ETSI TS 132 425 V15.2.0 (2019-04)

LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Universal Terrestrial Radio Access Network (E-UTRAN) (3GPP TS 32.425 version 15.2.0 Release 15)

ETSI TS 132 425 V15.2.0 (2019-04)

Name:ETSI TS 132 425 V15.2.0 (2019-04)   Standard name:LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Universal Terrestrial Radio Access Network (E-UTRAN) (3GPP TS 32.425 version 15.2.0 Release 15)
Standard number:ETSI TS 132 425 V15.2.0 (2019-04)   language:English language
Release Date:16-Apr-2019   technical committee:3GPP SA 5 - Telecom Management
Drafting committee:   ICS number:
ETSI TS 132 425 V15.2.0 (2019-04)






TECHNICAL SPECIFICATION
LTE;
Telecommunication management;
Performance Management (PM);
Performance measurements Evolved Universal Terrestrial
Radio Access Network (E-UTRAN)
(3GPP TS 32.425 version 15.2.0 Release 15)

---------------------- Page: 1 ----------------------
3GPP TS 32.425 version 15.2.0 Release 15 1 ETSI TS 132 425 V15.2.0 (2019-04)



Reference
RTS/TSGS-0532425vf20
Keywords
LTE
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:

The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at

If you find errors in the present document, please send your comment to one of the following services:

Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2019.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.

GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 32.425 version 15.2.0 Release 15 2 ETSI TS 132 425 V15.2.0 (2019-04)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Foreword
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or
GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables.
The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under
.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 32.425 version 15.2.0 Release 15 3 ETSI TS 132 425 V15.2.0 (2019-04)
Contents
Intellectual Property Rights . 2
Foreword . 2
Modal verbs terminology . 2
Foreword . 8
1 Scope . 10
2 References . 10
3 Measurement family and abbreviations. 11
3.1 Measurement family . 11
3.2 Abbreviations . 12
4 Measurements related to eNodeB, Donor eNodeB and Relay Node . 13
4.0 Applicability of measurements . 13
4.1 RRC connection related measurements . 13
4.1.1 RRC connection establishment . 13
4.1.1.0 General . 13
4.1.1.1 Attempted RRC connection establishments . 13
4.1.1.2 Successful RRC connection establishments . 14
4.1.1.3 Failed RRC connection establishments . 14
4.1.1.4 Failed RRC connection establishment per failure cause . 14
4.1.2 RRC connection re-establishment . 15
4.1.2.0 General . 15
4.1.2.1 Attempted RRC connection re-establishments . 15
4.1.2.2 Successful RRC connection re-establishments . 15
4.1.2.3 Failed RRC connection re-establishments . 16
4.1.3 RRC connection number . 16
4.1.3.1 Mean number of RRC Connections . 16
4.1.3.2 Maximum number of RRC Connections . 17
4.1.4 RRC connection setup time . 17
4.1.4.1 Mean RRC connection setup time . 17
4.1.4.2 Maximum RRC connection setup time . 17
4.1.5 UE CONTEXT Release . 18
4.1.5.1 Number of UE CONTEXT Release Request initiated by eNodeB/RN . 18
4.1.5.2 Successful UE CONTEXT Release . 18
4.1.6 Inactivity timer . 19
4.1.6.1 Number of successful RRC connection setups in relation to the time between successful RRC
connection setup and last RRC connection release . 19
4.2 E-RAB related measurements . 19
4.2.0 General . 19
4.2.1 E-RAB setup . 19
4.2.1.1 Number of initial E-RABs attempted to setup . 19
4.2.1.2 Number of initial E-RABs successfully established . 20
4.2.1.3 Number of initial E-RABs failed to setup . 20
4.2.1.4 Number of additional E-RABs attempted to setup . 20
4.2.1.5 Number of additional E-RABs successfully established . 21
4.2.1.6 Number of additional E-RABs failed to setup . 21
4.2.1.7 Mean E-RAB Setup time . 22
4.2.1.8 Maximum E-RAB Setup time . 22
4.2.1.9 Number of E-RABs attempted to establish for incoming HOs . 22
4.2.1.10 Number of E-RABs successfully established for incoming HOs . 23
4.2.2 E-RAB release . 23
4.2.2.1 Number of E-RABs requested to release initiated by eNodeB/RN per QCI . 23
4.2.2.3 Number of E-RABs attempted to release . 24
4.2.2.4 Number of E-RAB successfully released . 25
4.2.2.5 Number of E-RAB failed to release . 25
4.2.2.6 Number of released active E-RABs . 26
ETSI

---------------------- Page: 4 ----------------------
3GPP TS 32.425 version 15.2.0 Release 15 4 ETSI TS 132 425 V15.2.0 (2019-04)
4.2.3 E-RAB modification . 27
4.2.3.1 Number of E-RABs attempted to modify the QoS parameter . 27
4.2.3.2 Number of E-RABs successfully modified the QoS parameter . 27
4.2.3.3 Number of E-RABs failed to modify the QoS parameter . 27
4.2.4 E-RAB activity . 28
4.2.4.1 In-session activity time for UE. 28
4.2.4.2 In-session activity time for E-RABs . 28
4.2.5 E-RAB number . 29
4.2.5.1 Average Number of simultaneous E-RABs. . 29
4.2.5.2 Maximum Number of simultaneous E-RABs. . 29
4.3 Handover related measurements . 30
4.3.1 Intra-RAT Handovers . 30
4.3.1.1 Intra-eNB/RN Handover related measurements . 30
4.3.1.1.1 Attempted outgoing intra-eNB/RN handovers per handover cause . 30
4.3.1.1.2 Successful outgoing intra-eNB/RN handovers per handover cause . 30
4.3.1.1.3 Attempted outgoing intra-DeNB handover preparations from DeNB cell to RN per handover
cause . 31
4.3.1.1.4 Attempted outgoing intra-DeNB handover executions from DeNB cell to RN per handover
cause . 31
4.3.1.1.5 Successful outgoing intra-DeNB handover executions from DeNB cell to RN per handover
cause . 32
4.3.1.2 Inter-eNB Handover related measurements . 32
4.3.1.2.1 Attempted outgoing inter-eNB handover preparations . 32
4.3.1.2.2 Attempted outgoing inter-eNB handover executions per handover cause . 32
4.3.1.2.3 Successful outgoing inter-eNB handover executions per handover cause . 33
4.3.1.3 Handover measurements on neighbour cell basis . 33
4.3.1.3.1 Attempted outgoing handovers per handover cause . 33
4.3.1.3.2 Successful outgoing handovers per handover cause . 34
4.3.1.3.3 Number of handover failures related with MRO . 34
4.3.1.4 Intra- / Inter-frequency Handover related measurements . 36
4.3.1.4.1 Attempted outgoing intra-frequency handovers . 36
4.3.1.4.2 Successful outgoing intra-frequency handovers . 36
4.3.1.4.3 Attempted outgoing inter-frequency handovers – gap-assisted measurement . 36
4.3.1.4.4 Successful outgoing inter-frequency handovers – gap-assisted measurement. 37
4.3.1.4.5 Attempted outgoing inter-frequency handovers – non gap-assisted measurement . 37
4.3.1.4.6 Successful outgoing inter-frequency handovers – non gap-assisted measurement . 37
4.3.1.5 Handover related measurements for DRX / non-DRX . 38
4.3.1.5.1 Attempted outgoing handovers with DRX . 38
4.3.1.5.2 Successful outgoing handovers with DRX . 38
4.3.1.5.3 Attempted outgoing handovers non-DRX . 38
4.3.1.5.4 Successful outgoing handovers non-DRX . 39
4.3.1.6 Handover to cells outside the RN related measurements . 39
4.3.1.6.1 Attempted preparations of outgoing handovers to the cells outside the RN . 39
4.3.1.6.2 Attempted executions of outgoing handover to the cells outside the RN per handover cause . 39
4.3.1.6.3 Successful executions of outgoing handover to the cells outside the RN per handover cause . 40
4.3.1.7 Handover triggering measurements . 40
4.3.1.7.1 Average quality of the serving cell when HO is triggered . 40
4.3.1.7.2 Average quality of the neighboring cell when HO is triggered . 41
4.3.2 Inter-RAT Handovers . 41
4.3.2.1 Measurements related to inter-RAT Handovers – target cell of 3GPP and non-3GPP network
technology . 41
4.3.2.1.1 Attempted outgoing inter-RAT handovers per handover cause . 41
4.3.2.1.2 Successful outgoing inter-RAT handovers per handover cause . 42
4.3.2.1.3 Number of outgoing unnecessary handovers related with inter-RAT MRO . 42
4.4 Cell level radio bearer QoS related measurements . 43
4.4.1 Cell PDCP SDU bit-rate . 43
4.4.1.1 Average DL cell PDCP SDU bit-rate . 43
4.4.1.2 Average UL cell PDCP SDU bit-rate . 43
4.4.1.3 Maximum DL cell PDCP SDU bit-rate . 44
4.4.1.4 Maximum UL cell PDCP SDU bit-rate . 44
4.4.1.5 Average DL cell control plane PDCP SDU bit-rate . 44
4.4.1.6 Average UL cell control plane PDCP SDU bit-rate . 45
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 32.425 version 15.2.0 Release 15 5 ETSI TS 132 425 V15.2.0 (2019-04)
4.4.2 Active UEs . 45
4.4.2.1 Average number of active UEs on the DL . 45
4.4.2.2 Average number of active UEs on the UL . 45
4.4.3 Packet Delay and Drop Rate . 46
4.4.3.1 Average DL PDCP SDU delay . 46
4.4.3.2 DL PDCP SDU drop rate . 46
4.4.4 Packet loss rate . 47
4.4.4.1 DL PDCP SDU air interface loss rate . 47
4.4.4.2 UL PDCP SDU loss rate . 47
4.4.5 IP Latency measurements . 48
4.4.5.1 IP Latency in DL, E-RAB level . 48
4.4.6 IP Throughput measurements . 48
4.4.6.1 IP Throughput in DL . 48
4.4.6.2 IP Throughput in UL . 49
4.4.6.3 Number of kbits of Scheduled IP Throughput in DL . 49
4.4.6.4 Number of kbits of Scheduled IP Throughput in UL . 50
4.4.6.5 Time duration of Scheduled IP Throughput in DL . 50
4.4.6.6 Time duration of Scheduled IP Throughput in UL . 50
4.4.6.7 DL scheduled IP throughput distribution . 51
4.4.6.8 UL scheduled IP throughput distribution . 51
4.4.7 PDCP data volume measurements . 52
4.4.7.1 DL cell PDCP SDU Data Volume . 52
4.4.7.2 UL cell PDCP SDU Data Volume . 52
4.5 Radio resource utilization related measurements . 53
4.5.1 DL PRB Usage for traffic . 53
4.5.2 UL PRB Usage for traffic . 53
4.5.3 DL Total PRB Usage . 54
4.5.4 UL Total PRB Usage . 54
4.5.5 RACH Usage . 54
4.5.5.1 Mean number of RACH preambles received . 54
4.5.5.2 Distribution of RACH preambles sent . 55
4.5.5.3 Distribution of RACH access delay . 55
4.5.5.4 Percentage of contentious RACH attempts . 56
4.5.5.5 Number of UE RACH reports received . 56
4.5.5.6 Percentage of time when all dedicated RACH preambles are used. 56
4.5.6 Cell Unavailable Time . 57
4.5.7 TB related measurements . 57
4.5.7.1 Total Number of DL TBs . 57
4.5.7.2 Error Number of DL TBs . 57
4.5.7.3 Total Number of UL TBs . 58
4.5.7.4 Error Number of UL TBs . 58
4.5.8 Power utilization measurements . 58
4.5.8.1 Maximum carrier transmit power . 58
4.5.8.2 Mean carrier transmit power . 59
4.5.9 PRB Full Utilisation. 59
4.5.9.1 DL PRB full utilisation . 59
4.5.9.2 UL PRB full utilisation . 59
4.5.10 Distribution of DL total PRB ssage . 60
4.5.11 Distribution of UL total PRB usage . 60
4.6 UE-associated logical S1-connection related measurements . 60
4.6.1 UE-associated logical S1-connection establishment . 60
4.6.1.1 Attempted UE-associated logical S1-connection establishment from eNB to MME . 60
4.6.1.2 Succesful UE-associated logical S1-connection establishment from eNB to MME . 61
4.7 Paging related measurements . 61
4.7.1 Paging Performance .
...

  • Relates Information
  • ISO 8130-9:1992

    ISO 8130-9:1992 - Coating powders
    09-28
  • EN 352-2:2020/FprA1

    EN 352-2:2021/oprA1:2023
    09-28
  • IEC TS 61158-4:1999

    IEC TS 61158-4:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 4: Data Link protocol specification Released:3/24/1999 Isbn:2831847656
    09-28
  • HD 566 S1:1990

    HD 566 S1:1998
    09-28
  • ISO 5131:1982/Amd 1:1992

    ISO 5131:1982/Amd 1:1992
    09-28
  • EN 60598-2-22:1990

    EN 60598-2-22:1996
    09-27
  • ISO 8504-2:1992

    ISO 8504-2:1992 - Preparation of steel substrates before application of paints and related products -- Surface preparation methods
    09-27
  • EN 12165:2024

    prEN 12165:2022
    09-27
  • IEC TS 61158-6:1999

    IEC TS 61158-6:1999 - Digital data communications for measurement and control - Fieldbus for use in industrial control systems - Part 6: Application Layer protocol specification Released:3/24/1999 Isbn:2831847613
    09-27
  • ISO 4252:1992

    ISO 4252:1992 - Agricultural tractors -- Operator's workplace, access and exit -- Dimensions
    09-27