behaviour . 14
5.1.1.2 Power headroom . 23
5.1.2 Physical uplink control channel . 26
5.1.2.1 UE behaviour . 27
5.1.3 Sounding Reference Symbol (SRS) . 31
5.1.3.1 UE behaviour . 31
5.1.3.2 Power headroom for Type3 report . 33
5.1.4 Power allocation for dual connectivity . 33
5.1.4.1 Dual connectivity power control Mode 1 . 34
5.1.4.2 Dual connectivity power control Mode 2 . 41
5.1.5 Power allocation for PUCCH-SCell . 46
5.2 Downlink power allocation . 46
5.2.1 eNodeB Relative Narrowband TX Power (RNTP) restrictions . 48
6 Random access procedure . 50
6.1 Physical non-synchronized random access procedure . 50
6.1.1 Timing . 51
6.2 Random Access Response Grant . 52
7 Physical downlink shared channel related procedures . 55
7.1 UE procedure for receiving the physical downlink shared channel . 57
7.1.1 Single-antenna port scheme . 67
7.1.2 Transmit diversity scheme . 68
7.1.3 Large delay CDD scheme . 68
7.1.4 Closed-loop spatial multiplexing scheme . 68
7.1.5 Multi-user MIMO scheme . 68
7.1.5A Dual layer scheme . 68
7.1.5B Up to 8 layer transmission scheme . 68
7.1.6 Resource allocation . 68
7.1.6.1 Resource allocation type 0 . 70
7.1.6.2 Resource allocation type 1 . 71
7.1.6.3 Resource allocation type 2 . 72
7.1.6.4 PDSCH starting position . 73
7.1.6.4A PDSCH starting position for BL/CE UEs . 75
7.1.6.5 Physical Resource Block (PRB) bundling. 75
ETSI

---------------------- Page: 4 ----------------------
3GPP TS 36.213 version 14.7.0 Release 14 4 ETSI TS 136 213 V14.7.0 (2018-10)
7.1.7 Modulation order and transport block size determination . 77
7.1.7.1 Modulation order and redundancy version determination . 78
7.1.7.2 Transport block size determination . 82
7.1.7.2.1 Transport blocks not mapped to two or more layer spatial multiplexing . 83
7.1.7.2.2 Transport blocks mapped to two-layer spatial multiplexing . 91
7.1.7.2.3 Transport blocks mapped for DCI Format 1C and DCI Format 6-2 . 91
7.1.7.2.4 Transport blocks mapped to three-layer spatial multiplexing . 92
7.1.7.2.5 Transport blocks mapped to four-layer spatial multiplexing . 93
7.1.7.2.6 Transport blocks mapped for BL/CE UEs configured with CEModeB and PDSCH bandwidth
up to 1.4MHz . 93
7.1.7.2.7 Transport blocks mapped for BL/CE UEs SystemInformationBlockType1-BR . 94
7.1.7.2.8 Transport blocks mapped for UEs configured with ce-pdsch-maxBandwidth-config value of 5
MHz or with pdsch-MaxBandwidth-SC-MTCH value of 24 PRBs . 94
7.1.7.3 Redundancy Version determination for Format 1C . 94
7.1.8 Storing soft channel bits . 95
7.1.9 PDSCH resource mapping parameters . 95
7.1.10 Antenna ports quasi co-location for PDSCH . 96
7.1.11 PDSCH subframe assignment for BL/CE UE . 97
7.2 UE procedure for reporting Channel State Information (CSI) . 99
7.2.1 Aperiodic CSI Reporting using PUSCH . 107
7.2.2 Periodic CSI Reporting using PUCCH . 131
7.2.3 Channel Quality Indicator (CQI) definition . 171
7.2.4 Precoding Matrix Indicator (PMI) definition . 181
7.2.5 Channel-State Information – Reference Signal (CSI-RS) definition . 209
7.2.6 Channel-State Information – Interference Measurement (CSI-IM) Resource definition . 211
7.2.7 Zero Power CSI-RS Resource definition . 211
7.2.8 CSI-RS Activation / Deactivation . 211
7.3 UE procedure for reporting HARQ-ACK . 212
7.3.1 FDD HARQ-ACK reporting procedure . 212
7.3.2 TDD HARQ-ACK reporting procedure . 216
7.3.2.1 TDD HARQ-ACK reporting procedure for same UL/DL configuration . 216
7.3.2.2 TDD HARQ-ACK reporting procedure for different UL/DL configurations . 228
7.3.3 FDD-TDD HARQ-ACK reporting procedure for primary cell frame structure type 1 . 235
7.3.4 FDD-TDD HARQ-ACK reporting procedure for primary cell frame structure type 2 . 236
8 Physical uplink shared channel related procedures . 237
8.0 UE procedure for transmitting the physical uplink shared channel . 237
8.0.1 Single-antenna port scheme . 251
8.0.2 Closed-loop spatial multiplexing scheme . 251
8.1 Resource allocation for PDCCH/EPDCCH with uplink DCI format . 252
8.1.1 Uplink resource allocation type 0 . 252
8.1.2 Uplink resource allocation type 1 . 252
8.1.3 Uplink resource allocation type 2 . 253
8.1.4 Uplink resource allocation type 3 . 253
8.1.5 Uplink resource allocation type 4 . 254
8.1.5.1 UL Resource Block Groups . 254
8.2 UE sounding procedure . 255
8.3 UE HARQ-ACK procedure . 265
8.4 UE PUSCH hopping procedure . 267
8.4.1 Type 1 PUSCH hopping . 268
8.4.2 Type 2 PUSCH hopping . 268
8.5 UE Reference Symbol (RS) procedure . 268
8.6 Modulation order, redundancy version and transport block size determination . 269
8.6.1 Modulation order and redundancy version determination . 269
8.6.2 Transport block size determination . 275
8.6.3 Control information MCS offset determination . 278
8.7 UE transmit antenna selection . 282
8.8 Transmission timing adjustments . 282
9 Physical downlink control channel procedures . 282
9.1 UE procedure for determining physical downlink control channel assignment . 283
9.1.1 PDCCH assignment procedure . 283
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 36.213 version 14.7.0 Release 14 5 ETSI TS 136 213 V14.7.0 (2018-10)
9.1.2 PHICH assignment procedure. 287
9.1.3 Control Format Indicator (CFI) assignment procedure . 289
9.1.4 EPDCCH assignment procedure . 289
9.1.4.1 EPDCCH starting position . 296
9.1.4.2 Antenna ports quasi co-location for EPDCCH . 297
9.1.4.3 Resource mapping parameters for EPDCCH . 297
9.1.4.4 PRB-pair indication for EPDCCH . 298
9.1.5 MPDCCH assignment procedure . 298
9.1.5.1 MPDCCH starting position . 305
9.1.5.2 Antenna ports quasi co-location for MPDCCH . 305
9.2 PDCCH/EPDCCH/MPDCCH validation for semi-persistent scheduling . 306
9.3 PDCCH/EPDCCH/MPDCCH control information procedure . 307
10 Physical uplink control channel procedures . 308
10.1 UE procedure for determining physical uplink control channel assignment . 308
10.1.1 PUCCH format information . 311
10.1.2 FDD HARQ-ACK feedback procedures . 316
10.1.2.1 FDD HARQ-ACK procedure for one configured serving cell . 316
10.1.2.2 FDD HARQ-ACK procedures for more than one configured serving cell . 318
10.1.2.2.1 PUCCH format 1b with channel selection HARQ-ACK procedure . 318
10.1.2.2.2 PUCCH format 3 HARQ-ACK procedure . 322
10.1.2.2.3 PUCCH format 4 HARQ-ACK procedure . 324
10.1.2.2.4 PUCCH format 5 HARQ-ACK procedure . 325
10.1.3 TDD HARQ-ACK feedback procedures . 326
10.1.3.1 TDD HARQ-ACK procedure for one configured serving cell . 328
10.1.3.2 TDD HARQ-ACK procedure for more than one configured serving cell . 340
10.1.3.2.1 PUCCH format 1b with channel selection HARQ-ACK procedure . 340
10.1.3.2.2 PUCCH format 3 HARQ-ACK procedure . 356
10.1.3.2.3 PUCCH format 4 HARQ-ACK procedure . 363
10.1.3.2.4 PUCCH format 5 HARQ-ACK procedure . 380
10.1.3A FDD-TDD HARQ-ACK feedback procedures for primary cell frame structure type 2 . 380
10.1.4 HARQ-ACK Repetition procedure . 382
10.1.5 Scheduling Request (SR) procedure . 383
10.2 Uplink HARQ-ACK timing . 384
11 Physical Multicast Channel (PMCH) related procedures . 388
11.1 UE procedure for receiving the PMCH . 388
11.2 UE procedure for receiving MCCH and system information change notification. 388
12 Assumptions independent of physical channel. 388
13 Uplink/Downlink configuration determination procedure for Frame Structure Type 2 . 389
13.1 UE procedure for determining eIMTA-uplink/downlink configuration . 389
13A Subframe configuration for Frame Structure Type 3 . 390
14 UE procedures related to Sidelink . 394
14.1 Physical Sidelink Shared Channel related procedures . 395
14.1.1 UE procedure for transmitting the PSSCH . 395
14.1.1.1 UE procedure for determining subframes for transmitting PSSCH for sidelink transmission mode
1 . 396
14.1.1.1.1 Determination of subframe indicator bitmap . 397
14.1.1.2 UE procedure for determining resource blocks for transmitting PSSCH for sidelink transmission
mode 1 . 399
14.1.1.2.1 PSSCH resource allocation for sidelink transmission mode 1 . 399
14.1.1.2.2 PSSCH frequency hopping for sidelink transmission mode 1 . 400
14.1.1.3 UE procedure for determining subframes for transmitting PSSCH for sidelink transmission mode
2 . 400
14.1.1.4 UE procedure for determining resource blocks for transmitting PSSCH for sidelink transmission
mode 2 . 401
14.1.1.4A UE procedure for determining subframes and resource blocks for transmitting PSSCH for
sidelink transmission mode 3 . 401
14.1.1.4B UE procedure for determining subframes and resource blocks for transmitting PSSCH and
reserving resources for sidelink transmission mode 4 . 402
ETSI

---------------------- Page: 6 ----------------------
3GPP TS 36.213 version 14.7.0 Release 14 6 ETSI TS 136 213 V14.7.0 (2018-10)
14.1.1.4C UE procedure for determining subframes and resource blocks for PSSCH transmission
associated with an SCI format 1 .
...

  • Relates Information
  • IEC 60300-3-7:1999

    IEC 60300-3-7:1999 - Dependability management - Part 3-7: Application guide - Reliability stress screening of electronic hardware Released:5/31/1999 Isbn:2831847974
    09-20
  • HD 571 S1:1990

    HD 571 S1:1998
    09-20
  • ISO 8130-4:1992

    ISO 8130-4:1992 - Coating powders
    09-20
  • HD 478.2.7 S1:1990

    HD 478.2.7 S1:2003
    09-19
  • ISO 8473:1988/Cor 1:1992

    ISO 8473:1988/Cor 1:1992 - Information processing systems — Data communications — Protocol for providing the connectionless-mode network service — Technical Corrigendum 1 Released:12/10/1992
    09-19
  • EN ISO 9013:2017/prA1

    EN ISO 9013:2017/oprA1:2024
    09-19
  • IEC 60118-6:1999

    IEC 60118-6:1999 - Hearing aids - Part 6: Characteristics of electrical input circuits for hearing aids Released:6/9/1999 Isbn:2831848075
    09-19
  • HD 280.3 S1:1990

    HD 280.3 S1:1999
    09-19
  • ISO 9832:1992

    ISO 9832:1992 - Animal and vegetable fats and oils -- Determination of residual technical hexane content
    09-19
  • EN 60188:1988/A1:1990

    EN 60188:1999/A1:1999
    09-18