|
TECHNICAL SPECIFICATION
Digital cellular telecommunications system (Phase 2+) (GSM);
Universal Mobile Telecommunications System (UMTS);
LTE;
Policy and charging control signalling flows
and Quality of Service (QoS) parameter mapping
(3GPP TS 29.213 version 8.19.0 Release 8)
---------------------- Page: 1 ----------------------
3GPP TS 29.213 version 8.19.0 Release 8 1 ETSI TS 129 213 V8.19.0 (2019-01)
Reference
RTS/TSGC-0329213v8j0
Keywords
GSM,LTE,UMTS
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
If you find errors in the present document, please send your comment to one of the following services:
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2019.
All rights reserved.
TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI
---------------------- Page: 2 ----------------------
3GPP TS 29.213 version 8.19.0 Release 8 2 ETSI TS 129 213 V8.19.0 (2019-01)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Foreword
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
---------------------- Page: 3 ----------------------
3GPP TS 29.213 version 8.19.0 Release 8 3 ETSI TS 129 213 V8.19.0 (2019-01)
Contents
Intellectual Property Rights . 2
Foreword . 2
Modal verbs terminology . 2
Foreword . 6
1 Scope . 7
2 References . 7
3 Definitions and abbreviations . 8
3.1 Definitions . 8
3.2 Abbreviations . 8
4 Signalling Flows over Gx, Gxx, Rx and S9 . 9
4.0 General . 9
4.1 IP-CAN Session Establishment . 9
4.2 IP-CAN Session Termination . 12
4.2.1 UE-Initiated . 12
4.2.1.1 AF located in the HPLMN . 12
4.2.1.2 AF located in the VPLMN . 14
4.2.2 PCEF-Initiated . 16
4.2.2.1 AF located in the HPLMN . 16
4.2.2.2 AF located in the VPLMN . 18
4.2.3 PCRF-Initiated . 19
4.2.3.1 AF located in the HPLMN . 19
4.2.3.2 AF located in the VPLMN . 21
4.3 IP-CAN Session Modification . 23
4.3.1 Network-Initiated IP-CAN Session Modification . 23
4.3.1.1 Interactions between BBERF, PCEF and PCRF(PCC/QoS Rule Provisioning in PUSH mode) . 23
4.3.1.2 Interactions between PCRF, AF and SPR . 26
4.3.1.2.1 AF Session Establishment . 26
4.3.1.2.1.1 AF located in HPLMN . 26
4.3.1.2.1.2 AF located in VPLMN . 27
4.3.1.2.2 AF session modification . 28
4.3.1.2.2.1 AF located in the HPLMN. 28
4.3.1.2.2.2 AF located in the VPLMN. 29
4.3.1.2.3 AF session termination . 30
4.3.1.2.3.1 AF located in the HPLMN. 30
4.3.1.2.3.2 AF located in the VPLMN. 31
4.3.2 PCEF -Initiated IP-CAN Session Modification (PCC Rule Provisioning in PULL Mode) . 31
4.3.2.1 PCEF-initiated IP-CAN Session Modification, AF located in HPLMN. . 31
4.3.2.2 PCEF-initiated IP-CAN Session Modification, AF located in the VPLMN . 34
4.4 Gateway Control Session Procedures . 35
4.4.1 Gateway Control Session Establishment . 36
4.4.2 Gateway Control and QoS Rules Request . 40
4.4.2.1 Non-Roaming and Home Routed cases . 40
4.4.2.2 Visited access cases. 42
4.4.3 Gateway Control and QoS Rules Provision . 43
4.4.4 Gateway Control Session Termination . 44
4.4.4.1 BBERF-Initiated Gateway Control Session Termination . 44
4.4.4.2 PCRF-Initiated Gateway Control Session Termination . 46
4.5 Multiple BBERF Signalling Flows . 47
4.5.1 Non-Roaming and Home Routed cases . 47
4.5.1.1 New Gateway Control Session Establishment . 47
4.5.1.2 PCEF IP-CAN session modification - Handover . 49
4.5.2 Visited access case . 51
4.5.2.1 New Gateway Control Session Establishment . 51
4.5.2.2 PCEF-Initiated IP-CAN session modification-Handover. 53
ETSI
---------------------- Page: 4 ----------------------
3GPP TS 29.213 version 8.19.0 Release 8 4 ETSI TS 129 213 V8.19.0 (2019-01)
5 Binding Mechanism . 55
5.1 Overview . 55
5.2 Session Binding . 55
5.3 PCC Rule Authorization and QoS Rule Generation . 56
5.4 Bearer Binding . 56
6 QoS Parameters Mapping . . 57
6.1 Overview . 57
6.1.1 UE-Initiated IP-CAN bearers . 58
6.1.2 Network-Initiated IP-CAN bearers . 60
6.2 QoS parameter mapping Functions at AF . 61
6.3 QoS parameter mapping Functions at PCRF . 69
6.4 QoS parameter mapping Functions at PCEF . 77
6.4.1 GPRS . 77
6.4.1.1 Authorized IP QoS parameters per PDP Context to Authorized UMTS QoS parameters mapping
in GGSN . 77
6.4.1.2 Comparing UMTS QoS Parameters against the Authorized UMTS QoS parameters in GGSN for
UE initiated PDP context . 78
6.4.2 3GPP- EPS . 79
6.4.2.1 Authorized IP QoS parameters per PDP Context to Authorized UMTS QoS parameters mapping
in P-GW. . 79
6.4.2.2 Comparing UMTS QoS Parameters against the Authorized UMTS QoS parameters in P-GW for
UE initiated PDP context . 81
6.5 QoS parameter mapping Functions at UE for a UE-initiated GPRS PDP Context . 81
6.5.1 SDP to UMTS QoS parameter mapping in UE . 83
6.5.2 SDP parameters to Authorized UMTS QoS parameters mapping in UE . 83
7 PCRF addressing . 89
7.1 General . 89
7.2 DRA Definition . 89
7.3 DRA Procedures . 89
7.3.1 General . 89
7.3.2 DRA Information Storage . 89
7.3.3 Capabilities Exchange . 90
7.3.4 Redirect DRA . 90
7.3.4.1 Redirecting Diameter Requests . 90
7.3.4.2 DRA binding removal . 90
7.3.5 Proxy DRA . 90
7.3.6 PCRF selection by BBERF/PCEF (non-roaming case) . 91
7.3.7 PCRF selection by AF . 91
7.3.8 PCRF selection in a roaming scenario . 91
7.4 DRA flows. 92
7.4.1 Proxy DRA . 92
7.4.1.1 Establishment of Diameter Sessions . 92
7.4.1.1.1 Non-roaming cases . 92
7.4.1.1.2 Roaming cases . 93
7.4.1.2 Modification of Diameter Sessions . 94
7.4.1.2.1 Non-roaming cases . 94
7.4.1.2.1.1 Client-initiated . 94
7.4.1.2.1.2 PCRF-initiated . 95
7.4.1.2.2 Roaming cases . 96
7.4.1.2.2.1 V-PCRF initiated . 96
7.4.1.2.2.2 H-PCRF initiated . 97
7.4.1.3 Termination of Diameter Sessions . 98
7.4.1.3.1 Non-roaming cases . 98
7.4.1.3.2 Roaming cases . 99
7.4.2 Redirect DRA . 100
7.4.2.1 Establishment of Diameter Sessions . 100
7.4.2.1.1 Non-roaming cases . 100
7.4.2.1.2 Roaming cases . 101
7.4.2.2 Modification of Diameter sessions . 102
7.4.2.3 Termination of Diameter Sessions . 102
ETSI
---------------------- Page: 5 ----------------------
3GPP TS 29.213 version 8.19.0 Release 8 5 ETSI TS 129 213 V8.19.0 (2019-01)
7.4.2.3.1 Non-roaming cases . 102
7.4.2.3.2 Roaming cases . 103
Annex A (informative): Examples of deriving the Maximum Authorized parameters from the
SDP parameters . 105
Annex B (normative): Signalling Flows for IMS . 106
B.1 Subscription to Notification of Signalling Path Status at IMS Registration . 107
B.1a Subscription to Notification of Change of IP-CAN Type at IMS Registration . 107
B.2 IMS Session Establishment . 108
B.2.1 Provisioning of service information at Originating P-CSCF and PCRF . 108
B.2.2 Provisioning of service information at terminating P-CSCF and PCRF . 110
B.3 IMS Session Modification . 113
B.3.1 Provisioning of service information . 113
B.3.2 Enabling of IP Flows . 116
B.3.3 Disabling of IP Flows . 117
B.3.4 Media Component Removal . 118
B.4 IMS Session Termination . 119
B.4.1 Mobile initiated session release / Network initiated session release . 119
B.4.2 IP-CAN Bearer Release/Loss . 120
Annex C (normative): NAT Related Procedures . 121
C.1 Support for media traversal of NATs using ICE . 121
C.2 P-CSCF procedures . 121
C.2.1 General . 121
C.2.2 Deriving the UEs IP address. 121
C.2.3 Deriving flow descriptions . 122
C.2.4 Gating control . 122
C.2.5 Bandwidth impacts . 122
C.3 PCRF procedures . 122
C.3.1 General . 122
C.3.2 Deriving additional flow descriptions . 123
C.3.3 Gating control . 123
C.3.4 Bandwidth impacts . 123
Annex D (normative): Access specific procedures for GPRS . 124
D.1 General . 124
D.2 Binding Mechanisms . 124
D.3 PCC Procedures . 124
D.3.1 IP-CAN Session Modification . 124
D.3.1.1 Network-initiated IP-CAN Session Modification . 124
D.3.1.2 PCEF-initiated IP-CAN Session Modification . 125
D.3.1.2.1 UE-initiated IP-CAN Bearer Establishment or IP-CAN Bearer Modification . 125
D.3.1.2.2 UE-initiated IP-CAN Bearer Termination . 128
Annex E (informative): Change history . 131
History . 135
ETSI
---------------------- Page: 6 ----------------------
3GPP TS 29.213 version 8.19.0 Release 8 6 ETSI TS 129 213 V8.19.0 (2019-01)
Foreword
rd
This Technical Specification has been produced by the 3 Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
ETSI
---------------------- Page: 7 -----
...